Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹28.4 LAccepted-AOC 19192 STREET NO 8 BIBI WALA ROAD OPPOSITE DAV COLLEGE BATHINDA PUNJAB PIN 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹28.4 L Quoted ₹28.6 L | L-1 | Accepted-AOC Lowest and Reasonable |
| 2 | L-2₹28.8 L+₹19,410 (0.68%)Rejected-Finance 2 B KRISHNA NAGAR AMBALA CANTT | AMBALA | HARYANA | 133001 | ₹28.8 L+₹19,410 (0.68%) | L-2 | Rejected-Finance Other than lowest |
| 3 | L-3₹30.5 L+₹1.9 L (6.51%)Rejected-AOC | ₹30.5 L+₹1.9 L (6.51%) | L-3 | Rejected-AOC Other than Lowest |
| 4 | L-4₹31.9 L+₹3.3 L (11.5%)Rejected-Finance | ₹31.9 L+₹3.3 L (11.5%) | L-4 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | Airen Builders L4 | M/S MANI GARG CONTRACTOR L1 | Puneet Sharma L2 | MS FUTEC ENGINEERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in soft/loose soil not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth and getting out, complete all as specified and directed by the Engineer-in-Charge. | 140 | Cubic Metre | 450 ₹63,000 | 170 ₹23,800 Lowest | 250 ₹35,000 | 200 ₹28,000 |
| 2.00 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25 cm depth in soils, complete all as specified and directed by the Engineer-in-Charge. | 90 | Cubic Metre | 100 ₹9,000 | 40 ₹3,600 | 35 ₹3,150 Lowest | 50 ₹4,500 |
| 3.00 | Removal of excavated material to a distance exc 1.50 km but n exc 5 km and complete all as specified and directed by the Engineer-in-Charge. | 50 | Cubic Metre | 300 ₹15,000 | 150 ₹7,500 | 70 ₹3,500 Lowest | 100 ₹5,000 |
| 4.00 | Demolition of brick work built in cement mortar in any position and in any location complete all as specified and directed by the Engineer-in-Charge. | 60 | Cubic Metre | 200 ₹12,000 | 150 ₹9,000 Lowest | 150 ₹9,000 Lowest | 300 ₹18,000 |
| 5.00 | M&L brick work with sub Class ‘B’ bricks straight or curved on plan exceeding 6m mean radius built in cement mortar 1:4 in any location, complete all as specified and directed by the Engineer-in-Charge. | 40 | Cubic Metre | 4,000 ₹1,60,000 | 3,600 ₹1,44,000 | 4,700 ₹1,88,000 | 3,500 ₹1,40,000 Lowest |
| 6.00 | All as per item No 5 here-in-before but except bricks. | 20 | Cubic Metre | 2,300 ₹46,000 | 1,800 ₹36,000 Lowest | 2,200 ₹44,000 | 2,200 ₹44,000 |
| 7.00 | Taking down cement plaster on any surfaces including raking out joints, hacking for key, scrubbibg down with water etc. complete all as specified & directed by Engr-in-Charge. | 600 | Square Metre | 15 ₹9,000 Lowest | 20 ₹12,000 | 20 ₹12,000 | 20 ₹12,000 |
| 8.00 | M & L for Rendering 15 mm thick on brick /concrete surfces in Cement Mortar 1:4 finished even & smooth without using extra cement & with/without WPC, complete all as specified & directed by Engr-in-Charge. NOTE : WPC will be paid separately. | 800 | Square Metre | 160 ₹1,28,000 | 180 ₹1,44,000 | 180 ₹1,44,000 | 150 ₹1,20,000 Lowest |
| 9.00 | M&L for preparation of new plaster surface applying two coats of cement base paint on walls complete all as specified and directed by Engr-in-Charge. | 600 | Square Metre | 16 ₹9,600 Lowest | 18 ₹10,800 | 20 ₹12,000 | 25 ₹15,000 |
| 10.00 | Demolition of 150 mm bore SGSW/NP2 drain pipes including PCC haunching and bedding jointed in cement mortar and taking out including removal, complete all as specified and directed by the Engineer-in-Charge. | 250 | Running Metre | 100 ₹25,000 | 20 ₹5,000 Lowest | 20 ₹5,000 Lowest | 50 ₹12,500 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
25 Aug 2026, 6:00 pmClosed
GE (AF) MC CHANDIGARH
GE (AF) MC CHANDIGARH
CLEANING OF MANHOLES SEWAGE LINES AND CERTAIN MISC REPAIRS INCLUDING CONNECTED WORKS IN OMQs AND SMQs SECTOR 31 AT 3 BRD UNDER GE (AF) MC CHANDIGARH
2026_MES_781345_1
GE (AF) MC/CHD/T-45/2026-27
Open Tender
Civil Works
Item Rate
180 days
CHANDIGARH
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) MC CHANDIGARH
₹80,000
Yes
25 Sept 2026
28 Jul 2026
27 Aug 2026
28 Jul 2026
25 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches in soft/loose soil not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth and getting out, complete all as specified and directed by the Engineer-in-Charge. | 140 | Cubic Metre | 1 | ₹140 |
| 2 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25 cm depth in soils, complete all as specified and directed by the Engineer-in-Charge. | 90 | Cubic Metre | 1 | ₹90 |
| 3 | Removal of excavated material to a distance exc 1.50 km but n exc 5 km and complete all as specified and directed by the Engineer-in-Charge. | 50 | Cubic Metre | 1 | ₹50 |
| 4 | Demolition of brick work built in cement mortar in any position and in any location complete all as specified and directed by the Engineer-in-Charge. | 60 | Cubic Metre | 1 | ₹60 |
| 5 | M&L brick work with sub Class ‘B’ bricks straight or curved on plan exceeding 6m mean radius built in cement mortar 1:4 in any location, complete all as specified and directed by the Engineer-in-Charge. | 40 | Cubic Metre | 1 | ₹40 |
| 6 | All as per item No 5 here-in-before but except bricks. | 20 | Cubic Metre | 1 | ₹20 |
| 7 | Taking down cement plaster on any surfaces including raking out joints, hacking for key, scrubbibg down with water etc. complete all as specified & directed by Engr-in-Charge. | 600 | Square Metre | 1 | ₹600 |
| 8 | M & L for Rendering 15 mm thick on brick /concrete surfces in Cement Mortar 1:4 finished even & smooth without using extra cement & with/without WPC, complete all as specified & directed by Engr-in-Charge. NOTE : WPC will be paid separately. | 800 | Square Metre | 1 | ₹800 |
| 9 | M&L for preparation of new plaster surface applying two coats of cement base paint on walls complete all as specified and directed by Engr-in-Charge. | 600 | Square Metre | 1 | ₹600 |
| 10 | Demolition of 150 mm bore SGSW/NP2 drain pipes including PCC haunching and bedding jointed in cement mortar and taking out including removal, complete all as specified and directed by the Engineer-in-Charge. | 250 | Running Metre | 1 | ₹250 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_875293.xls
BOQ • 0.34 MB
TenderDocument45.pdf
Tender Documents • 1.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .