Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.2 LAdmitted-Finance 3 7 1 THIMMAPUR LUXETTIPET TELANGANA 504215 | MANCHERIAL | TELANGANA | 504215 | ₹35.2 L | L1 | Admitted-Finance |
| 2 | L2₹37.8 L+₹2.6 L (7.30%)Admitted-Finance | ₹37.8 L+₹2.6 L (7.30%) | L2 | Admitted-Finance |
| 3 | L3₹41.8 L+₹6.6 L (18.7%)Admitted-Finance | ₹41.8 L+₹6.6 L (18.7%) | L3 | Admitted-Finance |
| 4 | L4₹47.3 L+₹12.1 L (34.2%)Admitted-Finance | ₹47.3 L+₹12.1 L (34.2%) | L4 | Admitted-Finance |
| 5 | L5₹47.5 L+₹12.3 L (34.8%)Admitted-Finance | ₹47.5 L+₹12.3 L (34.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ATUL ENTERPRISES L7 | SAI RUPA CONSTRUCTIONS L6 | G RANGA RAO L4 | M/S V PRATAP REDDY L5 | MEGHANA ENTERPRISES L3 | GADUSU RAMESH CONTRACTOR L1 | Vara Enterprises L8 | SRI VARADA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L Preparation of plastered or unplastered old decorated surfaces of walls including filling of cracks with approved crack filler and applying one coat of white wash complete all as specified and directed.
Note: Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 10,000 | Sqm | 29 ₹2,90,000 | 35 ₹3,50,000 | 32 ₹3,20,000 | 31 ₹3,10,000 | 8.5 ₹85,000 Lowest | 13 ₹1,30,000 | 35 ₹3,50,000 | 25 ₹2,50,000 |
| 2.00 | All as per item No. 1 above but one coat of white wash on ceiling surfaces including filling of cracks with approved crack filler complete all as specified and directed.
Note: Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 2,000 | Sqm | 31 ₹62,000 | 35 ₹70,000 | 33 ₹66,000 | 32 ₹64,000 | 11 ₹22,000 Lowest | 14 ₹28,000 | 36 ₹72,000 | 26 ₹52,000 |
| 3.00 | M&L Preparation of plastered or unplastered old surfaces of ceiling and applying one coat of oil bound distemper including filling of cracks with approved crack filler complete all as specified and directed.
Note: Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 500 | Sqm | 33 ₹16,500 | 40 ₹20,000 | 35 ₹17,500 | 35 ₹17,500 | 38 ₹19,000 | 26 ₹13,000 Lowest | 40 ₹20,000 | 32 ₹16,000 |
| 4.00 | M&L Preparation of plastered or unplastered stopping of distempered surfaces of walls including filling of cracks with approved crack filler and applying one coat of OBD white/ coloured complete all as specified and directed.
Note : Oil bound distemper will be done by roller only, after complete removal of old loose flakes. Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 5,120 | Sqm | 44 ₹2,25,280 | 45 ₹2,30,400 | 41 ₹2,09,920 | 42 ₹2,15,040 | 45 ₹2,30,400 | 33 ₹1,68,960 Lowest | 45 ₹2,30,400 | 38 ₹1,94,560 |
| 5.00 | M&L complete removal of existing treatment on wall surfaces and applying two coats of oil bound distemper complete all as specified and directed.
Note: Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 13,000 | Sqm | 55 ₹7,15,000 | 58 ₹7,54,000 | 54 ₹7,02,000 | 55 ₹7,15,000 | 40 ₹5,20,000 Lowest | 45 ₹5,85,000 | 55 ₹7,15,000 | 47 ₹6,11,000 |
| 6.00 | Material and labour for complete removal of existing treatment on wall surfaces and applying two coats of oil bound distemper over a coat of alkali resistant primer over 1 mm thick wall care putty complete all as specified and directed.
Note : Oil bound distemper will be done by roller only, after complete removal of old loose flakes and Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.complete all as specified and directed. | 5,000 | Sqm | 77 ₹3,85,000 | 104 ₹5,20,000 | 104 ₹5,20,000 | 105 ₹5,25,000 | 70 ₹3,50,000 Lowest | 75 ₹3,75,000 | 110 ₹5,50,000 | 106 ₹5,30,000 |
| 7.00 | Material and labour for applying one coat of exterior emulsion paint (weather proof) on old treated wall surfaces complete all as specified and directed. Make :APEX ULTIMA of Asian Paint or equavalent Note : APEX ULTIMA paint will be done by roller only, after complete removal of old loose flakes complete all as specified and directed.
Note: Wall, Roof hight portion upto ht 15m incl necessary scaffolding to be provided. | 2,000 | Sqm | 83 ₹1,66,000 | 75 ₹1,50,000 | 72 ₹1,44,000 | 72 ₹1,44,000 | 120 ₹2,40,000 | 60 ₹1,20,000 Lowest | 90 ₹1,80,000 | 71 ₹1,42,000 |
| 8.00 | Material and labour for complete removal of existing treatment, preparation of surfaces of wall and applying two coats of exterior emultion weather proof paint over a coat of primer complete all as specified and directed.
Make :APEX ULTIMA of Asian Paint or equavalent.
Note : APEX ULTIMA paint will be done by spray only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 500 | Sqm | 88 ₹44,000 | 81 ₹40,500 | 81 ₹40,500 | 81 ₹40,500 | 190 ₹95,000 | 75 ₹37,500 Lowest | 95 ₹47,500 | 83 ₹41,500 |
| 9.00 | M&L for uprooting of wild trees such as grass/bushes etc from the roof / wall surfaces / AC sheets/soil pipes surrounding including its penetrated roots with suitable cleaning chemical and making good to the damaged plaster by providing CM 1:3 and finish the surfaces to match with the existing surface complete all as specified and as directed. Note: Wall, Roof hight portion upto ht 15m incl necessary scaffolding to be provided. | 40 | Each Job | 63 ₹2,520 | 62 ₹2,480 | 60 ₹2,400 | 60 ₹2,400 | 1,000 ₹40,000 | 46 ₹1,840 Lowest | 70 ₹2,800 | 65 ₹2,600 |
| 10.00 | Material and labour for preparation of old surfaces of walls and applying one coat of cement based paint including external scaffolding work including filling of cracks with approved crack filler complete all as specified and directed. Note : cement based paint will be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 30,000 | Sqm | 66 ₹19,80,000 | 58 ₹17,40,000 | 55 ₹16,50,000 | 55 ₹16,50,000 | 49 ₹14,70,000 | 40 ₹12,00,000 | 60 ₹18,00,000 | 32 ₹9,60,000 Lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
20 Aug 2026, 6:00 pmClosed
RAMESH CHANDRA MEENA
GARRISON ENGINEER (SOUTH), MUDFORT, SECUNDERABAD
PERIODICAL SERVICES AND MAINTENANCE TO OTM AND MD ACCN AT OTHER THAN AOC CENTRE UNDER AGE B/R (S) NO.II OF GE (SOUTH) SECUNDERABAD.
2026_MES_766577_2
GE(S)/SEC/TOKEN-43 OF 2026-27
Open Tender
Civil Works
Item Rate
270 days
GE SOUTH, MUDFORT, SECUNDERABAD
For Enlisted contractors class D and above category a (i) and for unenlisted contractors meeting the eligibility criteria of above class and category for along eligible class with EMD
6 documents required · 6 mandatory
₹500
GARRISON ENGINEER (SOUTH), MUDFORT, SECUNDERABAD
₹98,000
Yes
3 Sept 2026
31 Jul 2026
22 Aug 2026
31 Jul 2026
20 Aug 2026
14 Aug 2026
31 Jul 2026 - 13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L Preparation of plastered or unplastered old decorated surfaces of walls including filling of cracks with approved crack filler and applying one coat of white wash complete all as specified and directed.
Note: Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 10,000 | Sqm | - | - |
| 2 | All as per item No. 1 above but one coat of white wash on ceiling surfaces including filling of cracks with approved crack filler complete all as specified and directed.
Note: Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 2,000 | Sqm | - | - |
| 3 | M&L Preparation of plastered or unplastered old surfaces of ceiling and applying one coat of oil bound distemper including filling of cracks with approved crack filler complete all as specified and directed.
Note: Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 500 | Sqm | - | - |
| 4 | M&L Preparation of plastered or unplastered stopping of distempered surfaces of walls including filling of cracks with approved crack filler and applying one coat of OBD white/ coloured complete all as specified and directed.
Note : Oil bound distemper will be done by roller only, after complete removal of old loose flakes. Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 5,120 | Sqm | - | - |
| 5 | M&L complete removal of existing treatment on wall surfaces and applying two coats of oil bound distemper complete all as specified and directed.
Note: Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 13,000 | Sqm | - | - |
| 6 | Material and labour for complete removal of existing treatment on wall surfaces and applying two coats of oil bound distemper over a coat of alkali resistant primer over 1 mm thick wall care putty complete all as specified and directed.
Note : Oil bound distemper will be done by roller only, after complete removal of old loose flakes and Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.complete all as specified and directed. | 5,000 | Sqm | - | - |
| 7 | Material and labour for applying one coat of exterior emulsion paint (weather proof) on old treated wall surfaces complete all as specified and directed. Make :APEX ULTIMA of Asian Paint or equavalent Note : APEX ULTIMA paint will be done by roller only, after complete removal of old loose flakes complete all as specified and directed.
Note: Wall, Roof hight portion upto ht 15m incl necessary scaffolding to be provided. | 2,000 | Sqm | - | - |
| 8 | Material and labour for complete removal of existing treatment, preparation of surfaces of wall and applying two coats of exterior emultion weather proof paint over a coat of primer complete all as specified and directed.
Make :APEX ULTIMA of Asian Paint or equavalent.
Note : APEX ULTIMA paint will be done by spray only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 500 | Sqm | - | - |
| 9 | M&L for uprooting of wild trees such as grass/bushes etc from the roof / wall surfaces / AC sheets/soil pipes surrounding including its penetrated roots with suitable cleaning chemical and making good to the damaged plaster by providing CM 1:3 and finish the surfaces to match with the existing surface complete all as specified and as directed. Note: Wall, Roof hight portion upto ht 15m incl necessary scaffolding to be provided. | 40 | Each Job | - | - |
| 10 | Material and labour for preparation of old surfaces of walls and applying one coat of cement based paint including external scaffolding work including filling of cracks with approved crack filler complete all as specified and directed. Note : cement based paint will be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided. | 30,000 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
8965enderdocuments.pdf
Tender Documents • 2.93 MB
BOQ_876060.xls
BOQ • 0.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .