| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LQualified | ₹2.7 L | L1 | Qualified |
| 2 | L2₹2.8 LQualified 101 NEAR ABAD MARKET DODHPUR ALIGARH ALIGARH UTTAR PRADESH 202001 UDYAM UP 02 0008759 | ALIGARH | UTTAR PRADESH | 202001 | ₹2.8 L | L2 | Qualified |
| 3 | L3₹3.6 LQualified PLOT NO 4 B BASEMENT B 5 GORDHAN ENCLAVE BEHIND RELIANCE SMART BHAWANI SINGH ROAD C SCHEME JAIPUR RAJASTHAN 302005 UDYAM RJ 17 0299686 | JAIPUR | RAJASTHAN | 302005 | ₹3.6 L | L3 | Qualified |
| 4 | L4₹7.0 LQualified AMBEDKAR NAGAR SHAKTI NAGAR SONEBHADRA 231222 | SONBHADRA | UTTAR PRADESH | 231222 | ₹7.0 L | L4 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
29 Dec 2025, 1:00 pmClosed
Copper Alloy Gate Valve for Waterworks Purpose as per IS 778 (Q3)
Sluice Valve For Water Works Purposes (50 To 1200 Mm Size) (V2) As Per Is 14846 (Q3)
Swing Check Type Reflux Valves for Water Works Purposes (Single Door Pattern) (V2) as per IS 5312 (Part1) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria
Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7021896 Dated : 19-12-2025 Bid Document 1/12
-- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Copper Alloy Gate Valve for Waterworks Purpose as per IS 778 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
8737123
GEM/2025/B/7021896
Two Packet Bid
Copper Alloy Gate Valve for Waterworks Purpose as per IS
30 days
Kumar140124Bhakra Beas Management Board, Irrigation Wing, NANGAL TOWNSHIP
Total value wise evaluation
PRODUCT
3 documents required · 3 mandatory
Exempted
19 Dec 2025
19 Dec 2025
29 Dec 2025
Copper Alloy Gate Valve for Waterworks Purpose as per IS 778 (Q3)
Sluice Valve For Water Works Purposes (50 To 1200 Mm Size) (V2) As Per Is 14846 (Q3)
Swing Check Type Reflux Valves for Water Works Purposes (Single Door Pattern) (V2) as per IS 5312 (Part1) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria
Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7021896 Dated : 19-12-2025 Bid Document 1/12
-- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Copper Alloy Gate Valve for Waterworks Purpose as per IS 778 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8737123.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER