| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | L1 | Accepted-AOC L1 ADMIT | |
| 2 | L2₹15.4 L+₹34,887.55 (2.31%)Rejected-AOC NO 3 131 BALAJI STREET INDIAN BANK COLONY NARAYANAPURAM MADURAI 625 014 | MADURAI | TAMIL NADU | 625014 | L2 | Rejected-AOC L2 | |
| 3 | L3₹16.0 L+₹92,762.82 (6.14%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹15.7 L
EMD Value
₹15,725
Closing Date
26 Jun 2023, 3:00 pmClosed
commissioner madurai corporation
Aringar Anna Maligai
Construction of Minor Bridge Across at Sarathi Nagar Extension (Velammal School Road) in ward no.7
2023_MAWS_325133_1
E2/Est.No.138/22-23
Open Tender
Civil Works
Lump-sum
60 days
Aringar Anna Maligai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹15,725
2 Aug 2023
9 Jun 2023
26 Jun 2023
9 Jun 2023
26 Jun 2023
9 Jun 2023
Amount
Dismantling the existing damaged reinforced cement concrete slab and wall surface and clearing away from the site etc.complete.., TWAD-DATA-P-311
Dismantling the existing damaged Brick/stone masonry in Cement mortar walls under 3 m high and clearing away from the site etc.complete.., TWAD-DATA-P-290
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP-BUILDING DATA-P-25-SL No:1
Supplying and filling in foundation and basement with filling quarry dust in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc. MDU-CORP-BUILDING DATA-P-27-SL No:5
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. MDU-CORP-BUILDING DATA-P-28-SL No:10
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2. MDU-CORP-BUILDING DATA-P-31-SL No:14
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. Bottom Only MDU-CORP-BUILDING DATA-P-31-SL No:14
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in F&B. MDU-CORP-BUILDING DATA-P-32-SL No:15
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia MDU-CORP-BUILDING DATA-P-38-SL No:22
Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete For Foundation and Basement. MDU-CORP-BUILDING DATA-P-41-SL No:27
Plastering with cement mortar (1:5), 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) MDU-CORP-BUILD-DATA-P (46) - Sl (43)
Plain Cement Concrete 1:1.5:3 (one cement, one and half fine aggregates and three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification MDU-CORP-BUILD-DATA-P (27) - Sl (7)
Painting 2 coats with approved cement paint over cement plastered wall surface, ceiling and other new surface and including cleaning, preparing the surface and curing etc., complete. MDU-CORP-BUILDING DATA-P-60-SL No:80
Add GST 18%
V PANDI
V BOSE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .