Tender Value
Refer Docs
EMD Value
₹82,500
Closing Date
7 Mar 2022, 6:00 pmClosed
CWE Patiala
HQ CWE, Bldg No 26, New Lal Bagh, Patiala 147001
PROVN OF SOLAR POWER PLANT 25 KVA EACH IN THREE SECTORS AT PATIALA MIL STN UNDER GE NORTH PATIALA
2022_MES_508369_1
8321/PAT/T-79/E8
Open Tender
Civil Works
Item Rate
150 days
Patiala
As per cover 1
6 documents required · 6 mandatory
₹500
Yes
GE North Patiala
₹82,500
Yes
14 Mar 2022
16 Feb 2022
9 Mar 2022
16 Feb 2022
7 Mar 2022
2 Mar 2022
16 Feb 2022 - 23 Feb 2022
Amount
Design, procure, erect install, test and commission including connecting to local utility grid, Grid connected solar photovoitaic plant of 25 kWp capacity (roof top) including solar photovoitaic Module, DC Cabling, Module Mounting Structures,, Combining Boxes, Lightning Protection of SPV modules, and other accessories, string inverter, consisting of following main components:-
Poly Crystaline Silicon Solar Photovolaic minimum of 315 Wp for 25 kWp capacity having efficiency 16.28% min under standard conditions, form fill factor more than 0.74, plant performance ratio > 75% , made of high transmitivity glass front surface and it shall give high encapsulation gain ( transmittance above 90% and bending less than 0.3%). The electrical parameters of SPV modules under standard test condition of irradiance 1000 W/sqm2, AM 1.5 Spectrum and temp 25 degree Celsius shall be as under Max Peak Power Pmax > 315W Voltage at Max Power :>38.81V Current at Pmax: >8.12 A Short Circuit Current : > 8.84 A Open Circuit Voltage: >45.94 Module Efficiency: > 16.28% .
(a) Rated outputof the modules shall have positive tolerance of 3-5% and no negative tolerance is allowed. (b) It shall perform satisfactority in RH 85% with temperature up to +85 degree C and should withstand wind of 150 kmph on the surface of panel. (c) PV modules shall be warrented for their output peak watt capacity, and it shall not fall of its initial value below 90% in first 10 year end and 80% after the end of 25 years and 10 year against manufacturing defects. (d) Each module shall have RFID tag encapsulated with solar cell bearing following details: Name of manufacture of SPV Module, Name of Manufacturer of solar cell and module) country of Origin ( both cell and module) Peak wattage, Im, Vm and fill factor of the module IV curve of module. (e) The temperature coefficient of the module shall not be more than 0.50% degree celcius.
(f) PV modules must confirm to latest edition of IEC 61215/ IS 14286. In addition the modules must confirm to IEC 61730 Part I and II for construction and testing & safety qualifications and confirming to IEC 62804 PID. (g) It shall also be in confirmity to latest minimum technical specification issued by MNRE from time to time. Modules should be of 48 cell configuration and should be of MNRE approved companies/agencies in category/ rating 'SA-1A' . (h) Provision of earthing and earth strip/ cable etc for earth of solar PV module/ array etc as per latest IS/MNRE norms to be provided and cost of the same is deemed to be included in the item and no extra amount will be paid to the contractor on this account. (i) Both cell and SPV modules shall be made in India and must conform to DSR norms of MNRE (j) The minimum net annual generation shall be 1500 units per kilowatt.
(k)DC Cables & AC Cables: Suitable size of XLPE insulated tinned copper cable of solar grade, 1100 volt and UV resistant for outdoor installations confirming to IEC 60227/15694 & 60502/ is 1554 (Pt& I&II) of minium size as per OEM specification. All cables and connectors for use of installation shall be of solar grade which can withstand harsh environmental conditions including high temperature, UV radiations, rain, dirt,burial and attack by moss and microbes for 25 years and voltage as per latest IEC/IS. All the cables/wires shall be provided with UV resistant printed ferrules for DC side .The size of the cable shall be such that average voltage drop at full power from PV module to inverter shall be less than 1.5%. The AC cables along with AC DB with necessary arrangement to Connect with the existing power supply to be done. The size of XLPE LT cable shall be got approved from GE. Cable batch no,drum no, IS code and size and make shall be metioned on every one meter or as per OEM practice .The wiring of the module interconnection shall be in suitable size UPVC/HDPE pipe. The cost of interconnecting DC copper cable, and earth work for trenches suitable to accommodate solar grade cables from SPV module upto inverters are included in the item.
(l) Module Mounting Structure: Design, procure, fixing, support structure made of hot dipped galvanisized iron with min 85 micron thickness including necessary PCC foundation and associated work and fixing mounting arrangement suitable for SPV modules so as it can withstand wind speed of 150km per hour. The array mounted structure has to be so designed that it occupies minimum space without sacrificing the output of SPV panels, Nuts, bolts,mounting structure including module mounting structure shall have to be adequately protected from atmosphere and weather prevailing in the area. All the modules fixing fastners shall be of stainless steel of grade SS316.The module mounting structure to be fixed tilt to optimise the maximum generation in a year. MMS design shall be supported with stadpro report and submitted for the approval of the acepting officer. Cost of all equipments, copper strip up to earth test point and earthing etc are included in this item. The cost of sufficient earthing for lightning protection is included in this item and no extra payment will be made to the contractor on this account.
(m) String Inverter: Procure, fixing, testing and commissioning of 25 KW -1 No 50 + 3 Hz (min) 3 phase 460 volt, THD< 3%, at nominal power inverter suitable to convert DC power of solar PV module/arry/ to AC for further feeding to grid confirming to IEC 61683 for efficiency, IEC 62109 or equivalent for safety and IEC 62093 for reliability. The input DC technical specification of 25 KW inverter are as under: Input (DC) DC Voltage Range: 530 - 800V Max DC Voltage: 600 V Nominal Power : 25 kW Max output power : 25 kW Nominal AC current : as per standards Nominal OUTPUT VOLTAGE: 460V Output Frequency : 50/60 Hz Harmonic Distortion current : < 3% Efficiency : 98.3% Standby operation consumption (feed in) : < 30 W
(n) Operating temperature up to 85 degree centigrade. The inverter shall have minimum IP 65 protection, ground fault monitoring, grid monitoring, protection against anti-islanding, DC reverse polarity, AC and DC short circuit current and over current, AC and DC over voltage and temperature. The inverter shall adjust voltage and frequency levels to suit the grid. The inverter shall be self commulated with pulse Width Modulation (PWM) technology and shall be capable of synchronise maximum with in one min. Maximum power point Tracker (MPPT) confirming to IEC 62093 shall be integrated in the inverter to maximum the energy drawn from the PV array. The inverter shall be suitable nos of protected inputs (as per design) and outgoing shall be protected by Surge protections (MOVs). The inverter shall be provided with protection class I (IEC 62103). The inverter should have MODBUS, PROFIBUS, ETHERNET communication ports. The inverter shall include appropriate self protection and self diagnostic feature to protect itself and the PV array from the damage in the event of the inverter componant failure or from parameters beyond the inverters safe operating due to internal and / or external causes. Inverter shall have protection arrangement against ground leakage faults, over voltage, (SPD) and over current. Inverter should interface with Ethemet, RS485, irradiation and temperature sensor, Auxilary equipment, power supply and external stop signal. Should have residual monitoring system.
(o) CT Operated Three Phase Net Meter. Supply and Installation of IS16444 CT Operated Three Phase Smart Meter with the following specifications: • AC Three Phase Four Wire, Tamper Proof, Static Meter of Class 1.0, 415 V, 50 Hz, 05-10 A • The meter would be configured as net meter • Meter Should support the following data : 15/30 min instantaneous data for voltage, current, power factor, power, cumulative import energy, cumulative export energy, cumulative apparent energy and frequency, • Meter should have built-in Cellular 4G Modem to provide connectivity with the energy management software with polycarbon Box
(p) CT. Supply and Fixing Low Tension, Ring Type Current Transformer, Rated Burden 10 VA, Accuracy class 1.0, Frequency 50 Hz. Voltage class 660 volts effectively earthed, 60/5 A to 800/5A (as directed by the engineer) complete all as specified.
(q) Energy Management Software. Supply and Configuration of the Web based Software per meter compatible with the energy meter with following modules: (i) Meter Data Management Module shall would be responsible for collecting the data from the concentrator and make the data available to the billing system. The meter data management system would capture and provide the following data: (A) 30 min instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency (B) Daily and Monthly Reading Data (ii) Calculation Module: The software would allow setting up formula for the solar capacity utilization/ Transformer capacity utilization reports (iii) Web site: There would be a dedicated website for the team of Engineer in Charge to view all the data and information. (iv) All the data should be available in Mobile apps (v) Energy Accounting Module The system would include features of energy accounting. The system would allow setting up the formula for the energy accounting.. (vi) Meter Master Data The system would support meter master data repository. The system would support meter replacement process. (vii) Excel Export The system would support export of metering and billing data in excel format. Note: The software shall include GPRS charges and comprehensive support for the system for 5 years, however, AMC would be payable after 5 years.
dinesh enterprises
RAAPS CONSTRUCTION
Sunskrity Energy Pvt Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .