Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC 36 151 E 73 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | 1 | Accepted-AOC L1 |
Tender Value
Refer Docs
EMD Value
₹1,700
Closing Date
25 Apr 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM Unit I Replacing the existing defective Constant and variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during Unit I AOH 2024
2024_EB_429693_1
CE /MTPS-I/ SE/ M-I /TM / OT.506 / 2023-24
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹1,700
Yes
18 Feb 2025
23 Feb 2024
26 Apr 2024
23 Feb 2024
25 Apr 2024
23 Feb 2024
Amount
Transporting the Constant & variable Load Hangers – 3 Nos from Central Store to Repair bay-II and to work spot and transporting the released defective Constant load hangers - 3 Nos from work spot to Central store.
Providing scaffolding arrangements for Dismantling the existing Constant Load Hangers for erection and commissioning the new hangers
Supporting the HRH pipe line and existing Constant Load Hanger assembly by required separate chain block, Removing the constant load hanger and kept on the plat form and lowering the hanger to 4.5 mtr floor level by using chain blocks.
Fixing the base plate, welding the ‘U’ clamps & Tie rods and erecting the new constant load hangers, finally adjusting the Tie rod for required reading and releasing all the chain block from the existing line including providing new Tie rod.
Providing scaffolding arrangements for Dismantling the existing Variable Load Hangers 8/80 for erection and commissioning the new hangers
Supporting the HRH pipe line and existing Variable Load Hanger assembly by required separate chain block, Removing the Variable load hanger 8/80 and kept on the plat form and lowering the hanger to 4.5 mtr floor level by using chain blocks.
Fixing the base plate, welding the ‘U’ clamps & Tie rods and erecting the new Variable load hangers 8/80 finally adjusting the Tie rod for required reading and releasing all the chain block from the existing line including providing new Tie rod.
Consumables & Tools and plants For Item Sl. No :1 to 7
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .