Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC COAL GATE RENUSAGAR PARASI POST RENUSAGAR DISTT SONEBHADRA U P 231220 | RENUSAGAR | SONEBHADRA | U P | 231220 | ₹2.1 L Quoted ₹1.8 L | L1 | Accepted-AOC As per approved TCR |
| 2 | L2₹2.1 LRejected-Finance | ₹2.1 L | L2 | Rejected-Finance As per NIT |
| 3 | L3₹2.2 LRejected-Finance 01 KACHNI MOD KACHANI PO KACHANI DISTT SINGRAULI M P 486886 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486886 | ₹2.2 L | L3 | Rejected-Finance As per NIT |
| 4 | L4₹2.2 LRejected-Finance BANSI POST BINA SONBHADRA UP PIN 231220 | BINA | SONBHADRA | UTTAR PRADESH | 231220 | ₹2.2 L | L4 | Rejected-Finance As per NIT |
| 5 | L4₹2.2 LRejected-Finance | ₹2.2 L | L4 | Rejected-Finance As per NIT |
| Sl No | Description | Qty | Unit | M/S. SAKUR AND SANJAY ENTERPRISES L1 | SHREE SWASTIK CONSTRUCTION COMPANY L5 | SAVITA MECHANICAL AND ENTERPRISES L2 | Saurabh Associates L4 | BIMLA ASSOCIATES L3 | M/s PIPIRANT ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of Old Pipeline, laying, jointing, transportation and installation of GI / MS/ SS pipeline (80 mm or higher), V Groove making, Flange Making, laying on support and jointing as per site condition including NRV, Sluice Valve or any other fitting. | 1,500 | m | 89 ₹1.3 L | 135 ₹2.0 L | 104 ₹1.6 L | 110 ₹1.6 L | 110 ₹1.6 L | 100 ₹1.5 L |
| 2.00 | Laying, jointing, transportation and installation of new GI / MS/ SS pipeline (80 mm or higher), V Groove making, Flange Making, laying on support and jointing as per site condition including NRV, Sluice Valve or any other fitting. | 500 | m | 87 ₹43,500 | 122 ₹61,000 | 110.59 ₹55,295 | 110 ₹55,000 | 105 ₹52,500 | 140 ₹70,000 |
| 3.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - | - | - |
Updated dates
Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
4 Feb 2026, 2:00 pmClosed
Staff Officer (EM), Bina
Office of Area General Manager Bina Project NCL U.P. 231220
Dismantling, Laying, re-installation of 80 / 100 /125 /150 mm or higher pipeline for the purpose of Drinking Water Supply, Fire Fighting Supply and Dust Suppression Water Supply at CHP, Bina Project NCL.
2026_NCL_351465_1
B/EM/eTender/2025-26/69 Dt. 19.01.2026
Open Tender
Electrical and Maintenance Works
180 days
Bina Project
3 documents required · 3 mandatory
₹3,800
16 Mar 2026
19 Jan 2026
6 Feb 2026
19 Jan 2026
4 Feb 2026
20 Jan 2026
19 Jan 2026 - 26 Jan 2026
Dismantling of Old Pipeline, laying, jointing, transportation and installation of GI / MS/ SS pipeline (80 mm or higher), V Groove making, Flange Making, laying on support and jointing as per site condition including NRV, Sluice Valve or any other fitting.
Laying, jointing, transportation and installation of new GI / MS/ SS pipeline (80 mm or higher), V Groove making, Flange Making, laying on support and jointing as per site condition including NRV, Sluice Valve or any other fitting.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_364222.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.92 MB
BOQ_364222.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid