| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.1 CrAccepted-AOC H NO 92 SECTOR 16 17 HISAR | HISAR | HISAR | HARYANA | L1 | Accepted-AOC Yes | |
| 2 | L2₹63.7 Cr+₹1.6 Cr (2.57%)Rejected-Finance 201 2ND FLOOR IRIS TECH PARK SECTOR 48 SOHNA ROAD GURGAON 122018 HARYANA | GURUGRAM | HARYANA | 122018 | L2 | Rejected-Finance Reject |
Tender Value
₹57.2 Cr
EMD Value
₹1.1 Cr
Closing Date
4 Apr 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deputy General Manager V
Deputy General Manager V HSRDC Faridabad
Improvement of connectivity of Faridabad Town with KGP Eway by providing divided carriageway on Ballabgarh Chhainsa Mohna Road from km3.00 bypass road upto km 14.960 interchange at KGP Road ID 3313 in Faridabad Reinvited
2022_HBC_208692_1
694-795
Open Tender
Civil Works - Roads
Works
548 days
Faridabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹50,000
₹1.1 Cr
Yes
SE HSRDC CIRCLE GURUGRAM
25 May 2022
18 Feb 2022
5 Apr 2022
18 Feb 2022
4 Apr 2022
18 Feb 2022
17 Mar 2022
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.[ HSR 5.7.4] | 46.56 | Cum | - | - |
| 2 | Removing hume pipes-NP 2/NP 3/NP 4 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge. Up to 600 mm dia. [HSR 5.53.1] | 53.5 | Rmt | - | - |
| 3 | Demolishing R.C.C. work by mechanical means and stockpiling cum at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. [HSR 5.26] | 34.5 | Cum | - | - |
| 4 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ear1ier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness, as per technical clause 201 of MORT&H specifications. [HSR 17.2.4] | 8.74 | Hectare | - | - |
| 5 | Milling on Bituminous Surface: Dismantling of existing damaged Bitumen surface by cold Milling Machine up to any depth and hauling the milled material up to any lead and stacking at nearest recycling Plant site. [HSR 17.43.2] | 8,344.87 | Cum | - | - |
| 6 | Dismantling of Granular courses and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately. [17.3] | 18,558.75 | Cum | - | - |
| 7 | Removing of existing CC block paveme t including transporting and stacking usable block along road side and dispose unusable blocks outside PWD land or desired by Engineer. [HSR 17.67] | 3,172.75 | Cum | - | - |
| 8 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. [HSR 5.23.1] | 1,575 | Cum | - | - |
| 9 | Excavation for roadwork in soil by mechanical means including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and disposal within all lead and lift as per technical clause 301 of MORT&H specifications [HSR 17.74] | 30,169.84 | Cum | - | - |
| 10 | E/Work in embankment and subgrade in raising portion with soil minimum CBR of 8% obtained from borrow pit with all lead and lift transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305. The filling will be done in such a manner that a minimum 500 mm subgrade is achieved and the top of the subgrade is atleast 600 mm above Natural Surface Level. [HSR 17.6] | 56,268.25 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
DNIT.pdf
Tender Notice • 1.84 MB
BOQ_274697.xls
BOQ Document • 1.21 MB
92781600.pdf
Tender Document • 0.76 MB
92781602.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .