Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 382 KHASRA NO 382 PLOT NO 4 3RD FLOOR MEHRAULI GURGAON ROAD SULTANPUR NEW DELHI SOUTH WEST DELHI DELHI 110030 | SOUTH DELHI | DELHI | 110030 | Admitted-Finance |
| 2 | Admitted-Finance A 503 VARSHA SOCIETY JAGTAP CHOWK WANAWADI PUNE 411040 | PUNE | MAHARASHTRA | 411040 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 213 214 215 HUBTOWN SOLARIS NS PHADKE MARG ANDHERI EAST MUMBAI MUMBAI MAHARASHTRA 400069 | MUMBAI SUBURBAN | MAHARASHTRA | 400069 | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Not compiled the technical parameters of RFP |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
11 Oct 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE DIRECTOR AIR FORCE SCHOOL CHANDAN NAGAR
EXECUTIVE DIRECTOR AIR FORCE SCHOOL CHANDAN NAGAR PUNE-411014
CONSTRUCTION OF SYNTHETIC BASKETBALL AND VOLLEYBALL COURTS AT AIR FORCE SCHOOL CHANDAN NAGAR
2022_IAF_554443_1
9BRD/EDN/01/2022-23
Open Tender
Construction Works
Works
120 days
AIR FORCE SCHOOL CHANDANNAGAR PUNE
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
₹80,000
Yes
10 Nov 2022
27 Sept 2022
12 Oct 2022
27 Sept 2022
11 Oct 2022
27 Sept 2022
27 Sept 2022 - 6 Oct 2022
BASKET BALL AND FOOTBALL
Asphalt Subbase for BASKETBALL * Chiseling of Existing Basketball cement base * Un-grounding Basketball poles Supply of Civil Material and Complete Insitu Execution of Asphalt subbase which covers by chiseling /excavation upto 6 inches (Surface Dressing), Levelling & Slope to be created as per sports Requirement , Slope to be given as per the standard, Weedicide Treatment of Entire Area to make Land infertile, this will be done by spraying diluted weedicide mixed with water, Layer of up to 4" compacted WMM using Mix aggregate size with 70:30 ratio and compaction of same in one layer, Cleaning of sub base before starting Asphalting Layers, Tack/Primer Coat to be applied before Bitumen Mix & Asphalt Concrete Layers (Qty Consumption will have Tack Coat of Up to 3kg Per 10 Sq.Meter), Compacting Layer of Bituminous Layer of upto 30 mm Thickness using mix of 20 and 12mm Stone with 80-100/60-70 Grade Bitumen. Bituminous binder percentage should be close to 3.5%, Compacting Layer of AC of up to 20 mm Thickness using 6mm Stone with 80-100/60-70 Grade Bitumen, Bituminous binder percentage would be close to 3.5%, Final Layer of Seal Coat using Stone Dust with Bitumen to make the surface appropriate for Synthetic Installation in the court.
Toe Wall Construction - BASKETBALL Providing and fixing Masonry edge wall / retaining wall 6" to 9” wide and 12”/15” height (including grounded underneath) around the perimeter of the BB Court and plastering to the toe work.
Saucer Drain BASKETBALL Open saucer drain to be placed on inner length side of the court. Providing brick masonry 9’" thick with cement mortar for strom water drain
BASKETBALL Outdoor Sports Acrylic Flooring with Terracotta Red / Blue / Green Combination Supply and installation of ITF certified 5 layers acrylic system with thickness up to 2mm. The flooring should be certified by International Tennis Federation (ITF) and should have application as first layer of primer (100% acrylic latex based emulsion to improve bond of acrylic court system to the asphalt surface having consumption ratio of 0.014kg/sqft), second layer of acrylic resurfacer (Filling and smoothing asphalt or concrete surfaces in preparation for Acryflex T tennis court system. And also fills the surface chips, voids and conceals repairs while providing a smooth surface for colour coating. It should have a consumption ratio of 0.046kg/sqft), third and fourth layer of Precoat (Quartz filled 100% acrylic latex based textured tennis coat with total consumption ratio of 0.078 kg/sqft) and Fifth layer of Topcoat (100% acrylic latex polymer & colour coat for the finished surface to protect from UV. It should have consumption ration of 0.023 kg/sft). On top of these 5 layers, the line marking should be done with Overline paint (100% acrylic latex based high hiding line paints. It should have consumption ratio of 4 kg/court). The acrylic resurfacer must have silica sand infill to be embedded into it with consumption ratio of 0.065 kg/sqft. The product must be approved/licensed/preferred by the respective International Sports Federation & used at the Indian/International Championships recognized by the respective Regional /International Sports Federation.
Asphalt Subbase for VOLLEY BALL *Supply of Civil Material and Complete Insitu Execution of Asphalt subbase which covers Excavation upto 6 inches ( Surface Dressing), Levelling & Slope to be created as per sports Requirement, *Un grounding of volleyball poles *Slope to be given as per standards, Weedicide Treatment of Entire Area to make Land infertile, this will be done by spraying diluted chemical mixed with water, Layer of up to 4" Compacted WMM using Mix aggregate size with 70:30 ratio and Compaction of same in One Layer, Cleaning of Sub base before starting Asphalting Layers, Tack/Primer Coat to be applied before Bitumen Mix & AC Layers ((Qty Consumption will have Tack Coat of Up to 3kg Per 10 Sq.Meter), Compacting Layer of Bituminous Layer of upto 30 mm Thickness using mix of 20 and 12 MM Stone with 80-100/60-70 Grade Bitumen (Subject to availability). Bituminous binder percentage would be close to 3.5%, Compacting Layer of AC of up to 20 mm Thickness using 6mm Stone with 80-100/60-70 Grade Bitumen( Subject to availability), Bituminous binder percentage would be close to 3.5%, Final Layer of Seal Coat using Stone Dust with Bitumen to make the surface appropriate for Synthetic Installation.
VOLLEYBALL Toe Wall Construction Providing and fixing Masonry edge wall / retaining wall 6" to 9” wide and 12”/15” height (including grounded underneath) around the perimeter of the BB Court and plastering to the toe work.
VOLLEYBALL Saucer Drain Open saucer drain to be placed on inner length side of the court. Providing brick masonry 9’" thick with cement mortar for strom water drain.
VOLLEYBALL Multisport Turf for Volleyball in Green Color Supply & Installation of FIH Global Certified Hockey Turf from FIH Preferred Manufacturer having pile height of 13mm both recommended for water or sand dressed hockey international tournaments and national level tournaments, should have following specifications; Composition PE, Structure Monofilament curl, Dtex PE8000, Tape thickness 130μm±15μm, Tape width 0.8-1.0mm, Pile height 13mm±1mm, Gauge 3/16 inch, Stitches per 10cm 34±1, Stitches per m2 71400 ±100, Total yarn weight 1860g/sqm ±10%, Primary backing "PP + polyester fiber short-staple +, Mesh scrim inlay", Secondary backing Latex, Total carpet weight 3100g/sqm ±10% Installation of Turf should be done using a seam tape & suitable PU adhesive. Adhesive TDS should match the following basic properties; Colour & Form: Grass-green paste, Characteristics: 2 component polyurethane-reaction adhesive, for outdoor use. Specific Gravity: 1480 g/litre., Viscosity: Thixotropic, Solids: 100%., Application: Notched trowel or by suitable machine for applying to Seaming Tape.
Ebaco India Private Limited
Rajvans business solutions
RAYZON GLOBAL LLP
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .