Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹6.9 L+₹65,882.94 (10.5%)Rejected-AOC | L2 | Rejected-AOC REJECTED | |
| 3 | L3₹6.9 L+₹66,071.74 (10.6%)Rejected-AOC | L3 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | Shankar c L3 | K.Moorthy L2 | Thirumalai L1 |
|---|---|---|---|---|---|---|
| 1.00Construction of Bushelter at Sambathurayanpettai in Sirunamalli Panchayat | ||||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 16.21 | cum | 262 ₹4,247 | 260 ₹4,215 | 246.12 ₹3,990 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., | 6.43 | cum | 5,696.35 ₹36,628 | 5,690 ₹36,587 | 5,411.23 ₹34,794 Lowest |
| 4.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. | 12.82 | cum | 6,194.8 ₹79,417 | 6,190 ₹79,356 | 6,111.34 ₹78,347 Lowest |
| 5.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 13.27 | cum | 9,425.96 ₹1,25,082 | 9,424 ₹1,25,056 | 9,125.56 ₹1,21,096 Lowest |
| 6.00Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | ||||||
| 7.00 | upto Basement | 28.97 | Sqm | 547 ₹15,847 Lowest | 547 ₹15,847 Lowest | 949.78 ₹27,515 |
| 8.00 | Roof Projection side | 67.48 | Sqm | 1,095 ₹73,891 | 1,095 ₹73,891 | 995.76 ₹67,194 Lowest |
| 9.00 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. | 0.63 | Mt | 91,880 ₹57,884 | 91,880 ₹57,884 | 812.12 ₹512 Lowest |
| 10.00 | Weathering course with brick jelly lime concrete including cost and convetance and labour charges etc complete. | 2.73 | Sqm | 4,164.49 ₹11,369 | 4,164.49 ₹11,369 | 1,247.89 ₹3,407 Lowest |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
27 Aug 2026, 1:00 pmClosed
Block Dvelopment Officer (BP)
Block Dvelopment Office Nemili
Construction of Bushelter at Sambathurayanpettai in Sirunamalli Panchayat
2026_RDTN_694490_1
A2/2343/2026
Open Tender
Civil Works
Item Rate
Bolock development Office
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹7,000
Yes
28 Sept 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Bushelter at Sambathurayanpettai in Sirunamalli Panchayat | - | - | - | - |
| 2 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | - | cum | 263.78 | - |
| 3 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., | 1 | cum | 5,696.35 | ₹5,690.65 |
| 4 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. | - | cum | 6,194.8 | - |
| 5 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 1 | cum | 9,425.96 | ₹9,416.53 |
| 6 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | - | - | - | - |
| 7 | upto Basement | 1 | Sqm | 547.5 | ₹546.95 |
| 8 | Roof Projection side | - | Sqm | 1,095 | - |
| 9 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. | 1 | Mt | 91,887.94 | ₹91,796.05 |
| 10 | Weathering course with brick jelly lime concrete including cost and convetance and labour charges etc complete. | - | Sqm | 4,164.49 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_834942.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .