Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | -33.05% | ₹1.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.2 L+₹7,875.43 (7.35%)Admitted-Fee/PreQual/Technical/Finance | -28.13% | ₹1.2 L+₹7,875.43 (7.35%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.4 L+₹28,086.51 (26.2%)Admitted-Fee/PreQual/Technical/Finance | -15.50% | ₹1.4 L+₹28,086.51 (26.2%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.5 L+₹44,010.20 (41.1%)Admitted-Fee/PreQual/Technical/Finance | -5.55% | ₹1.5 L+₹44,010.20 (41.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.6 L
EMD Value
₹4,800
Closing Date
7 Sept 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O 01 NO OF COMMUNITY COMPOST PIT AT KUCHIPORA PANZATH BBLOCK QAZIGUND
2026_RDPR_322847_38
ENIT102of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹4,800
9 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earthwork in excavation by manual means in trenches for foundations etc (not exceeding 1.5m in width) and not exceeding 10 sqm on plan,depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge,disposed earth to be levelled and neatly dressed. | - | Cum | - | - |
| 0.0 | Providing and laying of stone soling of tightly hand packed by tamping including carriage Lead of 15 KM by MT. | 1 | Cum | - | - |
| 0.0 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) and by using 20 mm down aggregates. | 1 | Cum | - | - |
| 0.0 | 6 mm cement plaster of mix 1 : 3 (1 cement : 3 fine sand) | 1 | Sqm | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for,Suspended floors, roofs, landings, balconies and access platforms. | - | Sqm | - | - |
| 0.0 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete,Welded | 0.4 | Kg | 1 | ₹0.4 |
| 0.0 | Providing corrugated coloured profile G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required, 0.50 mm thick with zinc coating not less | - | Sqm | - | - |
| 0.0 | Carriage of Stone Aggregates from source to w/site by M.T,av.lead of 15 kms | 1 | Cum | - | - |
| 0.0 | Sand at an avg. lead of 15 Km, | - | Cum | - | - |
| 0.0 | Provision for Signboard, Photographs. Unforseen items | - | L/S | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1085053.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .