Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance 2ND ROSHAN TOWER S B SHOP BISTUPUR AREA EAST SINGHBHUM JHARKHAND | BISTUPUR | EAST SINGHBHUM | JHARKHAND | 831001 | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹26.6 L (15.1%)Admitted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹2.0 Cr+₹26.6 L (15.1%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 Cr+₹54.5 L (30.9%)Admitted-Finance 2 ARYA NAGAR NARMADA ROAD JABALPUR 482001 | JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | ₹2.3 Cr+₹54.5 L (30.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Siemens Ltd. L1 | GE Power India Limited L2 | Bharat Heavy electricals limited L3 |
|---|---|---|---|---|---|---|
| 1.00MANDATORY WORKS | ||||||
| 1.01 | Inspection of TG Bearings, Overhauling of LP Module, Generator, Permanent Magnet Generator, Main exciter, Generator seal oil system as per scope of work | 1 | Job | - | - | - |
| 1.02 | Overhauling of MS & HRH Strainer | 1 | Job | - | - | - |
| 1.03 | Overhauling of TG Valves & Revisioning of All Hanger Support | 1 | Job | - | - | - |
| 1.04 | NFT-MPI of 7th and 8th stages | 1 | Job | - | - | - |
| 1.05 | CONDENSER TUBE CLEANING THROUGH BULLET SHOT METHOD ( Total No. of Tubes: 15664, Length: 11.10 Meter, Dimension of Tube: 28.57X0.7112 mm) | 1 | Job | - | - | - |
| 2.00OPTIONAL WORK | ||||||
| 2.01 | Replacement of Insulation underneath the Retaining Rings of Unit # 6 250 MW Generator Rotors at Parichha Site | 1 | Job | - | - | - |
Tender Value
₹2.5 Cr
EMD Value
₹1.5 L
Closing Date
14 Sept 2020, 1:00 pmClosed
SE-II, 2X250 MW, CTPS, Parichha
SE-II, 2X250 MW, CTPS, Parichha
TG BEARING INSPECTION, OVERHAULING LPT, TURBINE VALVES, MS-HRH STARINERS, NFT-MPI OF FREE STATNDING BLADES, PERMANENT MANGENT, GENERATOR EXCITATION SYSTEM ,SEAL OIL SYSTEM ANDGENERATOR INCLUDING NATURAL FREQUENCY TEST OF GENERATOR OF UNIT 6, 250 MW
2020_RVUNL_495544_1
19/OMC-II/TMD/2X250 MW/CTPS/PTPP/2020-21
Limited
Power/Energy Projects/Products
Lump-sum
30 days
Parichha CTPS
As per Tender Specification
2 documents required · 2 mandatory
₹1,180
Dy. CAO (CFA and BO)
₹1.5 L
26 Sept 2020
22 Jul 2020
17 Sept 2020
22 Jul 2020
14 Sept 2020
23 Jul 2020
23 Jul 2020 - 11 Sept 2020
Amount
MANDATORY WORKS
Inspection of TG Bearings, Overhauling of LP Module, Generator, Permanent Magnet Generator, Main exciter, Generator seal oil system as per scope of work
Overhauling of MS & HRH Strainer
Overhauling of TG Valves & Revisioning of All Hanger Support
NFT-MPI of 7th and 8th stages
CONDENSER TUBE CLEANING THROUGH BULLET SHOT METHOD ( Total No. of Tubes: 15664, Length: 11.10 Meter, Dimension of Tube: 28.57X0.7112 mm)
OPTIONAL WORK
Replacement of Insulation underneath the Retaining Rings of Unit # 6 250 MW Generator Rotors at Parichha Site
GE Power India Limited
Bharat Heavy electricals limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TENDERDOCUMENT.pdf
Tender Documents • 1.19 MB
BOQ_743545.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .