Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹9.1 L
EMD Value
₹18,100
Closing Date
2 Oct 2020, 6:00 pmClosed
DFO Marwah
Sarkoot Kishtwar
BOQ
2020_FD_105337_6
13 of 2020-21
Open Tender
Agricultural or Forestry
Item Wise
30 days
Comptt 27c Dachhan Dunag rari
NIT
3 documents required · 3 mandatory
₹600
DFO Marwah
₹18,100
3 Oct 2020
25 Sept 2020
3 Oct 2020
25 Sept 2020
2 Oct 2020
26 Sept 2020
Amount
Fencing using Wooden fence posts at spacing of 8' & 4 strands of black annealed Barbed wire The Fencing work includes cost of material, Carriage of fencing material both mechanical and head load , loading & unloading, clearance of site, digging of pits of size 1'x1'x1'6",, fixing of poles in dugout pits as per specification, stretching of B.A Barbed wire in four strands, Painting of fence posts with enamel paint as per approved design and its numbering, fixing of gate and sign board including painting and writing as per specification and design approved by the Divisional Forest Officer,Marwah, etc . Note: The Department through Marwah Forest Division shall provide the Wooden Fence Posts of required sizes at site of establishment of closure. The Black Annealed Barbed wire with standard specification conforming to product code BA-BW, allied materials like “U” nails etc. and its mechanical carriage including loading, unloading and stacking charges will be managed/procured himself by the contractor. A proper testing certificate with regard to the material i.e Barbed Wire etc. has to be produced by the contractor before the execution of work. The extraction and carriage charges of Wooden Fence Posts shall be deducted by the department from the bill of the contractor at the time of payment after satisfactory execution of work. A proper Measurement Book has to be prepared of the work against which work done payment is to be made to the contractor.
DRSM work: Includes the cost of collection, carriage of stone to the work site, fashioning and dressing of stones and preparation of beds at sites to be identified by the Forest supervisory staff.
M/S NISHAT AHMAD AND SONS
Javeed Iqbal Ahanger
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .