| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.8 LAdmitted-Finance 1 WARD NO 01 RAVIDAS MANDIR KHARKHODA SONIPAT HARYANA 131402 | SONIPAT | HARYANA | 131402 | L1 | Admitted-Finance | ||
| 2 | L2₹18.0 L+₹15,469.31 (0.87%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹18.2 L+₹42,169.75 (2.37%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹19.7 L+₹1.9 L (10.4%)Admitted-Finance BUILDING NO FLAT NO 702 ROAD STREET GOHANA LOCALITY SUB LOCALITY NEAR GOVT BOYS SCHOOLS CITY TOWN VILLAGE BUTANA KHETLAN DISTRICT SONIPAT STATE HARYANA | BUTANA KHETLAN | SONIPAT | HARYANA | L4 | Admitted-Finance | ||
| 5 | L5₹20.0 L+₹2.2 L (12.5%)Admitted-Finance SHOP NO 8 GANPATI MARKET OLD SABZI MANDI KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | L5 | Admitted-Finance |
Tender Value
₹21.2 L
EMD Value
₹42,380
Closing Date
21 Sept 2026, 5:00 pmClosed
Smt Priyanka Saini
Municipal Corporation Karnal
Construction of big size Yoga shed in Sector-6, Ward no. 8, M.C. Karnal (Under VANGY Scheme 2025-26)(Only for L/C Societies)
2026_HRY_547189_1
2026E2D698A6 737E 49CC BE12 BC560A0F02B7747ULB
Open Tender
Civil Works
Works
60 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹42,380
Yes
28 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 92.42 | cum | 1,863 | ₹1,72,178.46 |
| 2 | [10.37.1]Providing and fixing of Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 1. 25 mm thick [Through Rate] | 634.06 | Sqm | 790 | ₹5,00,907.4 |
| 3 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 62.8 | Sqm | 113 | ₹7,096.4 |
| 4 | [11.82.1]Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work [Through Rate] | 570 | Sqm | 49 | ₹27,930 |
| 5 | [13.30.1]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes [Through Rate] | 5,667.44 | Kg. | 105 | ₹5,95,081.2 |
| 6 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] | 67.51 | cum | 83 | ₹5,603.33 |
| 7 | [4.4.1]Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 1. All kinds of soil [Through Rate] | 634.06 | Sqm | 11 | ₹6,974.66 |
| 8 | [6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) [Through Rate] | 48.32 | cum | 2,911 | ₹1,40,659.52 |
| 9 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 9.63 | cum | 4,374 | ₹42,121.62 |
| 10 | [6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] | 1.5 | cum | 6,113 | ₹9,169.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_626836.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .