Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.2 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹33.7 Cr+₹1.4 Cr (4.50%)Accepted-AOC 802 IMPRESSA RISE 8 AMBAZARI ROAD OPP LAD COLLEGE SHIVAJI NAGAR NAGPUR 440010 | NAGPUR | MAHARASHTRA | 440010 | L2 | Accepted-AOC L2 | |
| 3 | L3₹33.8 Cr+₹1.6 Cr (4.89%)Rejected-Finance 404 405 GOMATI APT 4TH FLOOR LAW COLLEGE SQ WHC RD DHARAMPETH NAGPUR | NAGPUR | MAHARASHTRA | 440001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹34.3 Cr+₹2.1 Cr (6.42%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹35.2 Cr+₹3.0 Cr (9.28%)Rejected-Finance R 25 RESHIMBAGH UMRED ROAD NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | 440003 | L5 | Rejected-Finance L5 |
Tender Value
₹42.9 Cr
EMD Value
₹21.5 L
Closing Date
6 Aug 2024, 6:55 pmClosed
Executive Engineer, P. W. Dn No. 3, Civil lines, N
Executive Engineer, P. W. Dn No. 3, Civil lines, Nagpur
IMPROVEMENT TO SONEGAON TO UMRED SH 353 ROAD FROM KM. 8/000 TO 21/00 TA. UMRED DIST. NAGPUR C. C. ROAD
2024_PWR_1052518_1
NGP/DN.3/SBD/T.N. 05 /2024-25 S.N. 01
Open Tender
Civil Works
Item Rate
545 days
TA. UMRED DIST. NAGPUR
--
3 documents required · 3 mandatory
₹3,540
via Net Banking
₹21.5 L
Chief Engineer, P. W. Region, Civil lines, Nagpur
17 Sept 2024
13 Jul 2024
8 Aug 2024
13 Jul 2024
6 Aug 2024
13 Jul 2024
24 Jul 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1L | |||||
| 0.0 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately etc. complete. | - | One Cubic Metre | 100 | - |
| 2 | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m.and spreading for embankment or stacking as directed. | 17,222 | One Cubic Metre | 100 | ₹17,22,200 |
| 3 | Transportation of Unsuitable material inlcuding necessary excavation / loosing including loading, unloading and conveying and disposing as directed.beyond free lead 50 m and Upto 5.00 Km including royalty charges | 4,345 | One Cubic Metre | 100 | ₹4,34,500 |
| 4 | Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97 % of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with vibratory roller. | 25,854.04 | One Cubic Metre | 100 | ₹25,85,404 |
| 5 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) | 80,483.62 | One Cubic Metre | 100 | ₹80,48,362 |
| 6 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader / Paver on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- By Mix in Place Method and Grading - II Material | 16,613.7 | One Cubic Metre | 100 | ₹16,61,370 |
| 7 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-in-charge , compacting with vibratory roller, finishing, curing and including preparation of sub-grade surface if required etc. complete. with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. | 8,737.01 | One Cubic Metre | 100 | ₹8,73,701 |
| 8 | Providing and laying 125 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete. | 55,853 | One Square Metre | 100 | ₹55,85,300 |
| 9 | Providing and laying in-situ M40 Grade unreinforced plain cement concrete pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS 383, using fine and coarse aggregates combined gradation as per Table 600-3 of MORTH Specification 2013, mixed in a Tilting type Concrete Mixer as per approved mix design, admixtures, spreading, laying compacting and finished in a continuous operation without paver machine, finishing to lines and grades as directed by Engineer-in-charge and curing by curing compound /by providing cement vata in cement Mortar 1:8 @0.6m X 0.6m centre to centre, admeasuring 80 mm at bottom and 40 mm at top with depth of 75mm and maintaining the same throughout curing period by any other method approved by Engineer-in-charge. with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. | 15,638.84 | One Cubic Metre | 100 | ₹15,63,884 |
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1837746.xls
BOQ • 0.32 MB
148199448.pdf
Tender Documents • 0.03 MB
148199450.pdf
Tender Documents • 2.33 MB
148199456.html
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .