Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹37.7 L
Closing Date
31 Aug 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (WMS)
2 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. The balance sheet and all other financial documents attested/certified by CAs to substantiate fulfilment of Financial Eligibility Criteria should be with UDIN, failing which the offer is likely to be rejected without any further reference. This clause regarding Special Financial Criteria may be dispensed with in case of bidders, who are either OEMs or sources approved by RDSO for related works contract as per Railway Board's letter No.2011/M (M &P) /7/2/ Guidelines dated 23.08.2012. In such case, the bidder shall submit the necessary certificate/document as OEM or sources approved by RDSO for related works contract along with their bid, against the document asked at this para.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. The above clause regarding Special Technical Criteria may be dispensed with in case of bidders, who are either OEMs or sources approved by RDSO for related works contract as per Railway Board's letter No.2011/M (M &P) /7/2/ Guidelines dated 23.08.2012. In such case, the bidder shall submit the necessary certificate/document as OEM or sources approved by RDSO for related works contract along with their bid, against the document asked at this para.
61 conditions · 17 needing a document upload
The following documents should be submitted by the tenderers along with the tender
The Tender form first second sheet uploaded in document section of tender as Annexure- ITenderformfirstsecondsheet.pdf is to be mandatorily filled, stamped, signed and uploaded along with the offer.
List of Personnel, Organization available on hand and proposed to be engaged for the subject work. (Annexure-X has been uploaded in the document section as Annexures-X.pdf. Annexure X is to be submitted by the tenderer along with the tender.)
List of Plant & Machinery available on hand (own) and proposed to be inducted (own and hired to be given separately) for the subject work. (Annexure-II has been uploaded in the document section as Annexure-II.pdf. Annexure II is to be submitted by the tenderer along with the tender.)
List of works on hand indicating description of work, contract value, approximate value of balance work yet to be done and date of award. (Annexure-IV has been uploaded in the document section as Annexure-IV.pdf. Annexure IV is to be submitted by the tenderer along with the tender.)
Declaration regarding association of the tenderer with serving/retired Gazette Railway Officer(s). (Annexure-V has been uploaded in the document section as Annexure-V.pdf. Annexure V is to be submitted by the tenderer along with the tender.)
ANNEXURE-V(A) (Reference -Para 6.1 of ITT ) (This certificate is to be given by attorney/authorized signatory/each member of Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc.) l. Standard format of certificate to be submitted by the bidder is enclosed as Annexure-V (A) (Annexure-V(A) has been uploaded in the document section as Annexure-V(A).pdf. Annexure V(A) is to be submitted by the tenderer along with the tender.) (If applicable).
Details of the tenderer (Annexure-VI has been uploaded in the document section as Annexure- VI.pdf. Annexure VI is to be submitted by the tenderer along with the tender.)
Documentary evidence in support of Special Financial Criteria. Annexure -VIB (Reference -Para 10.2 & 17.15.2 of Tender Form (Second Sheet) of Annexure I of ITT.). Standard format of certificate to be submitted by the bidder is enclosed as Annexure -VIB. (Annexure -VIB has been uploaded in the document section as Annexure -VIB.pdf. (If applicable)
Mandate form for EFT/NEFT (Annexure-VII has been uploaded in the document section as Annexure- VII.pdf. Annexure VII is to be submitted by the tenderer along with the tender.)
Acceptance/Deviation Schedule (Annexure-VIII has been uploaded in the document section as Annexure-VIII.pdf. Annexure VIII is to be submitted by the tenderer along with the tender.)
Form of Declaration to be given by the tenderer for tender negotiations as per Annexure - IX. (Annexure-IX has been uploaded in the document section as Annexure-IX.pdf. Annexure IX is to be submitted by the tenderer along with the tender.)
Condition based item Rate list and Formats as uploaded in the document section as . The OEM should mandatorily upload the Condition based item Rate list duly filled, stamped and signed as per format uploaded in Document Section of Tender as Annexure-DConditionbaseditemRatelist.pdf
Documentary evidence in support of Special Technical Criteria. (If applicable)
Any other document if, firm seems necessary for fulfillments the requirements of this advertised tender.
List of Works completed in the last seven financial years giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work. Date of actual start, actual completion and final value of contract should also be given. (Annexure- III to be submitted by the tenderer along with the tender)
The Contractor shall be responsible for deposition of applicable GST to the concerned authority.
For all the tenders having advertised cost of Rs 10 lakh or above,thecontractorshall havethe optionto take paymentfromRailwaysthroughaletter ofcredit(LC)arrangement as perRB'sletterNo.2018/CEI/CT/9,dated:04.06.2018copy ofwhichisenclosedinDocumentSection.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Annual Maintenance contract (AMC) of Axle mounted disc brake system (AMDBS) for LHB Coaches including FIBA with the OEM M/s SONA BLW PRECISION FORGINGS LIMITED (Earlier known as M/s. Escorts Kubota Limited)
KGPW-CARR-AMBDSCAMC2628-1~SER
KGPW-CARR-AMBDSCAMC2628-1
Single
Works - General
24 Months
Paschim Medinipur, West Bengal
₹0
₹37.7 L
5 Aug 2026
5 Aug 2026
17 Aug 2026
34 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 18,82,65,738.1 | ||
| — | 136.00 | — | — | ||
| Coach | Per | — | — | ||
| Cost for "Must Change Materials Charges for EOG - SS-II (M-36: 3rd year schedule)" including GST @ 18%. | — | — | — | 4,11,64,403.84 | |
| — | 136.00 | — | — | ||
| Coach | Per | — | — | ||
| Cost of "Labour Charges for EOG -SS-II (M-36: 3rd year schedule)" including GST @ 18%. | — | — | — | 2,38,96,434.88 | |
| — | 20.00 | — | — | ||
| Coach | Per | — | — | ||
| Cost of "Must Change Materials Charges for Power Car -SS-II ( M-36 : 3rd year schedule)" including GST @ 18%. | — | — | — | 60,92,410.8 | |
| — | 20.00 | — | — | ||
| Coach | Per | — | — | ||
| Cost of "Labour Charges for Power Car -SS-II ( M-36 : 3rd year schedule)" including GST @ 18%. | — | — | — | 35,14,181.6 | |
| — | 65.00 | — | — | ||
| Coach | Per | — | — | ||
| Cost of "Must Change Materials Charges for EOG - SS-III (M-72: 6th year schedule)" including GST @ 18%. [Payments terms and condition for Scheduled SS-III EOG/Power Car: Under Must Change Materials Charges for EOG/Power Car - SS-III (M-72: 6th Year Schedule) and Labour Charges for EOG/Power Car - SS-III (M-72: 6th Year Schedule), it is assumed that 8 sets of Brake Caliper Units constitute one complete Coach Set. Accordingly, the billing shall be made either in terms of Coach Sets or Brake Caliper Units, as deemed fit and appropriate at the time of execution.] | — | — | — | 3,67,09,770.5 | |
| — | 65.00 | — | — | ||
| Coach | Per | — | — | ||
| Cost of "Labour Charges for EOG - SS-III (M-72: 6th year schedule)" including GST @ 18%. [Payments terms and condition for Scheduled SS-III EOG/Power Car: Under Must Change Materials Charges for EOG/Power Car - SS-III (M-72: 6th Year Schedule) and Labour Charges for EOG/Power Car - SS-III (M-72: 6th Year Schedule), it is assumed that 8 sets of Brake Caliper Units constitute one complete Coach Set. Accordingly, the billing shall be made either in terms of Coach Sets or Brake Caliper Units, as deemed fit and appropriate at the time of execution.] | — | — | — | 1,14,21,090.2 | |
| — | 9.00 | — | — | ||
| Coach | Per | — | — | ||
| Cost of "Must Change Materials Charges for Power Car - SS-III (M-72: 6th year schedule)" including GST @ 18%. [Payments terms and condition for Scheduled SS-III EOG/Power Car: Under Must Change Materials Charges for EOG/Power Car - SS-III (M-72: 6th Year Schedule) and Labour Charges for EOG/Power Car - SS-III (M-72: 6th Year Schedule), it is assumed that 8 sets of Brake Caliper Units constitute one complete Coach Set. Accordingly, the billing shall be made either in terms of Coach Sets or Brake Caliper Units, as deemed fit and appropriate at the time of execution.] | — | — | — | 51,32,469.15 | |
| — | 9.00 | — | — | ||
| Coach | Per | — | — | ||
| Cost of "Labour Charges for Power Car - SS-III (M-72: 6th year schedule)" including GST @ 18%. [Payments terms and condition for Scheduled SS-III EOG/Power Car: Under Must Change Materials Charges for EOG/Power Car - SS-III (M-72: 6th Year Schedule) and Labour Charges for EOG/Power Car - SS-III (M-72: 6th Year Schedule), it is assumed that 8 sets of Brake Caliper Units constitute one complete Coach Set. Accordingly, the billing shall be made either in terms of Coach Sets or Brake Caliper Units, as deemed fit and appropriate at the time of execution.] | — | — | — | 15,92,004.87 | |
| — | 360.00 | — | — | ||
| Coach | Per | — | — | ||
| Cost of "Material cost for replacement of must change items for FIBA during SS-II & SS-III" including GST @ 18%. | — | — | — | 2,39,37,800.4 | |
| — | 360.00 | — | — | ||
| Coach | Per | — | — | ||
| Cost of "Labour cost for replacement of must change items for FIBA during SS-II & SS III" including GST @ 18%. | — | — | — | 88,35,465.6 | |
| — | 1.00 | — | — | ||
| Coach | Per | — | — | ||
| Cost of "Conditional Based items" including GST @ 18%. | — | — | — | 2,59,69,706.26 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ScheduleofWork_1.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14_07_2022.pdf
ATTACHMENT
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
ATTACHMENT
slips 3 GCC
ATTACHMENT
slips 4 GCC
ATTACHMENT
slips 5 GCC
ATTACHMENT
2023_12_21IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_6ACS-61.pdf
ATTACHMENT
2024_09_25IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_7ACS-7.pdf
ATTACHMENT
2024_12_20IndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
2025_01_09IIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
slips 10 GCC
ATTACHMENT
IRStandardGCCApril2022.pdf
ATTACHMENT
RBorderregardingletterofcredit.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-311.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf
ATTACHMENT
2025_03_04RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
15_Model_Tender_Document_AMDBS__Final_1.pdf
ATTACHMENT
FirstCorrectionSlipModelTenderDocumentAMDBS.pdf
ATTACHMENT
SecondCorrectionSlipforReportonModelTenderDocumentFTRTIL.pdf
ATTACHMENT
RDSOLetter1.pdf
ATTACHMENT
RDSOLETTERFORCOLORCODING.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_112026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022_compressed.pdf
ATTACHMENT
Annexure-ITenderformfirstsecondsheet.pdf
ATTACHMENT
Annexures-II.pdf
ATTACHMENT
Annexures-III.pdf
ATTACHMENT
Annexures-IV.pdf
ATTACHMENT
Annexures-V.pdf
ATTACHMENT
Annexures-VI.pdf
ATTACHMENT
Annexures-VII.pdf
ATTACHMENT
Annexures-VIII.pdf
ATTACHMENT
Annexures-IX.pdf
ATTACHMENT
Annexures-X.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
Annexure-DConditionbaseditemRatelist.pdf
ATTACHMENT
ListofMustChangeItemsSONABLW-EscortMake.pdf
ATTACHMENT
RBletterdt11-05-26.pdf
ATTACHMENT
SpecialconditionofContract_2.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].