Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.8 LAccepted-AOC 0 3 SHASTRI STREET FEROZEPUR CITY PB PIN 152002 | FEROZEPUR CITY | FEROZEPUR | PUNJAB | 152002 | ₹25.8 L Quoted ₹35.7 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹42.6 LRejected-Finance | ₹42.6 L | L2 | Rejected-Finance HIGHER BIDDER |
| 3 | L3₹42.9 LRejected-Finance | ₹42.9 L | L3 | Rejected-Finance HIGHER BIDDER |
| 4 | L4₹43.6 LRejected-Finance H NO 37 VIKAS VIHAR PHASE II FEROZEPUR CITY PB 152002 | FEROZEPUR CITY | FEROZEPUR | PUNJAB | 152002 | ₹43.6 L | L4 | Rejected-Finance HIGHER BIDDER |
| 5 | L5₹43.9 LRejected-Finance | ₹43.9 L | L5 | Rejected-Finance HIGHER BIDDER |
| Sl No | Description | Qty | Unit | M/S Pee Kay Builders L2 | Karan Engineers L4 | RAKESH KUMAR SATISH KUMAR L6 | Marwaha Builders L1 | M/s Sham and Company L7 | Tarsem Chand Singla Electrical Contractor L5 | HAPPY ELECTRICALS L8 | M/s Shri Krishna Enterprises L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down unserviceable defective distribution transformer/power transformer of capacity 400 KVA and above upto 500 KVA (out door/Indoor type) from the existing site located in cantonment area after disconnecting the in/out connection, lifting with the help of suitable cranes etc, and transporting the transformers to workshop/factory with suitable vehicles for repairs,testing and transporting the same back after repairs and installing, hoisting of transformers on two/four pole structure/plinth at height not less than 3 metre, making all electric connections with HT/LT side jumpers and leads including earth connections etc and testing, complete all as specified and directed. | 2 | Each Job | 7,000 ₹14,000 | 6,350 ₹12,700 | 6,985 ₹13,970 | 5,700 ₹11,400 | 7,137 ₹14,274 | 7,000 ₹14,000 | 7,505 ₹15,010 | 6,500 ₹13,000 |
| 2.00 | All as per item No 01 here-in-before but 150 KVA to 315 KVA. | 6 | Each Job | 5,200 ₹31,200 | 4,800 ₹28,800 | 4,915 ₹29,490 | 4,100 ₹24,600 | 5,022 ₹30,132 | 5,000 ₹30,000 | 5,081 ₹30,486 | 5,000 ₹30,000 |
| 3.00 | All as per item No 01 here-in-before but 75 KVA to 125 KVA.
Notes : for items 1 to 3 above :-
(a) Oil container for collecting old transformer oil will be arranged by the contractor. (b) T&P such as chain pulley ,crane for loading, unloading ,trasporting and for installing and hoisting shall also be arranged by the contractor. | 2 | Each Job | 4,500 ₹9,000 | 4,800 ₹9,600 | 4,690 ₹9,380 | 3,000 ₹6,000 | 4,792 ₹9,584 | 5,000 ₹10,000 | 4,704 ₹9,408 | 4,500 ₹9,000 |
| 4.00 | M & L for opening the top of defective transformer of any make and capacity 400 KVA to 500 KVA removing gasket and lifting up the core assembly carefully to check the condition of transformer for repairs, dismantling core lamination to the extent required for taking out defective/ unserviceable coil for check after disconnecting all connections and re-assembling of core lamination to original position after positioning of existing serviceable coil alongwith new coils carefully to check the condition of transformer to ascertain the repairs/replacement of items for repair including cleaning the tank, removing sludge, dirt cleaning the coils of limbs, re-fixing the core assembly and reassembling of transformer after repairs including zinc chromate paint inside , rewriting MES number & SM number with white paint, replacement of nuts bolts with washers, thimbles etc and connections with aluminium strip and including welding, denting etc and testing the transformer at factory/workshop . | 2 | Each Job | 14,500 ₹29,000 | 15,000 ₹30,000 | 14,500 ₹29,000 | 13,000 ₹26,000 | 14,815 ₹29,630 | 14,000 ₹28,000 | 15,285 ₹30,570 | 14,000 ₹28,000 |
| 5.00 | All as per item No 04 here-in-before but 150 KVA to 315 KVA. | 6 | Each Job | 10,000 ₹60,000 | 11,000 ₹66,000 | 10,600 ₹63,600 | 9,000 ₹54,000 | 10,830 ₹64,980 | 10,000 ₹60,000 | 10,524 ₹63,144 | 10,500 ₹63,000 |
| 6.00 | All as per item No 04 here-in-before but 75 KVA to 125 KVA.
Notes : for items 4 to 6 above :-
(a) The payments of new coils and other parts to be replaced shall be made as supply only under items here-in-before, cost of fixing these items is included in item No 4 to 6.
(b) Cost of dehydration of transformer oil is not included under these items. | 2 | Each Job | 9,000 ₹18,000 | 10,000 ₹20,000 | 10,500 ₹21,000 | 7,000 ₹14,000 | 10,728 ₹21,456 | 10,250 ₹20,500 | 11,604 ₹23,208 | 9,500 ₹19,000 |
| 7.00 | Supply only HT/ LT coil DPC aluminium wire /strip of existing size(gauge),grade and in weight complete with insulating material for transformers of capacity 75 KVA to 500 KVA complete all as directed and as specified.
NOTE : Fixing charges of formed coil included in unit rate under Item 04 to 06 above. | 360 | Kg | 680 ₹2.4 L | 680 ₹2.4 L | 685 ₹2.5 L | 442 ₹1.6 L | 700 ₹2.5 L | 660 ₹2.4 L | 728 ₹2.6 L | 700 ₹2.5 L |
| 8.00 | Supply only HT/LT coil DPC copper winding strip of existing size (gauge), grade and in weight complete with insulating material for transformers of capacity 75 KVA to 500 KVA, complete all as directed and as specified.
NOTE : Fixing charges of formed coil included in unit rate under Item 04 to 06 above | 2,000 | Kg | 1,600 ₹32 L | 1,650 ₹33 L | 1,690 ₹33.8 L | 1,332 ₹26.6 L | 1,700 ₹34 L | 1,675 ₹33.5 L | 1,692 ₹33.8 L | 1,625 ₹32.5 L |
| 9.00 | Supply & fix in replacement HT brass spindles including, heat resistance gasket, nuts, bolts, washers for transformers of capacity 75 KVA to 125 KVA as per existing type, dia and length complete all as directed and as specified. | 4 | Each Set | 900 ₹3,600 | 900 ₹3,600 | 910 ₹3,640 | 750 ₹3,000 | 930 ₹3,720 | 900 ₹3,600 | 978 ₹3,912 | 850 ₹3,400 |
| 10.00 | All as per item No 9 here-in-before but for transformers of capacity 150 KVA to 315 KVA . | 4 | Each Set | 1,200 ₹4,800 | 1,150 ₹4,600 | 1,080 ₹4,320 | 1,000 ₹4,000 | 1,103 ₹4,412 | 1,100 ₹4,400 | 1,117 ₹4,468 | 1,100 ₹4,400 |
Tender Value
Refer Docs
EMD Value
₹54,000
Closing Date
30 Mar 2026, 6:00 pmClosed
CWE FEROZEPUR CANTT
HQ CWE FEROZEPUR CANTT PIN 152001
REPAIR/MAINT OF EXTERNAL ELECTRIFICATION SERVICES UNDER GE (EAST) FEROZEPUR CANTT
2025_MES_746034_3
CWE/FZR-63/2025-26
Open Tender
Civil Works
180 days
FEROZEPUR CANTT
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (EAST) FEROZEPUR CANTT
₹54,000
Yes
27 Apr 2026
17 Mar 2026
6 Apr 2026
17 Mar 2026
30 Mar 2026
24 Mar 2026
Taking down unserviceable defective distribution transformer/power transformer of capacity 400 KVA and above upto 500 KVA (out door/Indoor type) from the existing site located in cantonment area after disconnecting the in/out connection, lifting with the help of suitable cranes etc, and transporting the transformers to workshop/factory with suitable vehicles for repairs,testing and transporting the same back after repairs and installing, hoisting of transformers on two/four pole structure/plinth at height not less than 3 metre, making all electric connections with HT/LT side jumpers and leads including earth connections etc and testing, complete all as specified and directed.
All as per item No 01 here-in-before but 150 KVA to 315 KVA.
All as per item No 01 here-in-before but 75 KVA to 125 KVA. Notes : for items 1 to 3 above :- (a) Oil container for collecting old transformer oil will be arranged by the contractor. (b) T&P such as chain pulley ,crane for loading, unloading ,trasporting and for installing and hoisting shall also be arranged by the contractor.
M & L for opening the top of defective transformer of any make and capacity 400 KVA to 500 KVA removing gasket and lifting up the core assembly carefully to check the condition of transformer for repairs, dismantling core lamination to the extent required for taking out defective/ unserviceable coil for check after disconnecting all connections and re-assembling of core lamination to original position after positioning of existing serviceable coil alongwith new coils carefully to check the condition of transformer to ascertain the repairs/replacement of items for repair including cleaning the tank, removing sludge, dirt cleaning the coils of limbs, re-fixing the core assembly and reassembling of transformer after repairs including zinc chromate paint inside , rewriting MES number & SM number with white paint, replacement of nuts bolts with washers, thimbles etc and connections with aluminium strip and including welding, denting etc and testing the transformer at factory/workshop .
All as per item No 04 here-in-before but 150 KVA to 315 KVA.
All as per item No 04 here-in-before but 75 KVA to 125 KVA. Notes : for items 4 to 6 above :- (a) The payments of new coils and other parts to be replaced shall be made as supply only under items here-in-before, cost of fixing these items is included in item No 4 to 6. (b) Cost of dehydration of transformer oil is not included under these items.
Supply only HT/ LT coil DPC aluminium wire /strip of existing size(gauge),grade and in weight complete with insulating material for transformers of capacity 75 KVA to 500 KVA complete all as directed and as specified. NOTE : Fixing charges of formed coil included in unit rate under Item 04 to 06 above.
Supply only HT/LT coil DPC copper winding strip of existing size (gauge), grade and in weight complete with insulating material for transformers of capacity 75 KVA to 500 KVA, complete all as directed and as specified. NOTE : Fixing charges of formed coil included in unit rate under Item 04 to 06 above
Supply & fix in replacement HT brass spindles including, heat resistance gasket, nuts, bolts, washers for transformers of capacity 75 KVA to 125 KVA as per existing type, dia and length complete all as directed and as specified.
All as per item No 9 here-in-before but for transformers of capacity 150 KVA to 315 KVA .
All as per item No 9 here-in-before but for transformers of capacity 400 KVA to 500 KVA.
Supply & fix in replacement HT porcelain bushing for transformers of capacity 75 KVA to 500KVA complete all as directed and as specified.
Supply & fix in replacement LT brass spindle including heat resistance gasket, nuts, bolts, washers for transformers of capacity 75 KVA to 125KVA complete all as directed and as specified.
All as per item No 13 here-in-before but for transformers of capacity 150 KVA to 315 KVA .
All as per item No 13 here-in-before but for transformers of capacity 400 KVA to 500 KVA.
Supply & fix in replacement LT porcelain bushing for transformers of capacity 75 KVA to 500KVA complete all as directed and as specified.
Supply & fix silica gel breathers assembly filled with silica gel complete for transformers of capacity 75 KVA to 500 KVA complete all as directed and as specified.
Top up with fresh new transformer oil in transformers in-situ and for newly rewinded transformer after filtration/dehydration with minimum dielectric strength of 60 KV complete all as directed and as specified.
Dehydration/filtration of transformers oil of existing transformers (out door/Indoor, step up/step down), at site by means of oil dehydration machine having arrangement for heating to remove the moisture silt/sludge and wastage removing arrangement etc to make the oil fit for use in accordance with IS-1886 to achieve minimum dielectric strength of 60 KV by continuous process of dehydration complete including testing all as directed and as specified. (Testing machine shall be arranged by the contactor) Note -(a) Electricity for running dehydration machine & testing, shall be provided by the department free of cost.(a) Any damage caused to transformer during dehydration/filtration shall be responsibility of the contactor.
Cleaning sprinkled transformer oil, grease and all other foreign materials from external surfaces of transformers of capacity 75 KVA to 200 KVA and preparing the surface to receive paint and applying one coat of synthetic enamel paint (spray painting) including writing MES number and SM number with white paint over black base in letters not less than 10 cms in height complete all as specified and as directed.NOTE :- Painting shall be carried out at site.
All as per item No 20 here in before but transformers of 250 KVA to 500 KVA capacity.
Supply only off load tap changing assembly with 7.5 tapping at the rate +/- 2.5 percent stepping including making connections and testing complete for transformers of capacity 75 KVA to 315 KVA complete all as directed and as specified.
All as per item No 22 here-in-before but for transformers of capacity 400 KVA to 500 KVA.
Supply only CRGO silicon core as per existing thickness, size & design for transformer 75 KVA to 500 KVA complete all as specified.
Opening the top of existing transformer at site of any make and capacity (at site) 75 KVA to 160 KVA, drainage of oil, stopage of leakage ,change of gasket, oil rings, nuts, bolts & washers ,carefully re-fixing/refilling oil including replacement of gasket, oil rings, nuts bolts and washer complete all as directed and as specified.
All as per item No 25 hereinbefore but transformers of 200 KVA to 315 KVA capacity.
All as per item No 25 hereinbefore but transformers of 400 KVA to 500 KVA capacity.
Supply and spreading 40 mm graded stone aggrgate in substation yard complete all as specified.
Material & labour for aluminium strip 25mm x 3.15 mm with saddle and fixing screw with Busbar insulators etc roof conductors and down conductors above ground level, complete all as specified.
M&L for mild steel bars 10mm dia (Fe-410-W (Gde.E-250) quality-A or Fe 290 (Gde - E-165) and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips all as directed.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Retender63.pdf
Tender Documents • 1.33 MB
BOQ_847472.xls
BOQ • 1.03 MB
Download all tender documents and submit your bid