Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAccepted-AOC AT ALIPUR ASKA | ASKA | GANJAM | ODISHA | 761110 | ₹16.4 L | L1 | Accepted-AOC accepted |
| 2 | L2₹17.2 LRejected-Finance AT NUAGAM ASKA | ASKA | GANJAM | ODISHA | 761110 | ₹17.2 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹18.5 LRejected-Finance KALASANDHA PUR ASKA | ASKA | GANJAM | ODISHA | ₹18.5 L | L3 | Rejected-Finance Rejected |
Tender Value
₹16.6 L
EMD Value
₹16,619
Closing Date
19 Jan 2026, 5:00 pmClosed
Executive Officer, NAC, Aska
Executive Officer, NAC, Aska
CONTRUCTION OF NIGHT SHELTER OVER THE ROOF OF AAHAR KENDRA AT BUS STAND
2026_ORULB_124187_15
ASKANAC/MSBY-08/2025-26
Open Tender
Civil Works - Buildings
60 days
NAC, ASKA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹16,619
Yes
28 Apr 2026
6 Jan 2026
20 Jan 2026
6 Jan 2026
19 Jan 2026
6 Jan 2026
Cement concrete of proportion (1:2:4) in F&F using 12mm size cb/hb chips of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect.
Straightening, cutting, bending, binding tor steel rods, cranking, hooking, tying the grills & placing in proper position for R.C.C work, including cost of binding wires of 18 to 20 gauge, cost, conveyance, taxes of steel and all other materials, cost of all labour with T&P required for the work etc. complete.
R.C.C work of proportion M-20 in Slab etc. using 12 mm size hg chips of approved quality including rigid & smooth centering & shuttering, cost, conveyance, taxes, royalties of all materials, watering & curing for 28 days & cost of all labour with T&P etc. complete.
R.C.C work of proportion M-20 in Plinth Bend & Column base etc. using 12 mm size hg chips of approved quality including rigid & smooth centering & shuttering, cost, conveyance, taxes, royalties of all materials, watering & curing for 28 days & cost of all labour with T&P etc. complete.
Brick work with K.B Bricks of 23cm.x 11cm.x 8cm. size having crushing strength not less than 75 Kg/Cm2. in cement mortar (1:4) in superstructure including splays, cuttings, circular moldings, watering & curing for 7 days, cost, conveyance, taxes & royalties of all materials, labour with T&P etc. complete in all respect.
12 mm thick cement plaster (1:4) finished smooth to brick masonry with cement punning and two coats of bitumen painting including watering, curing including cost, conveyance, taxes, royalties & labour with T&P etc. complete.
Painting two coats with any approved plastic emulsion paint to interior wall surface including cost of all materials and labour with T&P etc complete in all respect.
Supply, fitting, fixing of MS Door & Grill Including all
Fixing of tiles in dadoos skirting & riser of steps on 12mm thick cement plaster 1:3 joined with neat cement slurry mixed with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance, taxes & royalties of all materials, labour with T&P complete in all respect.
Fixing of tiles in floors, Trades of steps & Landing over 25mm thick bed of cement mortar 1:1 jointed with cement slurry mixed with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance, taxes & royalties of all materials, labour with T&P complete in all respect.
Supply fitting fixing of MS spiral stair case including cost of all.
Sign Board
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
08MSBYDTCN.pdf
Tender Documents • 3.14 MB
BOQ_574493.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid