Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1Accepted-AOC 52 SHANTI NAGAR MODEL TOWN PANIPAT OPPOSITE AMAR STEEL SHUTTERING WORKS 132103 | PANIPAT | PANIPAT | HARYANA | 132103 | ₹1 | 1 | Accepted-AOC ok |
| 2 | 2₹2+₹1 (100.0%)Rejected-AOC 1 VILLAGE JYOTISAR DISTT KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | ₹2+₹1 (100.0%) | 2 | Rejected-AOC ok |
| 3 | 3₹3+₹2 (200.0%)Rejected-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹3+₹2 (200.0%) | 3 | Rejected-AOC ok |
| 4 | 4₹4+₹3 (300.0%)Rejected-AOC 1804 SECTOR 2 HUDA 124001 | ROHTAK | HARYANA | 124001 | ₹4+₹3 (300.0%) | 4 | Rejected-AOC ok |
| Sl No | Description | Qty | Unit | Jai Shree Balaji Constn Co. L1 | Rajesh Kumar L2 | Narender Singh Contractor L4 | Rajesh Kadiyan Contractor L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Making ‘T’ connection from existing charged pipe line to Boosting station bailing out water, cutting, jointing, testing complete job. | 39 | Nos. | 4,000 ₹1,56,000 | 12,000 ₹4,68,000 | 12,000 ₹4,68,000 | 2,000 ₹78,000 Lowest |
| 2.00 | Providing and fixing in position UPVC SWR Bend (110 mm x 110 mm) as per SI Manufacture of reputed firm complete in all respect. | 3,478 | Each | 350 ₹12,17,300 | 160 ₹5,56,480 Lowest | 275 ₹9,56,450 | 160 ₹5,56,480 Lowest |
| 3.00 | Providing and fixing in position UPVC SWR Reducer
(110 mm x 90 mm) as per SI Manufacture of reputed
firm complete in al respect. | 1,739 | Each | 250 ₹4,34,750 | 110 ₹1,91,290 Lowest | 125 ₹2,17,375 | 150 ₹2,60,850 |
| 4.00 | Providing and fixing in position UPVC SWR Door Foot
Bend (110 mm x 110 mm) as per S 13592 of E.D.C
Manufacture of any other reputed firm complete in all
respect | 3,478 | Each | 425 ₹14,78,150 | 260 ₹9,04,280 | 175 ₹6,08,650 | 150 ₹5,21,700 Lowest |
| 5.00 | Providing and inserting of trenchless of 600mm RCC
NP3 pipe including boring/excavation, providing and
inserting of 1100mm MS pipe 12mm thick, MS Spacer
at 2m distance, 600mm RCC NP3 pipe, excavation for
receiving pit as per direction of Engineer-in-charge. | 50 | Per Mtr. | 52,000 ₹26,00,000 Lowest | 63,000 ₹31,50,000 | 1,00,000 ₹50,00,000 | 1,10,000 ₹55,00,000 |
| 6.00 | Provision for connection of proposed sewer to existing
sewer by dismantling of existing manhole wall or slab
including reconstruction of it complete in all respect. | 7 | Job | 3,80,000 ₹26,60,000 | 3,500 ₹24,500 Lowest | 3,650 ₹25,550 | 20,000 ₹1,40,000 |
| 7.00 | Provision for shifting of existing utility for laying of
Sewer lineand like as water pipe, electricity pole etc. | 2 | Job | 6,80,000 ₹13,60,000 | 7,80,000 ₹15,60,000 | 8,00,000 ₹16,00,000 | 20,000 ₹40,000 Lowest |
| 8.00 | Dismantling of Saptic Tank coming under the alignment
of Laying of Sewer and providing, laying and fixing of
HDPE pipe line crossing Saptic tank complete in all
respect. | 20 | Job | 5,500 ₹1,10,000 | 1,000 ₹20,000 Lowest | 1,200 ₹24,000 | 5,000 ₹1,00,000 |
Tender Value
₹9.5 Cr
EMD Value
₹19.0 L
Closing Date
9 Apr 2026, 5:00 pmClosed
NITIN MODI
Gurgaon PHED
Laying of sewerage Line in both villages (Sakatpur and Hasanpur) and construction of IPS in village Hasanpur. AUGMENTATION OF W/S SCHEME SAKATPUR and HASANPUR BY INSTALLATION OF TUBE WELLS and LAYING THE DI PIPE LINES.
2026_HRY_510705_1
2026FE8CB4A0 E6CE 463B BECA EDA0AD07E349557PUH
Open Tender
Civil Works
Works
365 days
Hassanpur Sakatpur Hassanpur Sakatpur
2 documents required · 2 mandatory
₹20,000
₹19.0 L
Yes
15 Jun 2026
24 Mar 2026
10 Apr 2026
24 Mar 2026
9 Apr 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Making ‘T’ connection from existing charged pipe line to Boosting station bailing out water, cutting, jointing, testing complete job. | |||||
| 2Providing and fixing in position UPVC SWR Bend (110 mm x 110 mm) as per SI Manufacture of reputed firm complete in all respect. | |||||
| 3Providing and fixing in position UPVC SWR Reducer (110 mm x 90 mm) as per SI Manufacture of reputed firm complete in al respect. | |||||
| 4Providing and fixing in position UPVC SWR Door Foot Bend (110 mm x 110 mm) as per S 13592 of E.D.C Manufacture of any other reputed firm complete in all respect | |||||
| 5Providing and inserting of trenchless of 600mm RCC NP3 pipe including boring/excavation, providing and inserting of 1100mm MS pipe 12mm thick, MS Spacer at 2m distance, 600mm RCC NP3 pipe, excavation for receiving pit as per direction of Engineer-in-charge. | |||||
| 6Provision for connection of proposed sewer to existing sewer by dismantling of existing manhole wall or slab including reconstruction of it complete in all respect. | |||||
| 7Provision for shifting of existing utility for laying of Sewer lineand like as water pipe, electricity pole etc. | |||||
| 8Dismantling of Saptic Tank coming under the alignment of Laying of Sewer and providing, laying and fixing of HDPE pipe line crossing Saptic tank complete in all respect. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_589501.xls
BOQ • 0.25 MB
6I36AKZ155442.pdf
Additional Documents • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .