| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC Lowest Quoted Amount |
| 2 | L2₹1.9 CrRejected-Finance 1252 20 M AVNTIKA BHAWAN STATION ROAD MAINPURI | MAINPURI | MAINPURI | UTTAR PRADESH | ₹1.9 Cr | L2 | Rejected-Finance Not Lowest Quoted Amount |
| Sl No | Description | Qty | Unit | GLOBAL INFRATECH INDIA PVT LTD L2 | UDAY RAJ L1 |
|---|---|---|---|---|---|
| 1.00 | Demolishing brick work in cement concrete mortar manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material with in 50 mtr lead as per direction of Engineer -in charge | 171.62 | M³ | 300 ₹51,486 | 510 ₹87,526.20 |
| 2.00 | Demolishing cement concrete manually/by mechanical means including disposal of material with in 50 mtr lead as per direction of Engineer -in charge | 67.73 | M³ | 300 ₹20,319 | 510 ₹34,542.30 |
| 3.00 | Demolishing R.C.C work manually/by mechanical means including stacking of steel bars and disposal of unservicable material with in 50 mtr lead as per direction of Engineer -in charge | 91.05 | M³ | 300 ₹27,315 | 766 ₹69,744.30 |
| 4.00 | E/W in cutting or in embankment in ordinary soil excavation to be in the form of irregular pits and E/W in embankment to be in 20 cm layers including ramming and dressing the surface to the required level | 10,627.27 | M³ | 60 ₹6.4 L | 57 ₹6.1 L |
| 5.00 | Earth work in Foundation in dry ordinary soil (Loam,clay or sand)includin lift upto 1.50 M lead up to 30 M and including filling,watering and ramming of excavated earth into the trench or into the space between the structure and the side of foundation trenches or into the plinth with removel and disposal of surplus earth as directed by the Engineer-in-charge | 489 | M³ | 80 ₹39,120 | 76 ₹37,164 |
| 6.00 | Laying of Cement Concrete 1:3:6 in foundation with cement, c.sand & 10 to 20 mm Stone Grit including all labour and T&P etc complete. | 102.6 | M³ | 5,000 ₹5.1 L | 4,755 ₹4.9 L |
| 7.00 | Ist Class 150 Brick Work 1:4 With Cement & C-Sand including all labour material and t&p | 522.31 | M³ | 5,200 ₹27.2 L | 5,060 ₹26.4 L |
| 8.00 | Centering and shuttering for R.C.C. work for bridge slab including cost of labour material and T&P etc. required for completion of the work. | 454.13 | M² | 350 ₹1.6 L | 706 ₹3.2 L |
| 9.00 | Centering and shuttering of C.C. work including rent of suttering material labour and T&P etc. required for completion of the work. | 193.99 | M² | 350 ₹67,896.50 | 518 ₹1.0 L |
| 10.00 | Steel Reinforcement per MT. | 13.61 | M.T | 60,000 ₹8.2 L | 65,860 ₹9.0 L |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
15 Dec 2025, 1:00 pmClosed
S. E. I.W.C. Kanpur
Office of the S.E. IWC 98 Canal Colony Kanpur
Work of canal restoration and demarcation of canal land from km 0.000 to 35.000 (head to tail) of Ant Dy in Kanpur Dehat District.
2025_UPIDC_1088361_9
03/SE/2025-26
Open Tender
Civil Works
365 days
Kanpur Dehat
Technical and Financial Bid
2 documents required · 2 mandatory
₹2,720
₹4.4 L
31 Jan 2026
9 Dec 2025
15 Dec 2025
9 Dec 2025
15 Dec 2025
9 Dec 2025
Amount
Demolishing brick work in cement concrete mortar manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material with in 50 mtr lead as per direction of Engineer -in charge
Demolishing cement concrete manually/by mechanical means including disposal of material with in 50 mtr lead as per direction of Engineer -in charge
Demolishing R.C.C work manually/by mechanical means including stacking of steel bars and disposal of unservicable material with in 50 mtr lead as per direction of Engineer -in charge
E/W in cutting or in embankment in ordinary soil excavation to be in the form of irregular pits and E/W in embankment to be in 20 cm layers including ramming and dressing the surface to the required level
Earth work in Foundation in dry ordinary soil (Loam,clay or sand)includin lift upto 1.50 M lead up to 30 M and including filling,watering and ramming of excavated earth into the trench or into the space between the structure and the side of foundation trenches or into the plinth with removel and disposal of surplus earth as directed by the Engineer-in-charge
Laying of Cement Concrete 1:3:6 in foundation with cement, c.sand & 10 to 20 mm Stone Grit including all labour and T&P etc complete.
Ist Class 150 Brick Work 1:4 With Cement & C-Sand including all labour material and t&p
Centering and shuttering for R.C.C. work for bridge slab including cost of labour material and T&P etc. required for completion of the work.
Centering and shuttering of C.C. work including rent of suttering material labour and T&P etc. required for completion of the work.
Steel Reinforcement per MT.
Reinforced cement concrete (R.C.C.)1:1.5:3 with cement, c.sand & 10 to 20 mm Stone Grit
Supplying and Laying Local Sand including cost of all labour material and T&P etc. complete.
Cement concrete in Damaged Lining in C.C. 1:2:4 with cement coarse sand and aggregate 10 to 20 mm. stone grit including all material labour and t&p
Cement plaster 12 mm thick in 1:4 cement sand mix on brick wall.
Cement pointing 1:3 (stuck deep) on brick masonary including all material labour and t&p
Supplying and Fixing 110 mm dia PVC pipe .
Finishing walls with water proofing cement paint of approved manufacturers of required shade on uncoated wall over one coat white cement primer including curing and cost of material in two coats complete.
Writing letter on parapet wall including supply of all material labour and t&p etc. required for proper completion of the work.
Supplying and Fixing of Wheel guard Stone
Repair work in regulator gates Ant DY
Repair work in regulator gate Malkapurwa Mr
Repair work in regulator gates Escape
Repair work in regulator gatesKahinjari Mr
Repair work in regulator gates Kashipur Mr
Dry brick on edge soling in sand including preparation of sub grade and joints with local sand including cost of sand ,all material, labour and T & P etc. complete.(service Road)
P/F Retro reflective sign board are made 2 mm thick alluminium sheet face to be fully covered with engineers ,grade retro reflective as per colour required by I/O the retro reflective sheet shall be proceed on aluminum leased as per recommendation. Text and sign symbols will be computerised and fabricated on N.T. grade . The sheet with lives of extra frame of angle iron 32x32x3mm duly painted .Two posts of M.S Heavey duty chanel of 75x75x5mm3000 mm long and painted with synthetic enamel paint i/c cost of all material labour & T&p etc. required for proper completion of work.(IDSOR 01.09.2024 CHP-22/sr no-70
GLOBAL INFRATECH INDIA PVT LTD (BID ID -5747431)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.03 MB
TenderDocumentLot02.pdf
Tender Documents • 1.66 MB
BOQ_2021589.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid