Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹9.7 L+₹2.4 L (32.6%)Rejected-AOC 34 KAISER GANJ MANDI DIST MEERUT UP 250002 | MEERUT | UTTAR PRADESH | 250002 | L2 | Rejected-AOC Not Lowest | |
| 3 | L3₹9.9 L+₹2.6 L (35.7%)Rejected-AOC CITI COMPLEX KALAPAHAR GUWAHATI 781016 ASSAM | GUWAHATI | KAMRUP METRO | ASSAM | 781016 | L3 | Rejected-AOC Not Lowest | |
| 4 | L4₹10.7 L+₹3.4 L (47.3%)Rejected-AOC | L4 | Rejected-AOC Not Lowest | |
| 5 | L5₹13.3 L+₹6.0 L (82.8%)Rejected-AOC A 3 257 2ND FLOOR JANAKPURI ASALATPUR ROAD JANAKPURI WEST DELHI DELHI 110058 UDYAM DL 11 0007281 | WEST DELHI | DELHI | 110058 | L5 | Rejected-AOC Not Lowest |
Tender Value
₹16.8 L
EMD Value
₹33,600
Closing Date
25 Jan 2021, 6:00 pmClosed
GE (I) (AF) Shillong
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
CA NO . GE (I) (AF)/SHL/ OF 2020-21 SPECIAL REPAIRS FOR CONVERSION OF CHARPOY GI PIPE NEWAR INTO CHARPOY GI PIPE WITH PLYWOOD TOP AT LAITKOR PEAK UNDER GE (I) (AF) SHILLONG
2020_MES_401946_2
8026/20/SHL/2020/21
Open Tender
Miscellaneous Works
Item Rate
180 days
SHILLONG LAITKOR PEAK
For Enlisted Contractors Class E Category d i and for unenlisted contractors meeting enlistment criteria for required Class and Category
7 documents required · 7 mandatory
₹500
GE (I) (AF) SHILLONG
₹33,600
Yes
18 Feb 2021
5 Jan 2021
27 Jan 2021
5 Jan 2021
25 Jan 2021
13 Jan 2021
5 Jan 2021 - 9 Jan 2021
Amount
Removing unserviceable nylon newar from charpoy GI pipe, tightning complete charpoy i.e. loose check nuts, elbows, long rails & short rails and supply and fixing 12mm thick (7 ply) plywood, BWR grade ISI marked of size 1980mm x 900mm and three numbers MS flat iron of size 40mmx5mm of required length between the long rail on equal distance to provide more strength to plywood. MS flat iron shall be fixed with appropriate size (66 mm long and 6 mm dia) round head bolts and nuts with washer at ends and 30mm long and 6mm dia round head bolts and nuts with washer at centre. Three holes on each long rail and two holes on each short rail shall be made by drill machine and plywood shall be fixed with nuts, bolts and washer. Sufficient number of GI washers of suitable size/thickness on top to maintain the ply wood top in levelled position and one GI (heavy weight) washer on underside before tightning the nuts shall be provided and each nut shall be tightend with check nut. Stiffners shall be painted with two coats of synthetic enamel paint over a coat of red oxide primer including embossing 'MES' on all the four sides of plywood top complete all as specified and directed. (Note : The size of plywood viz 1980mmx900mm is firm. No tolerance in size of plywood shall be accepted. The plywood shall be provided in one piece for each chorpoy).
M & L removing old un-serviceable long rails from GI pipe charpoy and supply and fixing new long rail made out of 32mm bore medium grade GI pipe duly threaded on both ends and fixing to charpoy complete all as specified and directed.
M&L for removing old un-serviceable short rails from GI pipe charpoy and fixing short rails made out of long rails retrieved vide item No. 2 here-in-before duly threaded on both ends and fixing to charpoy complete all as specified and directed
M&L for removing old un-serviceable legs from GI pipe charpoy and fixing legs made out of short rails retrieved vide item No. 3 here-in-before duly threaded on one end including provn of 3mm thick MS sheet (made to shape of the bottom) in bottom and two numbers of clamps (as shown on drg) by welding complete all as specified and directed.
M&L for removing old un-serviceable 3 way elbow and supply & fixing new elbow 32mm bore (ISI marked) to GI pipe charpoy, complete, all as specified and directed
M&L for removing old un-serviceable check nuts and supply & fixing new check nuts 32mm bore 6mm thick to GI pipe charpoy, complete, all as specified and directed
Replacement of UNSV Wooden Blocks from the lower end of legs and provn of 3mm thick MS sheet (made to shape of the bottom) in bottom (as shown on drg) by welding complete all as specified and directed. NOTE:- Subject item is not applicable for item No. 4 here-in-above.
M/s Gupta Construction
KIRAN REED INDUSTRIES
M/S INSHA ELECTRICALS
Capital Construction Company
A K C PROJECT
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .