| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹32.6 LAccepted-AOC NEAR RADHAKRISHNA MANDIR SHASTRINAGAR GHUGUS TAH DIST CHANDRAPUR 442505 | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | 442505 | ₹32.6 L Quoted ₹27.7 L | L-1 | Accepted-AOC Lowest qualified bidder. Hence being awarded. |
| 2 | L-2₹28.2 LRejected-AOC NEW MAJRI COLLIERY DAFAI NO1 POST SHIVJI NAGAR TAH BHADRAWATI DIST CHANDRAPUR 442503 | BHADRAWATI | CHANDRAPUR | MAHARASHTRA | 442503 | ₹28.2 L | L-2 | Rejected-AOC Not a qualified L1 bidder |
| 3 | L-3₹31.9 LRejected-AOC | ₹31.9 L | L-3 | Rejected-AOC Not a qualified L1 bidder |
| 4 | L-4₹33.1 LRejected-AOC | ₹33.1 L | L-4 | Rejected-AOC Not a qualified L1 bidder |
Updated dates
Tender Value
₹44.4 L
EMD Value
₹55,600
Closing Date
9 Mar 2026, 6:25 pmClosed
Shri. Kundan Singh
OFFICE OF THE AREA GENERAL MANAGER WCL BALLARPUR AREA P.O. SASTI TA. RAJURA DIST. CHANDRAPUR (MS) PIN 442905
Strengthening of existing ap-proach road to weigh bridges at Railway siding under Gouri Central OCM under Gouri Central Sub Area
2026_WCL_353936_1
wcl-ba3650-civ-e106-25-26/1172
Open Tender
Civil Works - Roads
120 days
WCL Ballarpur Area
As per NIT
4 documents required · 4 mandatory
₹55,600
13 May 2026
20 Feb 2026
10 Mar 2026
20 Feb 2026
9 Mar 2026
21 Feb 2026
20 Feb 2026 - 25 Feb 2026
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m.( All kinds of soil )
Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. (A) Plant Mix Method For Grading-I Material
Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. (A). By Plant Mix Method For Grading-III Material
Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification.By Mechanical Means Note: for 1.00 cum of compacted thickness contractor have to supply following materials Grading- II (53 to 22.4mm)=1.21 cum Using Screening Type-A (11.20mm Agg.)=0.24 cum , stone dust=0.08 cum
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Construction of dry lean cement concrete Subbase over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length onstruction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-30 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but including cost of steel in dowel bar and tie rods etc.
Construction of embankment with approved materials CBR>7 deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.52 MB
BOQ_366755.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid