| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.9 LAdmitted-Finance | ₹45.9 L | L1 | Admitted-Finance |
| 2 | L2₹46.1 L+₹14,203.74 (0.31%)Admitted-Finance | ₹46.1 L+₹14,203.74 (0.31%) | L2 | Admitted-Finance |
| 3 | L3₹46.3 L+₹40,231.47 (0.88%)Admitted-Finance MAINPURI MEERUT | ₹46.3 L+₹40,231.47 (0.88%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S S.R. CONSTRUCTION AND SUPPLIERS L3 | M/s BIHARI JEE CONSTRUCTION L1 | M/s SHAILESH KUMAR L2 |
|---|---|---|---|---|---|---|
| 1.00Construction of 120 K.L.D Sump well and Pump House. and Ashafabad Bijli ghar Firozabad. | ||||||
| 2.00 | Earth work in cutting and cartage up to 80 K.M with all complete (item no. 251+253(d)+253€ | 96.39 | m3 | 301.5 ₹29,061.59 | 299.05 ₹28,825.43 Lowest | 299.5 ₹28,868.81 |
| 3.00 | Earth work in cutting and cartage up to 80 K.M with all complete (item no. 251+253(d)+253€ | 134.95 | m3 | 337.62 ₹45,561.82 | 336.17 ₹45,366.14 Lowest | 336.62 ₹45,426.87 |
| 4.00 | Brick Ballast 1:5:10 cement and Coarse sand mortar and 40 mm Brick Ballast in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | 12.85 | m2 | 5,499.5 ₹70,668.58 | 4,499.05 ₹57,812.79 Lowest | 4,499.5 ₹57,818.58 |
| 5.00 | Providing and laying cement concrete in 1:2:4 (1 Cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors. | 12.85 | sqm | 7,499.5 ₹96,368.58 | 6,499.05 ₹83,512.79 Lowest | 6,499.5 ₹83,518.58 |
| 6.00 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 19.46 | m3 | 7,999.5 ₹1,55,670.27 | 7,999.05 ₹1,55,661.51 Lowest | 7,999.5 ₹1,55,670.27 |
| 7.00 | RCC work Providing and laying in position specified grade of reinforced cement concrete including the cost of centering shuttering, finishing and excluding reinforcement - Above plinth level upto 1:1.5:3 (1 cement: 1.5 coarse sand 3 graded stone aggregate 20 mm nominal size) for wall. | 2.18 | m3 | 7,999.5 ₹17,438.91 | 7,999.05 ₹17,437.93 Lowest | 7,999.5 ₹17,438.91 |
| 8.00 | RCC work Providing and laying in position specified grade of reinforced cement concrete, Slab including the cost of centering shuttering, finishing and excluding reinforcement - Above level upto fifth floor level in :1:1.5:3 (1 cement: 1.5 coarse sand 3 graded stone aggregate 20 mm nominal size) for roof Slab. | 0.39 | m3 | 7,999.5 ₹3,119.81 | 7,999.05 ₹3,119.63 Lowest | 7,999.5 ₹3,119.81 |
| 9.00 | Supply of M.S Tor steel 10mm dia | 41.3 | Qtl | 7,779.5 ₹3,21,293.35 | 7,779.05 ₹3,21,274.77 Lowest | 7,779.5 ₹3,21,293.35 |
| 10.00 | Cleaning of Site and other related works asper site requirment. | 1 | Job | 24,999.5 ₹24,999.5 | 24,999.05 ₹24,999.05 Lowest | 24,999.5 ₹24,999.5 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
11 Jan 2024, 2:00 pmClosed
Municipal Commissioner
Nagar Nigam Firozabad
Work of laying pipeline for drainage work near Asafabad power house.
2024_DOLBU_877257_1
1832/Jalkal/2023-24
Open Tender
Civil Works - Water Works
Item Rate
30 days
Firozabad
Work of laying pipeline for drainage work near Asafabad power house.
2 documents required · 2 mandatory
₹7,200
Municipal Commissioner
₹1.2 L
19 Jan 2024
4 Jan 2024
11 Jan 2024
4 Jan 2024
11 Jan 2024
4 Jan 2024
Amount
Construction of 120 K.L.D Sump well and Pump House. and Ashafabad Bijli ghar Firozabad.
Earth work in cutting and cartage up to 80 K.M with all complete (item no. 251+253(d)+253€
Earth work in cutting and cartage up to 80 K.M with all complete (item no. 251+253(d)+253€
Brick Ballast 1:5:10 cement and Coarse sand mortar and 40 mm Brick Ballast in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.
Providing and laying cement concrete in 1:2:4 (1 Cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors.
RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
RCC work Providing and laying in position specified grade of reinforced cement concrete including the cost of centering shuttering, finishing and excluding reinforcement - Above plinth level upto 1:1.5:3 (1 cement: 1.5 coarse sand 3 graded stone aggregate 20 mm nominal size) for wall.
RCC work Providing and laying in position specified grade of reinforced cement concrete, Slab including the cost of centering shuttering, finishing and excluding reinforcement - Above level upto fifth floor level in :1:1.5:3 (1 cement: 1.5 coarse sand 3 graded stone aggregate 20 mm nominal size) for roof Slab.
Supply of M.S Tor steel 10mm dia
Cleaning of Site and other related works asper site requirment.
Diversion of Drain During construction of Sump well.
Constrution of Intake Drain
Earth work in cutting and cartage up to 80 K.M with all complete (item no. 251+253(d)+253€
Brick Ballast 1:5:10 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.
Providing and laying cement concrete in 1:2:4 (1 Cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors.
RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
RCC work Providing and laying in position specified grade of reinforced cement concrete, Slab including the cost of centering shuttering, finishing and excluding reinforcement - Above plinth level upto fifth floor level in :1:1.5:3 (1 cement: 1.5 coarse sand 3 graded stone aggregate 20 mm nominal size)
Screen Steel Stainless
Stainless Steel gate with frame.
Supply of M.S Tor steel 10mm dia
Supply and fabricate of M.S Clamp for the open area of Sumpwell size 5.00x3.30 mtr with 65x65x6 mtr angle and 65x6 mtr M.S Plate including all labour T&P.
Supply of fabricated Stain Steel ladder including all.
Cleaning of Site and other unforseen Item
Constrution of Pump House
Coloumn (R.C.C 1:1.5:3)
Beam (R.C.C 1:1.5:3)
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.
Deduction Door and Window
Supply of M.S Tor steel 10mm dia
12 mm thick cement plaster in single coat on fair side of single or hair brick well for interior plastering upto floor two level including brick wall for plastering upto floor two level including internal rounded angles not exceeding 80 mm in girth, hamfers and finished even and Stooth. No. extra for mixing any 1 cement : 6 coarse sand
Deduction Door and Window
Finishing walls with putty approved brand and etc ……….. All complete. (PWD/DSR SI No. New)
Wall painting (two coat) With plastic emulsion paint of approved brand etc. …………. All complete. (90+90=100)
Supply and Fixing of M.S gate with frame
Supply and Fixing of M.S Gourder (200mm channel) 3 Mtr.
250 m2/Hr डिस्जार्ज के 25 एच0पी0 इलैक्ट्रिक मोटर के साथ पम्प सेट अधिष्ठापन कार्य।
Supply of Self Priming Non Clog Mud Pump having Minimum Discharge of 250 m3 /hr at 12 m head 150x150 mm Suction and Dilivery Size coupled with approx 25 H.P Electric motor 3 phase 415 volt with base Plate.
150mm dia C.I D/F Sluice Valve
150 mm dia D/F Reflex valve
Main Switch 200 amp
Starter Panel for 25 H.P Motor ( with three indicator, volt mtr, Amp mtr.)
Change over Switch 200 amp.
Fixing of main switch Starter, change over with essential wire cable of proper size as per site Requirement.
Fixing of self priming clog mud Pump & coupled motor with construction of foundation including Supplying of all matrial labour etc.
Supply and fitting of 200 mm M.S Main feeder line with connecting both pump set with Supply of C.I flanged Tee 200x200x150, C.I Band and Supporting pillers. (excluding cost of Sluice Valve & Reflex Valve.)
Supply and fitting of 150 mm ms Suction line (2 Set) with Supply of band etc complete work with including complete Supporting as necessary.
आसफाबाद बिजली घर के पास जल निकासी हेतु सम्बैल का कार्य हेतु पाइप लाइन बिछाने का कार्य।
Supply of 250mm dia PVC Pipe 10kg/cm2 including cartage, loading, unloading. (I.S.I/I.S.O) mark ( as per market)
S/F of specials (fitting as socket, elbo, Reducer, Tee solvent, etc. for laying, Jointing PVC Pipe line.
Dismantling of road surface & Stacking at site (labour charges only) Interlocking Road surface
Dismantling of road surface & Stacking at site (labour charges only) Damer Road surface
Earth work in cutting and cartage up to 8 K.M with all complete (item no. 251+253(d)+253€
Carting laying, jointing, fitting & testing PVC pipe & specials including all etc 110mm 6kg/cm2 PVC pipe. (as per Tander rate)
For making inter connection of new laid pipe line with existing main line, complete with supply of required matarial and arrangement such as tee, D Joints, Clamp, solvent, ball, flag notice board etc. completion of work 160mmx90mm . (as per Tander rate)
Making Baricating of Site by bans including All. (as per Tander rate)
Other Unforseen Item
साइट अनसीन आइटम।
Dewatring work During construction 10 Hrs Perday 400 Hrs. (40 days)
Providing of Bandha
Removel of Bandha after Work.
Cleaning of Site
M/s SHAILESH KUMAR
M/S S.R. CONSTRUCTION AND SUPPLIERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .