Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.9 L+₹19.40 (0.01%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹5,820
Closing Date
24 Sept 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
CONSTRUCTION OF CULVERT NHO DR. AB QAYOOM BHAT AND OTHERS AT SANGAS KULGAM 12
2026_RDPR_324815_13
e- NIT No. 80 OF REWK/PRI/2026-27 Dated 16-09-2026
Open Tender
Civil Works
Percentage
45 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EX ENGINEER REW KULGAM
₹5,820
29 Sept 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
24 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearence by mannual means including removing rubbish,garbage,dismantelling of old damsged drain etc. | 1 | no | 553 | ₹553 |
| 2 | dismentiling of old damaged culvert by mechanical means c.j | 10 | hrs | 1,500 | ₹15,000 |
| 3 | earthwork in excavation by manual means | 3.4 | cum | 479.3 | ₹1,629.62 |
| 4 | P/L nallah stone stone solling including all carriages | 3.7 | cum | 1,266.2 | ₹4,684.94 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
(1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 8.7 | cum | 5,733.6 | ₹49,882.32 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
(1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) | 4 | cum | 8,200 | ₹32,800 |
| 7 | p/l in position of shuttering/ centering propping c.j | 35.7 | sqm | 286.35 | ₹10,222.7 |
| 8 | p/l in position of shuttering/ centering propping c.j | 13 | sqm | 718.2 | ₹9,336.6 |
| 9 | providing cutting placing bending tmt bars | 520.4 | kgs | 115 | ₹59,846 |
| 10 | Carriage of sand/bajrii 25kms lead | 20.2 | cum | 465.14 | ₹9,395.83 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1096098.xls
BOQ • 0.28 MB
extend3.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .