| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | ₹1.1 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.1 L+₹1,680 (1.54%)Rejected-Finance HNO 131 DOGRA HALL JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | ₹1.1 L+₹1,680 (1.54%) | L2 | Rejected-Finance Being L2 |
| 3 | L2₹1.1 L+₹1,680 (1.54%)Rejected-Finance 78 GREATER KAILASH KUNJWANI DISTRICT JAMMU | ₹1.1 L+₹1,680 (1.54%) | L2 | Rejected-Finance Being L2 |
| 4 | L3₹1.1 L+₹5,380 (4.94%)Rejected-Finance | ₹1.1 L+₹5,380 (4.94%) | L3 | Rejected-Finance Being L3 |
Tender Value
₹1.3 L
EMD Value
₹2,600
Closing Date
29 Jul 2021, 2:00 pmClosed
Executive Engineer University works department
Executive Engineer University works department
Strengthening protection works of existing ground floor building housing the office of Chief security officer University of Jammu by way of construction of pucca drain etc
2021_UDJK_129311_1
fresh 508 dated 23-6-21
Open Tender
Civil Works
Item Rate
60 days
University of Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer University works department
₹2,600
14 Sept 2021
2 Jul 2021
30 Jul 2021
2 Jul 2021
29 Jul 2021
2 Jul 2021
Amount
Earth work in excavation in all kinds of soil in foundation trenches pits and bulk evacuation including stacking soil neatly away from the edges, filling back by the sides of foundations in plinth in 150mm thick layers, ramming, watering and consolidation complete including disposal of surplus earth outside the University Campus. Nothing extra shall be paid on account of lead/lift and disposal of earth outside the University Campus.
Providing and laying cement concrete 1:5:10 ( 1 cement: 5 coarse sand: 10 grade crushed stone aggregate 40mm nominal sizes) in foundation and under flooring including machine mixing, finishing, consolidation, curing and form work complete.
Providing and laying in positon cement concrete 1:3:6 (1 Cement:3 Coarse Sand : 6 Graded stone aggregate 20 mm nominal size crushed stone aggregate) including cost of centering, shuttering (Formwork). All work upto plinth level.
50 mm thick Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand . : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and finishing etc. Complete.
10-15 mm thick cement plaster 1:4 (1cement : 4 fine sand) in single coat on rough/fair side of brick/concrete walls.
Steel work welded in built up sections, including cutting hoisting, fixing in position and applying a priming coat of approved steel primer and then (two or more coats) with synthetic enamel paint of approved brand and manufacture (Make Asian/Nerolac) In gratings, frames, guard bar, ladders, stair case railings, brackets, gates, trusses, frame work and similar works. All works upto height of floor V level.
M/S RAJ KUMAR CONTRACTOR
Rattan Chand
MANZOOR AHMED NATNOO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .