| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC VILLAGE POST FATEHPUR SANGAT GOSAIGANJ DISTRICT SULTANPUR | GOSAIGANJ | SULTANPUR | UTTAR PRADESH | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.7 L+₹31,709.71 (7.31%)Rejected-Finance NOT AVAILABLE | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.0 L+₹68,035.52 (15.7%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹10,100
Closing Date
6 Feb 2023, 1:00 pmClosed
EXECUTIVE ENGINEER IRRIGATION DIVISION AYODHYA
O/O EXECUTIVE ENGINEER IRRIGATION DIVISION AYODHYA
Estimate for reconstructing of V.R.B. at km 0.000 of Dariyapur Minor
2023_UPIDC_770707_5
06/EE/2022-2023
Open Tender
Civil Works
Item Rate
45 days
EXECUTIVE ENGINEER IRRIGATION DIVISION AYODHYA
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,151
₹10,100
16 May 2023
1 Feb 2023
6 Feb 2023
1 Feb 2023
6 Feb 2023
1 Feb 2023
Amount
Earth work in making diversion from ordinary soil including lead upto 30 m and lift 1.50m with manual compaction and proper comletion of work as per direction engineer in charge.
Dry Earth work in foundation of masonry work on channels of discharge above 10 cumecs, Including all lead & lift including disposal and back filling with all cost of labour and T&P etc.
Providing and laying of cement concrete (M-10) 1:3:6 (1 cement :3 Coarse sand: 6 stone grit 20-40 mm nominal size) in foundation, Including supply of all materials, labour, tools & plants and centering, shuttering etc. required for proper completion of work
Brick masonry in 1:4 Cement and coarse sand mortar using class 150 bricks complete in all respect, Including all leads, lifts, all cost of material, labour and T&P etc. required for porper completion of the work.
Centering & shutering for R.C.C. work including all cost of material, labour and T&P etc. required for porper completion of the work.
Centering & shutering for C.C. work including all cost of material, labour and T&P etc. required for porper completion of the work.
Steel Bending, Binding, Cutting and Placing in proper position, Including all cost of labour and material T&P etc. required for porper completion of the work.
Laying RCC of concrete grade 1:1.5:3 in slab and bed block with coarse sand and stone grit size 4.75 mm to 20 mm and cement, Including all cost of material, labour and T&P etc. required for porper completion of the work.
Laying CC of concrete grade 1:1.5:3 in wearing coat and parapet with coarse sand and stone grit size 4.75 mm to 20 mm and cement , Including all cost of material, labour and T&P etc. required for porper completion of the work.
Deep struck Cement Pointing with cement and coarse sand mortar 1:2 complete in all respect, Including all lead, lifts, cost of material, labour and T&P etc.
Providing & Fixing drainage pipe in slab of 75 mm dia PVC Including all cost of material, labour and T&P etc. required for porper completion of the work.
Providing and Placing 20 mm thick joint filler board with all cost of material, labour and T&P etc. complete.
Finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade new work( two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20kg/ 10 sqm) (apex ultima, weaather coat all quard) asian, berger
P/F wheel gaurd including all cost of labour and T&P etc. complete in all respect.
M/S DURGA CONSTRUCTION COMPANY
M/S BHOLU CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .