Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹46.2 L+₹4.8 L (11.6%)Admitted-Finance 077 KHARCHALPUR TAHBARPUR TIKAPUR NIZAMABAD AZAMGARH UTTAR PRADESH 276208 | AZAMGARH | UTTAR PRADESH | 276208 | L2 | Admitted-Finance | ||
| 3 | L3₹47.2 L+₹5.8 L (14.1%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹47.7 L+₹6.3 L (15.3%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹48.7 L
EMD Value
₹4.1 L
Closing Date
16 May 2026, 4:00 pmClosed
CHIEF ENGINEER
VARANASI NAGAR NIGAM
WARD N0. 5 SALARPUR ANTERGAT RASULGAR ME MUNNA PAL WALE SE CHEDI YADAV KE GHAR TAK ANTARICK GALIYO ME CC ROAD KA KARY
2026_NNVAR_1136653_61
01_cmnsy_VRS
Open Tender
Civil Works
Percentage
90 days
VARANASI NAGAR NIGAM
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹4,866
TENDER COST, Account no- 50100642535388
₹4.1 L
7 Jul 2026
8 May 2026
16 May 2026
8 May 2026
16 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1okMZ la[;k &05 lykjiqj vUrxZr jlqyx<+ esa eqUuk iku okys ls Nsnh ;kno o vkUrfjd xfy;ksa esa lhålhå jksM fuekZ.k dk;ZA | |||||
| 1.01 | E/W in cutting/filling embankment in os with 8km cartage etc all complete si no 253 | 503.99 | cum | 310.1 | ₹1,56,287.3 |
| 1.02 | Supply of Laying & consolidation of 22.4-53mm size stone ballast with all complete | 161.28 | cum | 2,857 | ₹4,60,776.96 |
| 1.03 | P/L 1:4:8 cement coarsd sand & 40 mm gauge stone ballast etc as per si 281 | 161.25 | cum | 5,550 | ₹8,94,937.5 |
| 1.04 | Supply and Laying of 125 micron polythene sheet under foundation etc | 2,015.94 | sqm | 45 | ₹90,717.3 |
| 1.05 | Providing and Laying cc road slab consisting of 1:1.5:3 cement coarse sand & 20 mm gauge stone ballast over prepared sub grade and including supply of all materials,labour and T&P etc required for proper completion of work etc | 302.39 | cum | 7,350 | ₹22,22,566.5 |
| 1.06 | M-150 brick work in 1:4 cement coarse sand etc as per si305b | 4.14 | cum | 5,500 | ₹22,770 |
| 1.07 | Construction of gully pit 2`*2`*3` etc all complete | 24 | nos | 8,757 | ₹2,10,168 |
| 1.08 | Supply and laying of 230mm dia sw pipe etc all complete | 24.25 | m | 634 | ₹15,374.5 |
| 1.09 | Construction of manhole 2`*2`*4` etc all complete | 1 | nos | 7,102 | ₹7,102 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
t2.pdf
Tender Documents • 10.67 MB
BOQ_2144476.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .