| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAdmitted-Finance | ₹5.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.1 Cr+₹11.9 L (2.00%)Admitted-Finance | ₹6.1 Cr+₹11.9 L (2.00%) | L2 | Admitted-Finance |
| 3 | L3₹6.1 Cr+₹15.2 L (2.56%)Admitted-Finance 302 1 SHIVKUTI PRAYAGRAJ | ₹6.1 Cr+₹15.2 L (2.56%) | L3 | Admitted-Finance |
| 4 | L4₹6.1 Cr+₹17.9 L (3.02%)Admitted-Finance | ₹6.1 Cr+₹17.9 L (3.02%) | L4 | Admitted-Finance |
| 5 | L5₹6.2 Cr+₹24.4 L (4.11%)Admitted-Finance BIRPARA PO BIRPARA DIST JALPAIGURI W B PIN 735204 | ALIPURDUAR | WEST BENGAL | 735204 | ₹6.2 Cr+₹24.4 L (4.11%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Bansal Highway Infratech Pvt Ltd L6 | M/s A.K. Associates L11 | R.G BUILDWELL ENGINEERS LTD. L12 | M/S ASHOK KUMAR L13 | M/S A.P.S. And Co. Pvt. Ltd. L7 | M/S HAUSALA PRASAD MISHRA L9 | M/s Vinod Kumar Pandey L3 | M/s S S Associates, Alld L4 | M/S NAV BHARAT TRADING COMPANY L5 | VIJAY SINGH L1 | R. A. AND SONS L8 | M/S SANJAY ENTERRPRISES L2 | M/S SURYANSH INFRA DEVELOPERS PVT LTD L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. | 6,741 | Sqm | 2.91 ₹19,616.31 | 3 ₹20,223 | 3 ₹20,223 | 3 ₹20,223 | 3 ₹20,223 | 3.8 ₹25,615.8 | 2.87 ₹19,346.67 | 3.5 ₹23,593.5 | 2 ₹13,482 Lowest | 2.9 ₹19,548.9 | 2.5 ₹16,852.5 | 2 ₹13,482 Lowest | 3 ₹20,223 |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table300-2. (Carted work from 2 KM) | 17,665.35 | Cum | 97.5 ₹17,22,371.63 | 50 ₹8,83,267.5 Lowest | 200 ₹35,33,070 | 180 ₹31,79,763 | 100 ₹17,66,535 | 170 ₹30,03,109.5 | 162.14 ₹28,64,259.85 | 50 ₹8,83,267.5 Lowest | 65 ₹11,48,247.75 | 100 ₹17,66,535 | 190 ₹33,56,416.5 | 90 ₹15,89,881.5 | 130 ₹22,96,495.5 |
| 3.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 2,784.74 | Cum | 51 ₹1,42,021.74 | 30 ₹83,542.2 | 50 ₹1,39,237 | 70 ₹1,94,931.8 | 30 ₹83,542.2 | 59.8 ₹1,66,527.45 | 45.26 ₹1,26,037.33 | 20 ₹55,694.8 Lowest | 30 ₹83,542.2 | 65 ₹1,81,008.1 | 56 ₹1,55,945.44 | 30 ₹83,542.2 | 65 ₹1,81,008.1 |
| 4.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 2,180.1 | Cum | 55 ₹1,19,905.5 | 65 ₹1,41,706.5 | 60 ₹1,30,806 | 70 ₹1,52,607 | 30 ₹65,403 Lowest | 65.1 ₹1,41,924.51 | 49.28 ₹1,07,435.33 | 40 ₹87,204 | 70 ₹1,52,607 | 50 ₹1,09,005 | 60 ₹1,30,806 | 30 ₹65,403 Lowest | 65 ₹1,41,706.5 |
| 5.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of tableNo300-2 (Carted work from 2 KM) | 6,234.88 | Cum | 159 ₹9,91,345.92 | 100 ₹6,23,488 | 200 ₹12,46,976 | 180 ₹11,22,278.4 | 100 ₹6,23,488 | 210.7 ₹13,13,689.22 | 159.49 ₹9,94,401.01 | 70 ₹4,36,441.6 Lowest | 70 ₹4,36,441.6 Lowest | 150 ₹9,35,232 | 190 ₹11,84,627.2 | 90 ₹5,61,139.2 | 140 ₹8,72,883.2 |
| 6.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 3,326.85 | Cum | 1,795 ₹59,71,695.75 Lowest | 2,600 ₹86,49,810 | 2,700 ₹89,82,495 | 2,650 ₹88,16,152.5 | 2,300 ₹76,51,755 | 2,700 ₹89,82,495 | 2,043.9 ₹67,99,748.72 | 1,800 ₹59,88,330 | 2,000 ₹66,53,700 | 1,800 ₹59,88,330 | 2,400 ₹79,84,440 | 2,000 ₹66,53,700 | 2,350 ₹78,18,097.5 |
| 7.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 5,296.5 | Cum | 2,370 ₹1,25,52,705 Lowest | 3,100 ₹1,64,19,150 | 3,200 ₹1,69,48,800 | 3,050 ₹1,61,54,325 | 2,700 ₹1,43,00,550 | 3,000 ₹1,58,89,500 | 2,519.51 ₹1,33,44,584.72 | 2,800 ₹1,48,30,200 | 2,775 ₹1,46,97,787.5 | 2,800 ₹1,48,30,200 | 2,700 ₹1,43,00,550 | 2,400 ₹1,27,11,600 | 2,750 ₹1,45,65,375 |
| 8.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Stablized) | 3,531 | Cum | 5,697 ₹2,01,16,107 | 6,000 ₹2,11,86,000 | 6,500 ₹2,29,51,500 | 7,000 ₹2,47,17,000 | 5,200 ₹1,83,61,200 | 4,300 ₹1,51,83,300 Lowest | 5,226.17 ₹1,84,53,606.27 | 5,200 ₹1,83,61,200 | 4,900 ₹1,73,01,900 | 5,000 ₹1,76,55,000 | 4,800 ₹1,69,48,800 | 5,700 ₹2,01,26,700 | 6,050 ₹2,13,62,550 |
| 9.00 | Providing and applying tack coat with bitumen using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 35,310 | Sqm | 8 ₹2,82,480 | 8 ₹2,82,480 | 11 ₹3,88,410 | 15 ₹5,29,650 | 8 ₹2,82,480 | 13 ₹4,59,030 | 6.07 ₹2,14,331.7 Lowest | 12 ₹4,23,720 | 10 ₹3,53,100 | 12.5 ₹4,41,375 | 13 ₹4,59,030 | 7 ₹2,47,170 | 12 ₹4,23,720 |
| 10.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects | 1,412.4 | Cum | 9,050 ₹1,27,82,220 | 10,000 ₹1,41,24,000 | 10,500 ₹1,48,30,200 | 11,000 ₹1,55,36,400 | 9,000 ₹1,27,11,600 | 9,000 ₹1,27,11,600 | 7,985.29 ₹1,12,78,423.6 Lowest | 9,000 ₹1,27,11,600 | 8,900 ₹1,25,70,360 | 8,000 ₹1,12,99,200 | 9,800 ₹1,38,41,520 | 8,400 ₹1,18,64,160 | 9,300 ₹1,31,35,320 |
Tender Value
₹8.1 Cr
Closing Date
24 Aug 2021, 12:00 pmClosed
SE, Prayagraj Circle, PWD, Prayagraj
Office of the SE, Prayagraj Circle, PWD, Prayagraj
Sirathu Dhata marg se Chaknoorpur hote huye Bhadehri tak marg (ODR) ke chaurikaran and sudhrikaran ka karya
2021_CEALD_609714_2
7724/11Kam-B-Pra.Vritt/2021-22 Dt. 27-07-2021
Open Tender
Civil Works - Roads
Item Rate
180 days
Kaushambi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,336
Exempted
Prayagraj
31 Aug 2021
9 Aug 2021
24 Aug 2021
9 Aug 2021
24 Aug 2021
9 Aug 2021
11 Aug 2021
Amount
Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table300-2. (Carted work from 2 KM)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of tableNo300-2 (Carted work from 2 KM)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Stablized)
Providing and applying tack coat with bitumen using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
P/L of Interlocking concrete block pavement having thickness 80 mm as per drawing and technical specification clause 1504 (rubber moulded) Zigzag Tile inclg all labour material T&P etc complete
P.C.C. grade M 10 (1:3:6) Providing concrete for plain/rainforced concrete in open foundations complete as per drawings and Mord specification Clauses 802,803,1202, 1203
P.C.C. grade M 15 (1:2:4) Providing concrete for plain/rainforced concrete in open foundations complete as per drawings and technical specification Clauses 802,803,1202, 1203
RCC Grade M20 Providing concrete complete as per drawings and Mord specification
Brick work M-150 Maslonry work in cement mortar 1:3 in foundation complete inclg all labour material T&P etc complete
Pointing Pointing with cement mortar (1:3) on brickwork/ C.R. Stone masonry as per drawing and technical specification Clause 613.3 and 1204 inclg all labour material T&P etc complete
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications inclg all labour material T&P etc complete
S/l of 600mm dia NP-3 H.P. culvert inclg all labour material T&P etc complete
M/S SANJAY ENTERRPRISES
M/s Vinod Kumar Pandey
M/s S S Associates, Alld
M/S NAV BHARAT TRADING COMPANY
Bansal Highway Infratech Pvt Ltd
M/S A.P.S. And Co. Pvt. Ltd.
R. A. AND SONS
M/S HAUSALA PRASAD MISHRA
M/S SURYANSH INFRA DEVELOPERS PVT LTD
M/s A.K. Associates
R.G BUILDWELL ENGINEERS LTD.
M/S ASHOK KUMAR
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.73 MB
BOQ_943230.xls
BOQ • 0.24 MB
sbd.pdf
Additional Documents • 2.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .