Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 CrAccepted-Finance | ₹6.0 Cr | L1 | Accepted-Finance oK |
| 2 | L2₹6.1 Cr+₹10.7 L (1.79%)Accepted-Finance | ₹6.1 Cr+₹10.7 L (1.79%) | L2 | Accepted-Finance oK |
| 3 | L3₹6.3 Cr+₹26.0 L (4.34%)Accepted-Finance | ₹6.3 Cr+₹26.0 L (4.34%) | L3 | Accepted-Finance oK |
| 4 | L₹6.5 CrAccepted-Finance | ₹6.5 Cr | L | Accepted-Finance oK |
| 5 | L₹6.6 CrAccepted-Finance | ₹6.6 Cr | L | Accepted-Finance oK |
Tender Value
₹8.5 Cr
EMD Value
₹16.9 L
Closing Date
9 Jan 2026, 3:00 pmClosed
EE CD XI IFC DEPTT
OFFICE OF EE CD XI IFC DEPTT SECTOR-15 ROHINI DELHI
Construction of Double lane RCC bridge near RD 16830m on Supplementary Drain.
2025_IFC_283609_1
EE/CD-XI/NIT-101/2025-26
Open Tender
Civil Works
Percentage
365 days
DELHI
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹16.9 L
17 Jan 2026
24 Dec 2025
9 Jan 2026
24 Dec 2025
9 Jan 2026
24 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50mters and lift upto 1.5 m, as directed by engineer in charge. All kinds of soil | 107.34 | cum | 187.3 | ₹20,104.78 |
| 2 | Hand packing stones in wire crates excl. cost of crates and stones | 185.43 | cum | 371.15 | ₹68,822.34 |
| 3 | Supply of Nallah stone boulders (collection charges within Nallah) | 185.43 | Cum | 700 | ₹1,29,801 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 64.4 | cum | 218.4 | ₹14,064.96 |
| 5 | Repair to damaged/worn out crates incl. packing of boulders, knitting and binding all complete job | 18 | No | 553 | ₹9,954 |
| 6 | Carriage of material from soures upto site of work by mechanical transport including loading unloading and stacking. Wire crates from Divisional Store avg. 18 km | 1.98 | M.T | 1,023.35 | ₹2,026.23 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_872898.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .