Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.7 LAccepted-Finance | ₹83.7 L | L1 | Accepted-Finance 1st lowest |
| 2 | L2₹88.0 LAccepted-Finance | ₹88.0 L | L2 | Accepted-Finance 2nd lowest |
| 3 | L3₹90.1 LAccepted-Finance | ₹90.1 L | L3 | Accepted-Finance 3rd lowest |
| 4 | L4₹1.1 CrAccepted-Finance KARNATAKA | RAICHUR | KARNATAKA | 584123 | ₹1.1 Cr | L4 | Accepted-Finance High rate |
| Sl No | Description | Qty | Unit | S.Thartius Enginnering contractors L4 | HK MOHAMMED KASIM L2 | KM ABDUL MUTHALIF L3 | SAMEER RIYAS PV L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead including cost of all labour charges, mionor tools etc. complete. | 30 | Each | 531 ₹15,930 | 300 ₹9,000 | 250 ₹7,500 | 450 ₹13,500 |
| 2.00 | Dismantling of damaged brick work, RCC, PCC etc. and disposing of the unserviceable materials within a lead of 300 mtrs including cost of all labour charges, tools etc. complete. | 121 | CUM | 3,540 ₹4.3 L | 2,400 ₹2.9 L | 2,100 ₹2.5 L | 1,480 ₹1.8 L |
| 3.00 | Earth work excavation in all soils and filling in foundation etc. in 150 mm layers including cost of all labour charges, tools etc. complete. | 41 | CUM | 767 ₹31,447 | 350 ₹14,350 | 700 ₹28,700 | 380 ₹15,580 |
| 4.00 | Providing and laying CC 1:4:8 mix using 40 mm granite jelly including cost of all materials, all labour charges, tools, transportation of materials to the work site within a lead of 3 kms providing shuttering and centering wherever necessary etc. complete. | 9 | CUM | 9,000 ₹81,000 | 17,000 ₹1.5 L | 11,500 ₹1.0 L | 16,400 ₹1.5 L |
| 5.00 | R.C.C. 1:1½ :3 (1 cement, 1½ sand and 3 granite chips 20mm down size) for foundation footing of column in position specified grade of reinforced cement concrete including cost of all materials, labour charges and minor tools, transportation of materials to work site excluding the cost of centring, shuttering and reinforcement etc. complete. | 10 | CUM | 18,290 ₹1.8 L | 24,000 ₹2.4 L | 19,100 ₹1.9 L | 17,800 ₹1.8 L |
| 6.00 | Providing and laying P.C.C. 1:3:6 using 20 mm stone metal including cost of all labour for mixing, placing, curing, cost of minor tools and hire charges of mixer machine, vibrator, etc., cost of all materials. | 12 | CUM | 11,800 ₹1.4 L | 18,500 ₹2.2 L | 16,200 ₹1.9 L | 16,800 ₹2.0 L |
| 7.00 | Filling in plinth with excavated sand under floor including watering, ramming consolidation etc., including cost of all labour charges etc., complete. | 42 | CUM | 590 ₹24,780 | 300 ₹12,600 | 380 ₹15,960 | 380 ₹15,960 |
| 8.00 | R.C.C. 1:1½ :3 (1 cement, 1½ sand and 3 granite chips 20mm down size) for Column including cost of all materials, labour charges and minor tools, transportation of materials to work site excluding the cost of centring, shuttering and reinforcement etc. complete. | 7 | CUM | 20,650 ₹1.4 L | 25,000 ₹1.8 L | 20,500 ₹1.4 L | 18,800 ₹1.3 L |
| 9.00 | R.C.C. 1:1½ :3 (1 cement, 1½ sand and 3 granite chips 20mm down size) for beam, slab, lintel, sunshade etc., including cost of all materials, labour charges and minor tools, transportation of materials to work site excluding the cost of centring, shuttering and reinforcement etc. complete. | 60 | CUM | 21,830 ₹13.1 L | 24,950 ₹15.0 L | 19,500 ₹11.7 L | 18,800 ₹11.3 L |
| 10.00 | Providing form work for RCC works including cost of all labour charges, tools, cost of all materials, transportation of materials to the work site within a lead of 3 kms etc. complete. | 682 | Sqm | 885 ₹6.0 L | 650 ₹4.4 L | 1,100 ₹7.5 L | 740 ₹5.0 L |
Tender Value
₹94.2 L
EMD Value
₹1.9 L
Closing Date
10 Nov 2025, 3:00 pmClosed
Executive Engineer(C)
O/O DCE(LD), ALHW, Kavaratti
Revamping of ALHW Transit Accommodation at Agatti in lakshadweep
2025_ALHW_881427_1
DCE/KVT/DB/T-36/2025-26/2435 Dt 11.10.2025
Open Tender
Civil Works
180 days
Agatti Island
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.9 L
25 Apr 2026
14 Oct 2025
11 Nov 2025
14 Oct 2025
10 Nov 2025
14 Oct 2025
14 Oct 2025 - 24 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_926442.xls
BOQ • 0.25 MB
BID.pdf
Tender Documents • 1.36 MB
Download all tender documents and submit your bid