Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All Documents Uploaded |
| 2 | Accepted-Technical | Accepted-Technical All Documents Uploaded |
| 3 | Accepted-Technical | Accepted-Technical All Documents Uploaded |
| 4 | Accepted-Technical | Accepted-Technical All Documents Uploaded |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹4.0 L
Closing Date
18 Jun 2026, 2:00 pmClosed
SE IWC MIRZAPUR
SE IWC IRRIGATION COLONY FATHA MIRZAPUR
Restoration of Kathauta Bundhi and its offtaking minor in District Sonbhadra
2026_UPIDC_1158897_2
02/SE/2026-27
Open Tender
Civil Works
Item Wise
365 days
Sonbhadra
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹4.0 L
5 Sept 2026
10 Jun 2026
18 Jun 2026
10 Jun 2026
18 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Damaged stone boulder & kattal stacking with all lead & lift including all cost of labours, T&P, all taxes for proper completion of the work. | 1,036.06 | Cum. | 1.25 | ₹1,295.07 |
| 2 | Dismentaling of old C.R.S masonary including staking of boulder all alabour T& P as per direction of Engineer in charge. | 32.05 | Cum. | - | - |
| 3 | Dismentaling of old RCC Structure including disposing of scrap material, all alabour T& P as per direction of Engineer in charge. | 7.1 | Cum. | 100 | ₹709.5 |
| 4 | Laying 150mm thick stone Kattal below stone boulder with all lead & lift including all cost of Materials, labours, T&P, all taxes for proper completion of the work. | 749.84 | Cum. | 53 | ₹39,741.52 |
| 5 | Re Laying old stone Boulder over Laid Stone Kattal with all lead & lift including all cost of Materials, labours, T&P & all taxes for proper completion of the work. | 725.24 | Cum. | 10 | ₹7,252.4 |
| 6 | Supply New stone Boulder 300mm thick over Laid Stone Kattal with all lead & lift including all cost of Materials, labours, T&P & all taxes for proper completion of the work. | 310.82 | Cum. | 11 | ₹3,419.02 |
| 7 | E/W Excavation of Foundation in ordinary soil/sandy loam, clay or sand, soil mixed with boulder/ set slush in canal section including lift upto 1.5 m. & lead upto 30 m with disposal of excavation earth as directed by Engg-in-charge. | 1,981.81 | Cum. | 10 | ₹19,818.07 |
| 8 | Preparation of subgrade for lining work excuding cost of earth work including cost of all material, labour, T&P, Taxes etc. required for proper completion of work. | 1,508 | Cum. | 22 | ₹33,176 |
| 9 | P/L 100 mm thick Local sand in filter in bed and slope with cost of material, labour, T&P, Taxes etc. required for proper completion of work. | 111.28 | Cum. | - | - |
| 10 | Laying C.C. (1:3:6) in foundation with cement, course sand and hard stone ballast including all cost of material, labour, T&P, Taxes etc. required for proper completion of work. | 159.65 | Cum. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.79 MB
tdl02pdf.pdf
Tender Documents • 1.37 MB
BOQ_2172022.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .