Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹5.0 L
Closing Date
29 Jul 2026, 2:30 pm
GM Contracts
Indian Oil Corporation Limited (Pipelines Division) A-1, Udyog Marg, Sector-1, NOIDA Phone 01202448419
Realignment of 22 Inch MPPL at Ch 595.350 km and 24 Inch SMPL at Ch 367.750 km across Sukri River under WRPL Rajola jurisdiction by carrying out HDD and hook up at both ends by Hot tapping method
2026_PLHO_190456_1
PLCC/Sukri HDD/CL/26040
Open Tender
Civil Works
185 days
As per tender document
As per tender document
9 documents required · 9 mandatory
₹5.0 L
Yes
Through VC
8 Jul 2026
8 Jul 2026
30 Jul 2026
8 Jul 2026
29 Jul 2026
22 Jul 2026
8 Jul 2026 - 16 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2GST % for the tender Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ. | |||||
| 10Civil - HDD Sukri river - MPPL 22" | |||||
| 10.01 | PART-A HDD WORKS '-Design, detailed engineering & installation of pipeline / pipeline & OFC conduit(paid separately) across rivers, NH, SH, Expressways, Railways, etc by HDD method. '-Complete work for the crossing (between the limits, as indicated in the approved drawings) including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as per all provisions of the contract document and instructions of the Owner. -Interpretation of data of hydrological / geo-technical surveys furnished by the Owner, carrying out fresh topographic survey of the rivers, NH, SH, Expressways, Railways, etc & developing new profile drawing for the crossing location, carrying out additional surveys required for collecting data relevant to design and construction of the crossing, performing all engineering & design calculations, preparation of all necessary construction drawings for approval of the Owner as per the provisions of contract document, preparation of detailed construction method statement and design analysis. '-Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. '-Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. '-Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation and handling.'-Pre-construction surveys and collection of all necessary data. '-String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiographs, repair of defects in the welds and re-testing etc. '-Coating of the field joints of the pipe string to be installed by HDD method with DIRAX heat shrink sleeves of M/s Raychem's make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make used for HDD crossings. '-Repair of all coating damages in the pipe section to be laid by HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of M/s Raychem make, DDXTM Directional Drilling Kit of M/s Canusa or of any other approved make. '-Fabrication of 89mm OD steel conduit with an inner duct of 40mm OD HDPE pipe for OFC (wherever OFC has to be laid along with the carrier pipeline).(paid separately) '-Supply & fixing of easy to install heat shrinkable duct end caps for HDPE conduit for OFC (wherever OFC has to be laid along with the carrier pipeline).(paid separately) '-Carrying out air cleaning, gauge pigging and pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of defects and retesting etc. '-Installation of the pipeline / pipeline and OFC conduit (paid separately) as a bundle crossing below the rivers, NH, SH, Expressways, Railways, etc by single horizontal directional drilling operation to the correct profile as per the approved drawings. '-Carrying out post-installation hydrostatic testing of HDD pipe string (along with transition pipe section). '-Carrying out post-installation coating survey as per approved procedure. -Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc.'-Transportation of surplus Owner-supplied pipes to the designated stockpile location of the Owner.'-Preparation of as-built drawings and other records etc. '-All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works. NOTE:The Contractor shall have the option for installation of 89 mm OFC conduit(paid separately) as Bundled HDD installation along with the HDD installation of carrier pipe OR as a separate HDD instalation. However, the payment and payment terms shall remain the same in both the cases. Installation of OFC conduit shall be paid separately under PART-B HDD Works HDD FROM 751 METER TO 1000 METER (OFC conduit to be paid separately) | - | - | - | - |
| 10.02 | 22 INCH in Rocky Soil | 800 | M | 66,572 | ₹5,32,57,600 |
| 10.03 | Carrying out Calliper survey for ascertaining the internal geometry of the installed pipeline sections including mobilization/ demobilization of pigging tools, tackles, consumables, accessories and personnel by contractor at work site including magnetic pig, electronic geometry pig, preparation and cleaning of the pipeline sections by running series of foam pigs for cleaning the line from debris, water & making it dry for launching calliper pigs, running of magnetic pig for cleaning of ferrous residue, launching and receiving the electronic & standard calliper pigs, data retrieval, interpretation of data and submission of reports in the form acceptable to the Owner, rectification of defects observed from calliper survey (if HDD is executed by the same contractor), including supply of all labour, materials, equipment & instruments, calliper pigs, fabrication of launching & receiving barrels, all complete as per specifications and directions of Site Engineer / Engineer-in-Charge. DIAMETER | - | - | - | - |
| 10.04 | 22 INCH | 1 | LS | 3,74,327 | ₹3,74,327 |
| 10.05 | Carrying out tieing-in and hook-up of the installed HDD sections including laying of transition piping upto 12 m for hook-up with existing Mainline on either side of HDD crossing including all excavation/ trenching in all kinds of soil including rock,transportation of coated pipe from owner's stackyard, cutting of pipe, pre-testing of pipe sections before hook-up, making field bends out of pre-tested pipes (pipes shall be supplied by Owner) to match the site requirement, welding, carrying out 100% radiography, field joint coating, holiday detection, repair of damaged coating, backfilling and making through the pipeline etc. complete in all respects as per specifications and directions of Engineer-in-Charge. DIAMETER | - | - | - | - |
| 10.06 | 22 INCH | 1 | EA | 2,64,293 | ₹2,64,293 |
| 10.07 | #Laying of Owner-supplied pre-coated mild steel line pipes, including arranging all additional land/construction corridor, beyond Owner's ROW, required for Contractor's storage, fabrication, access for construction site, movement of construction equipment etc., receiving and taking over Owner-supplied materials, handling, transportation etc. from Owner's issue point to work site, stringing along Right of Way (ROW)/ pipeline corridor, providing labour, equipment and supply of other inputs & materials/ consumables necessary to perform and complete the work in all respects in accordance with the contract including, but not limited to, the following works:#Taking delivery and transportation of Owner-supplied coated pipes to the work site from designated Stockpile location, inspection of the coated pipes visually and with holiday detector for defects, arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position;#Clearing and grading of ROW/ pipeline corridor, cutting of trees, vegetation etc. including keeping record of trees cut, including de-watering etc.;#Stringing of pipes along ROW including providing straw bags/ soft padding below pipe;#Trenching to all depths to maintain clear earth cover as per specification and to fit minimum bend radius, by excavation in all kinds of terrain & soil, including stripping top soil to a depth of 30cm to the full anticipated width of the ditch and storing this material separately along the ROW to allow re-depositing of the same on top of the backfilled ditch (in cultivable and other areas specially designated by Owner);#Carrying out repair of pipe & coating defects for defects occurring after taking over of pipes from Owner, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation & handling;#Carrying out 100% radiographic inspection (by X-Ray) of all field weld joints as per Specifications and Special Conditions of Contract (SCC) and destructive testing of one weld joint as per specification and direction of Site Engineer, including providing Crawler type Automatic X-Ray machine and/ or external X-Ray machine and all other requisite equipment, labour, supervision, materials, approved films, approved consumables, all facilities and personnel to process, develop, examine and interpret radiographs (by qualified and experienced Radiography Inspector), providing all facilities to Owner's representative(s) for examining radiographs and other tests as required, carrying out repair of weld-joints found defective, carrying out re-radiography and other tests as required on repaired joints, etc.;#Carrying out coating of all field weld joints, by specified coating insulators, including supply of approved joint coating materials, providing all equipment, materials and consumables necessary to carry out the job as per manufacturer's recommendation;#Carrying out holiday detection at specified voltage level corresponding to coating type as per specifications, and repair of coating, if any;#Laying pipeline by open-cut method at crossings viz., cart-track, village road, metalled/ un-metalled roads, minor water courses (MWC) and restoration of the site to original condition;#Lowering the pipeline in trench, tieing-in, backfilling with excavated earth and/or other suitable soil (top soil stored separately during trenching shall be backfilled on top of the ditch) as directed by Site-Engineer;#Carrying out air cleaning, gauge pigging and hydrostatic testing (to specified pressure) of the complete pipeline including providing pre-testing of designated sections as approved by Engineer-in-Charge, providing all equipment, pumps, fittings, instruments, dead weight tester etc. and services, supervision, labour, consumables, testing of water, supply & injection of corrosion inhibitor, locating leaks, if any, and rectification of defects attributable to Contractor, re-testing after rectification etc. and cleaning the pipeline section after successful hydrotesting;#All tie-ins, including tieing-in with HDD section;#Obtaining work permits/ NOC from various authorities, having jurisdiction, before execution of work and complying with all stipulations/ conditions/ recommendation of the authorities;#Final clean-up and restoration of ROW/ construction corridor, field bunds etc. and obtaining NOC from statutory authorities (as required), and obtaining NOC from respective landowners in respect of final restoration of their land etc., disposal of debris and returning surplus material to designated disposal areas/ storage location, as directed by Engineer-in-Charge, restoration of land, facilities and boundary wall etc. for facilities dismantled/ damaged by Contractor during construction;#Preparation of As-Built drawings, Pipe book and other records as per specifications etc.;#Supply of all materials (other than those specifically undertaken to be supplied by the Owner under the contract);#All other acts, deeds, matters and things necessary to make the pipeline ready for commissioning and completing the works in all respects as per drawings, specifications and instructions of Site Engineer/ Engineer-in-Charge. Note: Liability of Owner to provide ROW to contractor shall be limited to the extent between the hook-up points with existing pipeline including for laying transition pipeline section. Additional space required by contractor beyond the above limits, including for access to site, shall be arranged by contractor at his own cost & initiative. Payment under this item shall be made only for the transition pipe laid more than 12 m length on both sides. Transition Pipe laying upto 12 m length on both sides is included in the SOR item for Tie-In and Hook up. DIAMETER | - | - | - | - |
| 10.08 | 22 INCH | 25 | M | 6,772 | ₹1,69,300 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tender-Acceptance-Format.pdf
Additional Documents • 0.08 MB
FAQs-IOCL-Online-EMD.pdf
Additional Documents • 0.55 MB
Specifications1_Civil_A.1 CIVIL_ML-HDD-Specs Latest _PLHO site.pdf
Additional Documents • 19.99 MB
Specifications1_Civil_Boundary Pillar_STD-472-01.pdf
Additional Documents • 0.09 MB
Specifications1_Civil_D.2 SAMPLE DRAWING HOOK-UP OF MAINLINE WITH HDD.pdf
Additional Documents • 0.54 MB
Specifications1_Civil_HDD at River crossing _STD-759-00.pdf
Additional Documents • 0.07 MB
Specifications1_Civil_Hot pull bends_Rev. 01_16.08.2022.pdf
Additional Documents • 0.32 MB
Specifications1_Civil_Mech_Specs_Welding for ML & HDD_Aug 2022_PLHO.pdf
Additional Documents • 17.10 MB
Specifications1_Civil_Standard Pipeline Marker_STD-473-01.pdf
Additional Documents • 0.09 MB
Specifications1_Civil_Trench for Mainline _STD-470-05.pdf
Additional Documents • 0.21 MB
Specifications1_Civil_Warning board sign _STD-474.pdf
Additional Documents • 0.07 MB
Specifications1_Electrical_TCP Works_Specifications_Approved Vendor List13.01.2026_CP Materials.pdf
Additional Documents • 0.07 MB
Specifications1_Electrical_TCP Works_Specifications_TCP-HDD.pdf
Additional Documents • 6.63 MB
Specifications2_Hot Tapping Works_List of Recommended Vendors Rev11.pdf
Additional Documents • 12.69 MB
Specifications2_Hot Tapping Works_Mat Spec_API 602 VALVES.pdf
Additional Documents • 0.03 MB
Specifications2_Hot Tapping Works_Mat Spec_ASTM A 106 Pipe.pdf
Additional Documents • 0.02 MB
Specifications2_Hot Tapping Works_Mat Spec_BI DI PIG.pdf
Additional Documents • 0.34 MB
Specifications2_Hot Tapping Works_Mat Spec_FASTENERS.pdf
Additional Documents • 0.03 MB
Specifications2_Hot Tapping Works_Mat Spec_FLANGES.pdf
Additional Documents • 2.28 MB
Specifications2_Hot Tapping Works_Mat Spec_HALF COUPLING & NIPPLE.pdf
Additional Documents • 0.02 MB
Specifications2_Hot Tapping Works_Mat Spec_HOT TAPPING SPLIT TEE.pdf
Additional Documents • 0.22 MB
Specifications2_Hot Tapping Works_Mat Spec_PIPE FITTINGS.pdf
Additional Documents • 1.24 MB
Specifications2_Hot Tapping Works_Mat Spec_PU FOAM PIG.pdf
Additional Documents • 0.28 MB
Specifications2_Hot Tapping Works_Mat Spec_SPIRAL WOUND METALLIC GASKET.pdf
Additional Documents • 0.02 MB
Specifications2_Hot Tapping Works_Mat Spec_Thread-O-Ring_Fitting.pdf
Additional Documents • 0.09 MB
Specifications2_Hot Tapping Works_Mat Spec_TPI List_Rev.04.pdf
Additional Documents • 0.53 MB
Specifications2_Hot Tapping Works_Mat Spec_TRV PRV.pdf
Additional Documents • 0.20 MB
Specifications2_Hot Tapping Works_Mat Spec_WELD O LET.pdf
Additional Documents • 0.02 MB
Specifications2_Hot Tapping Works_Work Spec_13 B - HOT TAPPING IN LIQUID PL EXCEPT LPG AND NATURAL GAS- Signed.pdf
Additional Documents • 9.79 MB
Specifications2_Hot Tapping Works_Work Spec_CSW SPECIFICATIONS - Variable Part.docx
Additional Documents • 0.06 MB
Specifications2_Hot Tapping Works_Work Spec_CSW STD SPECIFICATIONS.pdf
Additional Documents • 2.24 MB
Specifications2_Hot Tapping Works_Work Spec_Hot pulled bend.pdf
Additional Documents • 0.34 MB
Specifications2_Hot Tapping Works_Work Spec_Hot Tapping work Specs Rev 1.pdf
Additional Documents • 0.32 MB
Specifications2_T&I_04B.Specifications_ML+CSW_Telecom_06.12.23.docx
Additional Documents • 0.03 MB
Specifications2_T&I_Datasheet_HDPE_Conduit.pdf
Additional Documents • 0.22 MB
Specifications2_T&I_IOCL-TC RFID MARKER .docx
Additional Documents • 0.16 MB
Specifications2_T&I_IOCL-TC SPEC HDPE_REV01.pdf
Additional Documents • 6.11 MB
Specifications2_T&I_IOCL-TC SPEC JOINT KIT _48F_06.12.23.docx
Additional Documents • 0.15 MB
Specifications2_T&I_IOCL-TC SPECWARNING TAPE 02022021.docx
Additional Documents • 0.25 MB
Technical Annexures_Civil_CPE guidelines for Public Portal.pdf
Additional Documents • 0.74 MB
Technical Annexures_Civil_List of Technical Annexures.docx
Additional Documents • 0.02 MB
Technical Annexures_Civil_T#1.docx
Additional Documents • 0.02 MB
Technical Annexures_Civil_T#10.doc
Additional Documents • 0.04 MB
Technical Annexures_Civil_T#11 Geo tech Survey report for Sukri Feb 2025.pdf
Additional Documents • 26.17 MB
Technical Annexures_Civil_T#12.docx
Additional Documents • 0.03 MB
Technical Annexures_Civil_T#13 (Contractor Performance Format).docx
Additional Documents • 0.10 MB
Technical Annexures_Civil_T#14 (Key personnel ).docx
Additional Documents • 0.02 MB
Technical Annexures_Civil_T#15 Hindrance Register.pdf
Additional Documents • 0.01 MB
Technical Annexures_Civil_T#16 (Equip. proposed).docx
Additional Documents • 0.02 MB
Technical Annexures_Civil_T#2.doc
Additional Documents • 0.04 MB
Technical Annexures_Civil_T#2A.docx
Additional Documents • 0.02 MB
Technical Annexures_Civil_T#3.docx
Additional Documents • 0.02 MB
Technical Annexures_Civil_T#4.docx
Additional Documents • 0.02 MB
Technical Annexures_Civil_T#5.docx
Additional Documents • 0.03 MB
Technical Annexures_Civil_T#6(A).docx
Additional Documents • 0.02 MB
Technical Annexures_Civil_T#6(B).docx
Additional Documents • 0.03 MB
Technical Annexures_Civil_T#7.docx
Additional Documents • 0.02 MB
Technical Annexures_Civil_T#8.docx
Additional Documents • 0.02 MB
Technical Annexures_Civil_T#9.docx
Additional Documents • 0.02 MB
Technical Annexures_Electrical_Annexures_Annexures-TCP works.docx
Additional Documents • 0.05 MB
Technical Annexures_Mechanical_Annexures.docx
Additional Documents • 0.03 MB
Technical Annexures_T&I_Annexure T&I.docx
Additional Documents • 0.04 MB
Special_Instructions_to_the_Bidders_Version_5_dated_30_June_2025.pdf
Additional Documents • 2.80 MB
Bidders_help_Document_for_Preferencial_Bidding_20230207_v1.pdf
Additional Documents • 0.82 MB
PLCC26040.pdf
Tender Documents • 7.86 MB
BOQ_200791.xls
BOQ • 0.33 MB
Commercial Annexure_Annexure_Commercial_R5_ProtectedR1_w.r.t_GCC.xls
Additional Documents • 0.48 MB
Commercial Annexure_Integrity Pact Format-Annexure-27.pdf
Additional Documents • 3.21 MB
Commercial Annexure_MoPNG order dt 26042022.pdf
Additional Documents • 0.22 MB
Commercial Annexure_PPE Guidelines.pdf
Additional Documents • 8.38 MB
Commercial Annexure_PPP MII Order dated 16 09 2020.pdf
Additional Documents • 4.23 MB
Drawings_Civil_SAMPLE DRAWING HOOK-UP OF MAINLINE WITH HDD_HDD DRAWING_Referance_MISC-1461-00-DRAWING HOOK-UP OF MAINLINE WITH HDD.jpg
Additional Documents • 0.61 MB
Drawings_Civil_SAMPLE DRAWING HOOK-UP OF MAINLINE WITH HDD_HDD DRAWING_Referance_MISC-1461-00-DRAWING HOOK-UP OF MAINLINE WITH HDD_bkpl.pdf
Additional Documents • 0.16 MB
Drawings_Civil_SAMPLE DRAWING HOOK-UP OF MAINLINE WITH HDD_HDD DRAWING_Referance_Thumbs.db
Additional Documents • 0.01 MB
Drawings_Civil_SAMPLE DRAWING HOOK-UP OF MAINLINE WITH HDD_MISC-1461-00-DRAWING HOOK-UP OF MAINLINE WITH.pdf
Additional Documents • 0.54 MB
Drawings_Electrical_TCP drawings_TCP Drawings_STD-481-08.pdf
Additional Documents • 0.15 MB
Drawings_Electrical_TCP drawings_TCP Drawings_STD-482-02.pdf
Additional Documents • 0.08 MB
Drawings_Electrical_TCP drawings_TCP Drawings_STD-483-04.pdf
Additional Documents • 0.24 MB
Drawings_Electrical_TCP drawings_TCP Drawings_STD-488-01.pdf
Additional Documents • 0.12 MB
Drawings_Electrical_TCP drawings_TCP Drawings_STD-489-03.pdf
Additional Documents • 0.07 MB
Drawings_Electrical_TCP drawings_TCP Drawings_STD-514-01.pdf
Additional Documents • 0.23 MB
Drawings_Electrical_TCP drawings_TCP Drawings_STD-784-01.pdf
Additional Documents • 0.06 MB
Drawings_Electrical_TCP drawings_TCP Drawings_STD-786-00.pdf
Additional Documents • 0.09 MB
Drawings_Mechanical_TENDER DRAWINGS_STD 363 05.pdf
Additional Documents • 0.36 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-233_ VALVE OPERATING PLATFORM.pdf
Additional Documents • 0.17 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-355_BUTT WELD DETAILS.pdf
Additional Documents • 0.06 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-356_UNDER GROUND PIPE SUPPORT.pdf
Additional Documents • 0.07 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-357_WELD-O-LET CONNECTION.pdf
Additional Documents • 0.06 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-358-01 INSTRUMENT CONNECTION.pdf
Additional Documents • 0.08 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-358-01-INSTR PIPING.pdf
Additional Documents • 0.39 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-359 ALIGNMENT OF FLANGES.pdf
Additional Documents • 0.05 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-360_DETAILS OF FABRICATED TEE.pdf
Additional Documents • 0.08 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-361_FABRICATED MITERED BEND.pdf
Additional Documents • 0.10 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-363-05-1 OF 3.pdf
Additional Documents • 0.12 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-363-05-2 OF 3.pdf
Additional Documents • 0.13 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-363-05-3 OF 3.pdf
Additional Documents • 0.11 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-365_SAMPLING POINT.pdf
Additional Documents • 0.08 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-425_VALVE SUPPORT FOUNDATION.pdf
Additional Documents • 0.14 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-492_PIPE SUPPORT FOR MANIFOLD.pdf
Additional Documents • 0.20 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-494_SCREW JACK SUPPORT.pdf
Additional Documents • 0.44 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-660-01.pdf
Additional Documents • 0.17 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-718-00 SH 1.pdf
Additional Documents • 0.13 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-718-00 SH 2.pdf
Additional Documents • 0.14 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-747-03.pdf
Additional Documents • 1.36 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-821-01-1 OF 3.pdf
Additional Documents • 0.14 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-821-01-2 OF 3.pdf
Additional Documents • 0.14 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-821-01-3 OF 3.pdf
Additional Documents • 0.13 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-821-02-SH3.pdf
Additional Documents • 0.21 MB
Drawings_Mechanical_TENDER DRAWINGS_STD-913-00-TRV.pdf
Additional Documents • 0.22 MB
Drawings_T&I_OFC_All Drawings HDD.pdf
Additional Documents • 3.81 MB
Drawings_T&I_OFC_STD-978-00_06.12.23.pdf
Additional Documents • 1.75 MB
Download all tender documents and submit your bid