Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹10,706.75 (5.71%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-SEAL & SIGN OF CA ON GST REGISTRATION MISSING, GSTR-3B OF ANOTHER PERSON UPLOADED, CAN LEAD TO FRAUD CASE. |
Tender Value
₹2.0 L
EMD Value
₹3,980
Closing Date
24 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
C/O ROAD WITH DRAIN AND SIDE WALL FROM ORCHARD OF HAROON RASHID BHAT TO SONAULLAH BHAT AT ARAGAM AT BLOCK BANDIPORA
2026_RDPR_321183_43
NIT63
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹3,980
30 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
24 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting trees incl. cutting trunk, branches and removing of roots and stacking of serviceable material of the girth beyond 30cm girth upto 60cm | - | No. | - | - |
| 2 | Earth work in foundation trenches of drains not exceeding 1.5m in width in all kinds of soils with normal lead & lift(Mechanical Means) | - | cum | - | - |
| 3 | Providing and laying of stone soling incl carriage complete job incld plum | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | - | - |
| 6 | Surface dressing of road incl. removal of vegetation, inequalities not exceeding 15cm deep and disposal of rubbish lead upto 50m | - | Sqm | - | - |
| 7 | Providing and laying of RCC spun pipes (12'' Dia or 300mm) with collar incl. carriages and costs complete job | - | No. | - | - |
| 8 | P/A 12mm thick plaster in 1:6 mix | 1 | sqm | 1 | ₹1 |
| 9 | Carriage of Sand/aggregate incl. HL | 24.93 | cum | 421 | ₹10,495.53 |
| 10 | MP/Fixing of signboard and Photographs (as approved by Engineer in-charge) Unforseen items | 1 | LS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_1071824.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .