Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹0.53Admitted-Fee/PreQual/Technical/Finance | -47.20% | ₹0.53 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹0.57+₹0.04 (7.58%)Admitted-Fee/PreQual/Technical/Finance | -42.99% | ₹0.57+₹0.04 (7.58%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹0.63+₹0.10 (18.9%)Admitted-Fee/PreQual/Technical/Finance | -37.00% | ₹0.63+₹0.10 (18.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹0.66+₹0.13 (24.6%)Admitted-Fee/PreQual/Technical/Finance | -34.00% | ₹0.66+₹0.13 (24.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹0.66+₹0.13 (24.6%)Admitted-Fee/PreQual/Technical/Finance | -33.79% | ₹0.66+₹0.13 (24.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
29 May 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Anga
Maintenance nd Repairment of Various Quarters of Housing Colony Khanabal nd other Buildings of RnB Division Anantnag.
2026_PWDJK_310680_1
NIT 16 of RnB/Ang/2026-27/1879-88 Dt 22/05/26
Open Tender
Civil Works
Percentage
300 days
Anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹800
Executiver Engineer rnB Division Anantnag
₹40,000
6 Jun 2026
22 May 2026
30 May 2026
22 May 2026
29 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means in foundation trenches, drains, pipes and asbles etc (not exceeding 1.5 Mir In of 10 Sahin plant including dressing of sides and ramming of bottoms, lit upt 15 Mr Including griting out anated tod and disposal of surplus soil as directed and lead up to 50 Mtrs. | 1 | Cum | - | - |
| 2 | Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1 | sqm | - | - |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1 | Cum | - | - |
| 4 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 1 | sqm | - | - |
| 5 | Providing and laying hand packed stone soling in foundation under floors etc incl ramming, watering and consolidating complete.cort al carriages of all materials involved upto site of work complete job. | 1 | Cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade M-7 5 excluding the cost of centering and shuttering-All work at all levels in 1:48 (1 Cement 4 coarse sand 8 graded stone aggregate 40 mm nominal size) including cost and carriage of all materiali involved upto site of work complete job. | 1 | Cum | - | - |
| 7 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design imis, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of RMC from transit mixer to site of laying excluding the cost of centering, shuttering finishing and forcement including cost of admixtures in recommended proportions as per 15 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability na per direction of the Engineer in charge Note Cement content considered in this item is @ 330 kg/ cum. Excess less cement used as per design mis is payable recoverable separately All works upto plinth level, complete job. | 1 | Cum | - | - |
| 8 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement control as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer in charge Note Cement content considered in this item is 330 kg/ cum. Excess/ less cement used as per design mix is payable recoverable separately All works above Plinth Level & Upto Floor V Lvl, complete job. | 1 | Cum | - | - |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering 1.2.4 (1 cement 2 coarse sand 4 graded stone aggregate 20 mm nominal size), incl. carriages, complete. | 1 | Cum | - | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level, Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1 | Kgs | - | - |
stage.html
html • 0.03 MB
finance_1004878.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1004878.xls
BOQ • 0.86 MB
CORRIGENDUMDATE16.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .