Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹75.2 LAdmitted-Finance | -24.01% | ₹75.2 L | L1 | Admitted-Finance |
| 2 | L2₹83.2 L+₹7.9 L (10.6%)Admitted-Finance | -15.99% | ₹83.2 L+₹7.9 L (10.6%) | L2 | Admitted-Finance |
| 3 | L3₹84.1 L+₹8.9 L (11.8%)Admitted-Finance | -15.05% | ₹84.1 L+₹8.9 L (11.8%) | L3 | Admitted-Finance |
| 4 | L4₹98.0 L+₹22.8 L (30.3%)Admitted-Finance | -1.00% | ₹98.0 L+₹22.8 L (30.3%) | L4 | Admitted-Finance |
Tender Value
₹99 L
EMD Value
₹2.0 L
Closing Date
25 Feb 2026, 6:00 pmClosed
SE PHED CIRCLE BHILWARA
Pur Road Bapu Nagar Bhilwara
Ratliyas bandh per naya pump house nirman kunwo ka sudhardhikaran and pipe line ka work
2026_PHCJA_538390_2
NIT NO 59to79/2025-26 SE PHED CIRCLE BHILWARA
Open Tender
Civil Works - Water Works
Percentage
270 days
BHILWARA
Please refer Tender documents.
12 documents required · 12 mandatory
₹3,000
EE PHED CITY DN. BHILWARA
₹2.0 L
Yes
16 Mar 2026
16 Feb 2026
26 Feb 2026
16 Feb 2026
25 Feb 2026
16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter. | |||||
| 1.1 | All kind of soil | - | Cum | 314 | - |
| 2Providing and laying in position specified grade of reinforcement cement concrete all RCC structural elements upto plinth level including curing compaction finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering shuttering and reinforcement level. | |||||
| 2.1 | M20 Grade nominal mix (with graded stone aggregate 20mm nominal size) | 1 | Cum | 4,934 | ₹4,929.07 |
| 3 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | - | Sqm. | 157 | - |
| 3.1 | Add 20% extra for shuttering in circular work (in respective centering and shuttering items) | 1 | Sqm | - | - |
| 4Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) | |||||
| 4.1 | Cold twisted deformed bars (IS : 1786). | - | Kg. | 77 | - |
| 5Supply & lying River-gravels of following sizes in recharge shaft, filter pit after screening & washing from kachha shift without deduction of voids | |||||
| 5.1 | Size 9 to 12 mm | 1 | Cum | 1,997 | ₹1,995 |
stage.html
html • 0.03 MB
technical_960865.pdf
techsummary_960865.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
TD60.pdf
Tender Documents • 10.46 MB
BOQ_960865.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .