Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.1 LAccepted-Finance | ₹16.1 L | L1 | Accepted-Finance Lowest bidder |
| 2 | L2₹17.1 L+₹1.0 L (6.40%)Rejected-Finance | ₹17.1 L+₹1.0 L (6.40%) | L2 | Rejected-Finance not L1 |
| 3 | L3₹18.4 L+₹2.3 L (14.2%)Rejected-Finance | ₹18.4 L+₹2.3 L (14.2%) | L3 | Rejected-Finance not L1 |
| Sl No | Description | Qty | Unit | sidra interiors L2 | FLUI TECH ENGINEERS PRIVATE LIMITED L3 | Dnova Infracon Pvt. Ltd. L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supply of Split Airconditioner (Diakin/ Bluestar/LG/Hitachi/Carrier)/ 1.5 ton inverter ac split with standard accessories | 30 | Nos | 38,500 ₹11,55,000 | 37,500 ₹11,25,000 | 33,695 ₹10,10,850 Lowest |
| 2.00 | Installation , testing & commisioning units with hilty fasteners, tie rod etc. | 30 | Nos | 1,750 ₹52,500 Lowest | 1,859 ₹55,770 | 2,250 ₹67,500 |
| 3.00 | Providing and fixing of 25 mm Addittional copper piping including fitttings , dressing cavity, clamps duly insulated by 9mm K flex high density insulation | 210 | mtr | 1,200 ₹2,52,000 Lowest | 1,680 ₹3,52,800 | 1,400 ₹2,94,000 |
| 4.00 | Providing and fixing Additional PVC Drain pipe make polypack/supreme/Prince | 300 | mtr | 200 ₹60,000 | 245 ₹73,500 | 190 ₹57,000 Lowest |
| 5.00 | Providing and installation of unarmoured 3 core x 2.5 sqmm copper Electrical cables with conduit (Make polycab/Havells) | 300 | mtr | 250 ₹75,000 | 252 ₹75,600 | 200 ₹60,000 Lowest |
| 6.00 | Providing and fixing fibrecoated MS Stand with vibration pads | 30 | mtr | 1,650 ₹49,500 | 1,752 ₹52,560 | 1,300 ₹39,000 Lowest |
| 7.00 | Providing Chase cutting in walls for copper pipes and drain pipes | 100 | mtr | 200 ₹20,000 Lowest | 525 ₹52,500 | 425 ₹42,500 |
| 8.00 | Shuttering Charges for 2 and 3rd floor outdoor installation-approx | 1 | nos | 50,000 ₹50,000 | 52,000 ₹52,000 | 40,000 ₹40,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹35,000
Closing Date
26 May 2026, 4:00 pmClosed
Principal
Hindu College
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SPLIT AC FOR 2ND AND 3RD FLOOR IN NEW SCIENCE BLOCK AT HINDU COLLEGE
2026_DU_909412_1
HC/TE/2026/AC NAB
Limited
Civil Works - Buildings
Works
30 days
Hindu College
as per NIT
2 documents required · 2 mandatory
₹1,000
Principal, Hindu College
₹35,000
Yes
5 Jun 2026
20 May 2026
27 May 2026
20 May 2026
26 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of Split Airconditioner (Diakin/ Bluestar/LG/Hitachi/Carrier)/ 1.5 ton inverter ac split with standard accessories | 30 | Nos | - | - |
| 2 | Installation , testing & commisioning units with hilty fasteners, tie rod etc. | 30 | Nos | - | - |
| 3 | Providing and fixing of 25 mm Addittional copper piping including fitttings , dressing cavity, clamps duly insulated by 9mm K flex high density insulation | 210 | mtr | - | - |
| 4 | Providing and fixing Additional PVC Drain pipe make polypack/supreme/Prince | 300 | mtr | - | - |
| 5 | Providing and installation of unarmoured 3 core x 2.5 sqmm copper Electrical cables with conduit (Make polycab/Havells) | 300 | mtr | - | - |
| 6 | Providing and fixing fibrecoated MS Stand with vibration pads | 30 | mtr | - | - |
| 7 | Providing Chase cutting in walls for copper pipes and drain pipes | 100 | mtr | - | - |
| 8 | Shuttering Charges for 2 and 3rd floor outdoor installation-approx | 1 | nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_955807.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .