Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.3 LAccepted-AOC OLD KD COLONY BUKBUKKA KHALARI RANCHI DIST RANCHI JHARKHAND PIN 829205 | RANCHI | RANCHI | JHARKHAND | 829205 | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical CAMP WARD NO 15 CINEMA ROAD DHANPURI DIST SHAHDOL MP | DHANPURI | SHAHDOL | MADHYA PRADESH | - | Rejected-Technical Rejected as L-2 | |
| 3 | Rejected-Technical CAMP CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | Rejected-Technical Rejected as L-3 |
Tender Value
₹18.4 L
EMD Value
₹23,100
Closing Date
23 Jan 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Mining)
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Dismantling of 800 mm drive head (double drive drum) 01 no., Dismantling of 800 mm drive head (single drive drum) 02 no., Installation of 800 mm drive head at Damini UG mine of Sohagpur Area
2024_SECL_297852_1
SECL/SGP/ET/23-24/646 dt07/01/24
Open Tender
Civil Works - Others
Item Rate
365 days
Damini UG Mine
As per NIT
8 documents required · 8 mandatory
₹23,100
22 Feb 2024
8 Jan 2024
26 Jan 2024
8 Jan 2024
23 Jan 2024
9 Jan 2024
8 Jan 2024 - 15 Jan 2024
Amount
Item Description/ Heading Part (A) labour Cost
Cleaning/removal of debris/stone from galleries and stacking within 50 m distance (4*8.00 * 4.00 * 0.2 = 8 M3)
Groove cutting in solid coal/stone for foundation, manhole/duggi hole/pits and excavated material to be removed and stacked separately within 50m.distance. Cutting in soft stone by chisel & hammer = a) For Drive head - (2 nos.*4.00*0.50*1.0 = 4.00 m3 b) For discharge - (4 nos.*0.50*0.50*1.0 = 1.00 m3c) For loop takeup - (4 nos.*0.50*0.50*1.0 = 1.00 m3 for single drive head 03 nos. ( 2*2.0*0.50*1.0 = 6.00 m3 Total = 12.00 m3
Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface. = 9.34 m3Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface. = 9.34 m3Cement - 12.00 m3 @ 0.2225m3/m3 = 2.67 m3Sand - 12.00 m3 @ 0.445m3/m3 = 5.34 m3Stone Chips- 12.00 m3 @ 0.89m3/m3 = 10.68 m3
Loading of all kind building materials in to tub at Inc. mouth- Cement - 2.67 m3, Sand- 5.34m3, Stone chips- 10.68 m3 Total - 18.69 m3
Unloading of all kind building materials in to tub at destination- Cement - 2.67 m3, Sand- 5.34m3, Stone chips- 10.68 m3 Total - 18.69 m3
Dismantling and transporting of 800mm drive head (Double drive drum) with loop take up and all accessories (like as motor, gearbox, drive drum, girders, frame, chute & side plates etc) with lead of 100m/ up to track end. ( 3RW/3L VI B seam)
Dismantling and transporting of 800mm drive head (Single drive drum) with all accessories without loop take-up with lead of 100m/ up to track end (-18LW between 5RE&4RE - 01 no., -23LW between 5RE&4RE - 01 no., total - 02 nos.)
Installation of 800 mm drive head (double drive drum) with all accessories with loop take-up (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. in-charge (-10L between 5RE&6RE - 01 no.)
Installation of 800 mm drive head (single drive drum) with all accessories ( without looptake up) including carrying manually from end of track in u/g and assembling the same as per instruction of exe. In-charge/Engineer (-18LW between 5RE&4RE - 01 no., -23LW between 5RE&4RE - 01 no., -23LE between 5RE&6RE - 01 no.)
Cement concrete/PCC (1:2:4) in foundation/plinth /flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials) Quantity As per Sl. No. 2
Dismantling of belt structure along with PVC belt (800mm/1000mm) including cleaning stacking the same within a distance of 50m ( 3RW/3L section in VI B seam- 315 m., 5RE/ -32Lto -38L - 129M, -18LW/5R to 5RW- 213M., -23LW/5R to 5RW - 213M.,)
Transportation of steel structures materials from surface to underground through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination. Or Transportation of all dismantled steel structures materials in u/g from one section to other Section or u/g to surface through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading &stacking the same at destination beltingTransportation of dismentaled materials manually up to Loading point,loading in tub/trolly in uderground ,transportation of materials through haulage ,pushing manually up to unloading point,unloadingfromtub/trolly,manual Unloading from tubs/trolleys and transporting up to desination and stacking
Installation/erection of complete belt conveyor structure(800mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete ( -10 L/ 5RE to 30RE - 525 M., 5RE/ -32Lto -38L - 129M, -18LW/5R to 5RW- 213M., -23LW/5R to 5RW 213M., -23LE/5R to 12RE- 150M = Total - 1230 M)
Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/transporting from other section through haulages/pushing manually
Transportation of PVC belt (800mm) from surface to u/g or one section to another section in u/g through haulages with tramming, pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading, unloading & stacking the same at destination Quantity As per Sl. No. 11 ( 1230 m. Bouble lenght X 2= 2460 M.)
Placing of PVC belt (800mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor Quantity As per Sl. No. 11 ( 1230 m. Bouble lenght X 2= 2460 M.)
Transportation of rail line (30lbs), wooden/iron sleepers, fish plates, nut bolts, dog nail etc. Including loading on trolley, transporting through haulages/pushing manual from surface to u/g Or one section to another section up to destination/end of track, unloading & stacking the same. ( Total Lenght for establishing of haulage -9 L/ 6RE to 28RE - 462 M.)
Establishing of haulage track line in u/g inincluding carrying of rails & sleepers, laying & jointing of rails by fish plate with nut-bolts and fitting with sleepers by dog nail with a lead of 50 m. ( -9 L/ 6RE to 28RE - 462 M.)
Filling/packing of haulage track line with unserviceable materials/debris in a layer and consolidating of each layer by ramming, lead upto 50 m. (462 X 1.00 X 0.20 = 92.40m3)
Part-B(Material cost) Supply & stacking of materials at Damni UG Mine. Quantity As per Sl. No. 3 Cement - 2.67 m3 @ 28.57 bag/m3 =76 Bag
Stone
Total impact of GST for the purpose of CTC
MOHD ISMAIL
Ram Awadh Singh
techsummary_308513.pdf
PDF • 0.25 MB
finsummary_308513.pdf
PDF • 0.24 MB
AOC646.pdf
PDF • 1.96 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .