Tender Value
₹6.9 Cr
EMD Value
₹13.7 L
Closing Date
13 Jul 2026, 12:00 pm
Similar tender results from the same govt authority in the past 3 years.
Provision of track machine staff rest room & Engineering siding at PMI, TIA, SHK & KRTR in KG Section
W7ETENDER5OPENDNR26-27-13
W7ETENDER5OPENDNR26-27-13
Open
16 Months
Leh Ladakh, Ladakh
₹0
₹13.7 L
18 Jun 2026
18 Jun 2026
29 Jun 2026
Item Breakup - B-Schdule B
Supply and laying of quarry dust including cum consolidation, supply of all materials, labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media. Cutting / cropping of rail of 60Kg - 90 UTS, manually and perfectly vertical with contractor's labour, hacksaw blade and tools & plants - Note: 1.Manual cutting should be used only in emergencies with prior permission of sectional ADEN where machine cutting can not be arranged in time. 2. Cutting of Rails with blade and forcing to part by using other means to break the rails is prohibited. 3.Rails should be cut right through hacksaw blades only.
In-situ situation Drilling of hole of different diameter and chamfering, in rail of any section and any UTS manually only in emergencies with contractor's labours, tools & plants, consumables etc.
Hole of dia. 26.5mm and above Gas cutting of rail of various sections with contractor's tools & plants, as directed by engineer in-charge :
Rail section of 52Kg and above Under Traffic Block: Dismantling of existing BG turnouts, diamond crossings and derailing switches with all types of rails and sleeper layout, removing rails, switches, crossings, sleepers & fastenings, leveling of ballast to correct profile & stacking all the released materials, sleepers, fastenings, rails, switches & crossings including segregating & stacking at specified locations in a neat and countable manner, within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed. Note: 1. This item shall be operated only when existing turnout is replaced either with new turnout in case of TTR or with plain track when existing turnout is no more required at that location. 2. Rail cutting will be paid extra under relevant item. 3. Laying of new turnout or plain track on prepared ballast bed, as required, shall be paid separately under relevant item.
1 in 8½ Turnout (Under Traffic Block)
Dismantling the existing BG Buffer-stop laid Set with rails & wooden/ST sleepers including leading the dismantled Buffer stop materials to nominated places within station yard limits and stacking as material-wise and classification-wise duly releasing all fittings carefully without causing any damage with all contractor's labour, tools, with all lead and lifts, crossing of tracks if any, etc., complete as directed by the Engineer-in-charge. DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY Assembling complete BG Turnout on staging, clear of infringements, to correct gauge and alignment as per standard drawings with all types of rail sections over PSC sleepers at specified locations, duly leading rails, special sleepers, switches, crossings with a maximum lead of 500m, all lift & crossing of track as required and testing points with S&T staff for throw of switch etc. at station yard after levelling surface complete including lubrication of all fastenings, complete in all respect. Note: 1.Rail cutting and Drilling shall be paid separately 2. Required P.Way fittings/fastenings shall be supplied at the SSE/P.Way stores.
1 in 8½ Turnout Laying and linking all types of turnouts, diamond crossings and Derailing switches with 52Kg / 60Kg rail section on PSC sleepers on ballast bed, prepared after dismantling & removal of existing turnout/normal line during TTR/yard remodeling under traffic block, as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings including rail cutting, drilling, fixing of all components, fittings with housing of tongue rails as per requirement of signaling, preparing ballast bed, filling and spreading of ballast as required, linking of turnout with track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastening, complete as directed by Engineer in-charge. Note: Payment for dismantling & removal of existing turnout/normal line, transportation/stacking of released material and preparing of ballast bed is not included in this item and shall be paid under relevant item.
1 in 8½ Turnouts Lifting the newly inserted BG 60 Kg. / 52 Kg. turnouts/ trap switches to required level to provide full ballast cushion as per approved drawings after initial laying with Railway's stone ballast in convenient stages including one round of through packing after completion of final stage of lift, levelling, aligning, gauging and boxing to standard profile to make it fit for 20 kmph with all lead and lifts, complete in all respect and as directed by the Engineer-in- charge. Note: 1. The item shall be used only when UNIMAT is not available for the work before the turnout is opened for operation. 2. Leading and dumping of ballast will be paid separately under relevant item.
For 1 in 8½ Points & Crossing
For Derailing Switch DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY
Lifting and packing for regrading the existing TRM PSC sleeper track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in-charge.
Extra for additional lift over 75mm for every TRM 50mm lift or part thereof up to 275mm for item nos. 083010 for each TRM.
Boxing and profiling of ballast as per TRM procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge.
Removing, screening and salvaging ballast cum from track, duly digging / scarifying ballast by beaters / wire brushes or any mechanical means, leveling and dressing formation with specified cross slope after salvaging ballast, separating muck by screening the salvaged ballast with contractor's 20mm size sieve, stacking of screened ballast for measurement, disposing off muck at specified locations with all lead & lifts as directed by Engineer in- charge. Note: Payment shall be made for quantity of ballast stacked after screening of retrieved ballast from track. Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE-1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance between nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully.
When distance of nearest quarry is more than cum 200 km and up to 250 km DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY 25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track.
For 60 Kg Rail, Single shot crucible fitted with Each Automatic Tapping Thimble , 3 pieces Mould (Zircon washed) and Compressed Air Petrol/LPG pre heating technique
25mm gap 'in-situ' welding during traffic block Each using Railway's welding portion & Welder and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Only welding portion and related accessories as per Annexure - I and Welder shall be supplied by Railways. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY
Spreading of ballast, from existing stacks cum available along formation on top or at cess, in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in-charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface. Linking of BG track (except at LC, Bridges and SEJs) with any type of rail section and sleeper of specified density, on ballast bed spread and compacted with suitable roller, over prepared formation including leading free rails/welded panels available along the alignment on to formation, leading and spreading all fittings and fastenings, spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item.
For sleeper density of 1660 sleepers per km
Linking of track at level crossing locations as TRM per RDSO drawings with any type of rail section and sleeper on prepared formation including leading free rails/welded panels available along the alignment on to formation, spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, excavating level crossing portion as necessary, fixing check rails to running rails, providing C.C blocks, chairs, anti corrosive painting to running rails and check rails, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: Rail cutting and hole drilling, if required, shall be paid separately under relevant item. DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY Shifting / Slewing the existing or newly assembled track of any rail section with any type of sleepers and any density under line block to correct locations & alignment and attending to one round kutcha packing to run safely at 20KMPH speed with all contractors tools and consumables complete and as directed by Engineer in-charge.
Maximum Shifting / Slewing up to 1 metre
Construction of Sanded Dead End as per Each RDSO's Drawing no. RT-347 (with all amendments) with brick-work using country bricks or CC bricks in mud mortar and filling with river coarse sand, surrounding rails and filling around. Note: Cost of brick and sand is not included in the rate. Through packing of track, as per procedure prescribed in latest edition of Indian Railways Permanent Way Manual
For PSC sleeper Track with Sleeper Density of TRM 1540 Sleepers/Km or more First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
For PSC Sleeper Track with Sleeper Density of TRM 1660 Third or subsequent Through Packing of track for all sleeper density including picking of slacks, as required after second through packing, subsequent to Deep Screening work as per procedure prescribed in latest edition of IRPWM. This item can also be used after lifting/regrading/realignment works also. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
For PSC Sleeper Track with Sleeper Density of TRM 1660 Through packing of points and crossings, derailing switches including gauging, fittings recoupment, ballasting as required, elimination of sag and to the required alignment after Deep Screening as per procedure prescribed in latest edition of IRPWM complete as per direction of Engineer- in-charge. Note: This work shall be operated in exceptional cases with written approval at DEN level when UNIMAT is not available and immediate packing is required to pass train over it.
1 in 8½ PSC layout
1 in 12 Derailing Switch DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY
Replacing existing glued joint rail with cut rails Each or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. Anti-corrosive painting of rail outside track on rail bottom, web, foot and fishing plane with two coats of thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM.
For 60 Kg Rails Loading of tongue rail, stock rail, switch assembly and crossings of any section and length, SEJ, Glued joint etc. with / without P.Way fittings and fastenings, in Wagon / Truck / trailer including lead up to 250 metre and lift up to 5 metre.
In wagons during period of traffic block where MT handling by mechanical means is not possible Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic with line protection in case road carriage is not possible with different lead with a lift up to 5 metre during block period.
For lead beyond 500 metre and up to 1 Km. Unloading of rails of any section and length from 13 metre to 39 metre, in neat manner for Railway usage from departmental material train (DMT) including lead up to 50 metre and lift up to 5 metre.
Not involving traffic block or in lines not MT opened to traffic Loading of 52kg / 60kg PSC normal line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
I n Wagon where mechanical handling is MT possible and traffic block is not required or in Truck / trailer DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY Loading of 52kg / 60kg PSC line and special sleepers beyond 2.75 metre length including existing fittings and fastenings in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
I n Wagon/Truck / trailer where mechanical MT handling is possible a n d traffic block is not required. Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres.
For lead beyond 500 metre and up to 1 Km Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1. Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items.
Lead beyond 30 Km and up to 50 km
Lead beyond 50 Km and up to 100 Km Unloading of 52kg / 60kg PSC special sleepers beyond 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 50 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
From Truck / Trailer Spreading of New / SH , normal or wider base PSC sleepers from stack along track on either side for different leads with all lifts by any means.
For a lead up to 500m
Extra to Item no. 172081 for additional lead of Each every 500m or part thereof beyond 500 m Total 22689498.93
Item Breakup - B1-Schedule B1
Jamuna sand, with common burnt clay non modular bricks. DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) 11.3 finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 11.3.1 40 mm thick with 20 mm nominal size stone Sqm 450 614.2 276390 32 aggregate 11.37S CERAMIC GLAZED TILES 11.37 Providing and laying Ceramic glazed floor tiles Sqm 106.8 1096.55 117111.54 of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid 33 on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete. 11.41S VITRIFIED FLOOR TILES Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid 11.41 on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. 34 11.41.2 Size of Tile 600x600 mm Sqm 581.36 1553.45 903113.69 12.0 ROOFING 12.37S RAIN WATER SPOUT AND PIPE Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring 12.41 conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 35 12.41.2 110 mm diameter Metre 120 377.4 45288 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes 12.42 conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. 12.42.3 Single tee with door 36 12.42.3.2 110x110x110 mm Each 20 234.15 4683 12.42.5 Bend 87.5 degree 37 12.42.5.2 110 mm bend Each 40 150.35 6014 DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY 12.50 Providing and fixing precoated galvanised iron Sqm 688.16 738.65 508309.38 profile sheets (size, shape and pitch of corrugation as approved by Engineer-in- charge) of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05 mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have 38 protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 13.0 FINISHING 13.1S CEMENT PLASTER (IN FINE SAND) 13.1 12 mm cement plaster of mix : 39 13.1.1 1:4 (1 cement: 4 fine sand) Sqm 4433.84 347.05 1538764.17 13.16S 6 mm CEMENT PLASTER 13.17 6 mm cement plaster 1:3 (1 cement : 3 fine Sqm 508.92 396.65 201863.12 sand) finished with a floating coat of neat 40 cement and thick coat of Lime wash on top of walls when dry for bearing of R.C.C. slabs and beams. 13.20S PEBBLE DASH PLASTER 13.26 Providing and applying plaster of paris putty of Sqm 2000 262.7 525400 2 mm thickness over plastered surface to 41 prepare the surface even and smooth complete. 13.37S INTERIOR FINISHING Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 13.41 50 gram/litre, of approved manufacturer and of required shade and colour all complete to achieve even shade and colour : 13.41.1 New work (two or more coats) over and Sqm 2000 185.65 371300 including water thinnable priming coat with 42 cement primer having VOC content less than 50 gram/litre 13.44S EXTERIOR FINISHING Finishing with Deluxe Multi surface paint 13.48 system for interiors and exteriors using Primer as per manufacturers specifications : 13.48.1 Two or more coats applied on walls @ 1.25 Sqm 2520 193.7 488124 43 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm Painting with synthetic enamel paint of 13.62 approved brand and manufacture of required colour to give an even shade : 13.62.1 Two or more coats on new work over an under Sqm 138.96 226.25 31439.7 44 coat of suitable shade with ordinary paint of approved brand and manufacture Applying priming coats with primer of 13.85 approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. 13.85.1 With ready mixed pink or grey primer on wood Sqm 70.56 70.35 4963.9 45 work (hard and soft wood) having VOC content less than 50 grams/ litre 16.0 ROAD WORK DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY 16.49S MISCELLANEOUS 16.68 Providing and laying 60mm thick factory made Sqm 768 972 746496 cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, 46 design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. 17.0 SANITARY INSTALLATIONS 17.1S General Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with 17.1 manually controlled device (handle lever) conforming to IS : 7231,with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: 17.1.1 White Vitreous china Orissa pattern W.C. pan Each 12 6767.4 81208.8 47 of size 580x440 mm with integral type foot rests 17.7A Providing and fixing wash basin with C.I. Each 12 3960.55 47526.6 brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, 48 cutting and making good the walls wherever required:-(a) White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 with C.I. brackets and stainless steel plug 40 mm, 17.10 including painting of fittings and brackets, cutting and making good the walls wherever required : 17.10.1 Kitchen sink with drain board 49 17.10.1.1 510x1040 mm bowl depth 250 mm Each 4 6945.6 27782.4 Providing and fixing P.V.C. waste pipe for sink 17.28 or wash basin including P.V.C. waste fittings complete. 17.28.1 Semi rigid pipe 50 17.28.1.1 32 mm dia Each 16 103.9 1662.4 17.31 Providing and fixing 600x450 mm bevelled Each 20 1607.95 32159 edge mirror of superior glass (of approved 51 quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. 17.72 Providing and fixing PTMT towel ring Each 16 231.95 3711.2 trapezoidal shape 215 mm long, 200 mm wide with minimum distances of 37 mm from wall 52 face with concealed fittings arrangement of approved quality and colour, weighing not less than 88 gms. Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP 17.73 brass screws with concealed fittings arrangement of approved quality and colour. 17.73.1 450 mm long towel rail with total length of 495 Each 16 673.4 10774.4 53 mm, 78 mm wide and effective height of 88 mm, weighing not less than 170 gms DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY 17.79 Providing & fixing white vitreous china water Each 12 18088.45 217061.4 less urinal of size 600 x 330 x 315 mm having 54 antibacterial /germs free ceramic surface, fixed with cartridge having debris catcher and hygiene seal. 18.0 WATER SUPPLY 18.7S C.P.V.C. PIPES Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, and all CPVC plain & brass threaded fittings, including fixing the 18.7 pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. ( Internal work - Exposed on wall ) 55 18.7.1 15 mm nominal dia Pipes Metre 100 286.8 28680 56 18.7.3 25 mm nominal dia Pipes Metre 200 401.55 80310 Providing and fixing G.I. pipes complete with 18.12 G.I. fittings including trenching and refilling etc. External work 57 18.12.3 25 mm dia nominal bore Metre 200 467.75 93550 58 18.12.6 50 mm dia nominal bore Metre 100 762.15 76215 18.15S BRASS FITTINGS Providing and fixing brass bib cock of approved 18.15 quality : 59 18.15.1 15 mm nominal bore Each 20 353.25 7065 Providing and fixing brass stop cock of 18.16 approved quality : 60 18.16.1 15 mm nominal bore Each 40 353.25 14130 Providing and fixing gun metal gate valve with 18.17 C.I. wheel of approved quality (screwed end) : 61 18.17.1 25 mm nominal bore Each 20 622.4 12448 62 18.17.4 50 mm nominal bore Each 16 1026.65 16426.4 Providing and fixing ball valve (brass) of 18.18 approved quality, High or low pressure, with plastic floats complete : 63 18.18.1 15 mm nominal bore Each 4 406.85 1627.4 Providing and fixing uplasticised PVC 18.21 connection pipe with brass unions : 18.21.1 30 cm length 64 18.21.1.1 15 mm nominal bore Each 24 85 2040 Providing and fixing C.P. brass shower rose 18.22 with 15 or 20 mm inlet 65 18.22.1 100 mm diameter Each 12 193.95 2327.4 C.I. SLUICE VALVES/ FIRE HYDRANTS & 18.31S FIXTURES Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and 18.46 making long screws etc. complete (New work) : 66 18.46.1 15 mm nominal bore Each 20 318.35 6367 67 18.46.3 25 mm nominal bore Each 16 439.25 7028 18.48 Providing and placing on terrace (at all floor Per 20000 11 220000 levels) polyethylene water storage tank, IS : Litre 12701 marked, with cover and suitable locking 68 arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. 18.49S C.P. BRASS FITTINGS Providing and fixing C.P. brass angle valve for 18.53 basin mixer and geyser points of approved quality conforming to IS:8931 DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY 69 18.53.1 15mm nominal bore Each 24 574.3 13783.2 18.59S AIR VALVE & WATER METER (BULK TYPE) 18.65 Providing and fixing PTMT soap Dish Holder Each 20 111.45 2229 having length of 138mm, breadth 102mm, 70 height of 75mm with concealed fitting arrangements, weighing not less than 106 gms. Providing and fixing PTMT extension nipple for 18.75 water tank pipe, fittings of approved quality and colour. 18.75.2 20 mm nominal bore, weighing not less than Each 4 93.45 373.8 71 40 gms 18.77 Cutting holes up to 15x15 cm in R.C.C. floors Each 40 452 18080 and roofs for passing drain pipe etc. and repairing the hole after insertion of drain pipe 72 etc. with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete so as to make it leak proof. 20.0 PILE WORK 20.1S General Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load 20.3 not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : 73 20.3.3 450 mm dia piles Metre 800 4232.75 3386200 23.0 RAIN WATER HARVESTING & TUBEWELLS 23.1S General Boring/drilling bore well of required dia for casing/ strainer pipe, by suitable method prescribed in IS: 2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore 23.1 log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 metre depth below ground level. 23.1.1 All types of soil 74 23.1.1.1 300 mm dia Metre 300 707.75 212325 Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, 23.3 conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge. 75 23.3.2 150 mm nominal size dia Metre 300 793.25 237975 23.6 Supplying, filling, spreading & leveling gravels cum .21 1538.25 323.03 of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in 76 required thickness, for all leads & lifts, all complete as per direction of Engineer-in- charge. Providing and fixing Bail plug/ Bottom plug of 23.15 required dia to the bottom of pipe assembly of tubewell as per IS:2800 (part I). 77 23.15.2 150 mm dia Each 4 322 1288 Total 40942586.79 DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CorrigenduminGCCforGST.pdf
ATTACHMENT
CorrigenduminGCCforGST1.pdf
ATTACHMENT
GuidelineforSteelReinforcement.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018_1.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
BidSecurityAnnexureVIA.pdf
ATTACHMENT
IRSGCC April 2022
ATTACHMENT
AdvanceCorrectionSlipNo_5ACS-5.pdf
ATTACHMENT
ACS1ofGCC2022.pdf
ATTACHMENT
IMPLEMENTATION OF CONTRACTOR E MB
ATTACHMENT
BidCapacityAnnexureVI_1.pdf
ATTACHMENT
ACS3ofGCC2022.pdf
ATTACHMENT
CorrectionSlipNo_6ACS-6GCC-2022.pdf
ATTACHMENT
acs4.pdf
ATTACHMENT
specialconditionoftrack.pdf
ATTACHMENT
ACS-11.pdf
ATTACHMENT
ACS10.pdf
ATTACHMENT
AnnexureV_1.pdf
ATTACHMENT
LetterregardingAnxV.pdf
ATTACHMENT
ACS9.pdf
ATTACHMENT
ACS8.pdf
ATTACHMENT
ACS 7
ATTACHMENT
ACS 2
ATTACHMENT
TenderDOCTrackMAchineNWD.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
ImplementationofContractore-MeasurementBook.pdf
ATTACHMENT
GeneralConditionGeneralObligationBaseduponGCC-2022Rev..pdf
ATTACHMENT
2022-CE-I-CT-GCC-2022-POLICY-Pt.Idated25.09.2024.pdf
ATTACHMENT
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.2022_1.pdf
ATTACHMENT
Download all tender documents and submit your bid