| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | L1 | Accepted-AOC Work completed | |
| 2 | L2₹7.2 L+₹16,003.04 (2.28%)Rejected-Finance | L2 | Rejected-Finance Other Than Lowest | |
| 3 | L3₹7.4 L+₹35,867.04 (5.11%)Rejected-Finance 178 A HIGHWAY PLAZA SEC 124 SUNNY ENCLAVE MOHALI PUNJAB 140301 | S A S NAGAR | PUNJAB | 140301 | L3 | Rejected-Finance Other Than Lowest | |
| 4 | L4₹7.5 L+₹50,439.84 (7.19%)Rejected-Finance | L4 | Rejected-Finance Other Than Lowest |
Tender Value
₹3.1 L
EMD Value
₹6,300
Closing Date
14 Mar 2022, 11:00 amClosed
Executive Engineer
Executive Engineer Salooni Division HPPWD Salooni
P/F W-metal beam crash barrier at 1/435 to 1/465 and 1/510 to 1/640
2022_PWD_57545_4
EE Salooni letter No. 11017-66 dated 24-02-2022
Open Tender
Civil Works
Item Rate
90 days
Salooni
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
₹6,300
9 Jan 2023
7 Mar 2022
14 Mar 2022
7 Mar 2022
14 Mar 2022
7 Mar 2022
Amount
Earth work in excavation for structures in all depths as per drawing and M.O.R.D.technical specification section 300 and 1600 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, filling of unevenness blind age and finishing the road to specified dimension or as directed by the Enginer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be removed by suitable diversion, bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.The rate is including royality, Malkana,Tol tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete for plain/ cement concrete in open foundation for all type of structure complete using plain cement concrete in open foundation and grade M-10 ( M ten) per cubic metre nominal mix 1:3:6 (one cement is to three sand is to six crushed stone aggregate 40mm(forty millimetre) nominal size) in or under water and curing complete including pumping or bailing out water , dewatering removal of slush as required at site which may arrise at the time of laying concrete complete for all heights/ depths including the cost of form work as per drawings and M.O.R.D. technical specification section 800, 900 and 1200.and to the entire satisfaction and direction of Engineer - in- Charge including hauling /carriage of materials to various location through all modes of transportation in all leads, lifts and other incidental complete in all respect.The rate is including royality, Malkana,Tol tax, sale tax, GST or other taxes imposed by the Government.
Providing and erecting "W" metal beam crash barrier comprising of 3 mm (three millimetre) thick corrugated sheet metal beam rail ,70 cm (seventy centimetre ) above road /ground level and to be fixed on ISMC series channel vertical 150x75x5 mm ( one hundred fifty into seventy five into five millimetre) to be spaced 2Two) metre centre to centre having length of 1.80 m( one point eifht zero metre) high and to be embedded 1.10 m (one point one zero metyre) below ground /road level with 6" (six inches) retro reflective tape on post . All steel parts and fitments to be galvenised by hot dip process. All fitting to confirm to IS: 1367 and IS 1364 metal beam rail to be fixed on the vertical post with a spacer of channel section 150x75x5mm (one hundred fifty into seventy five into five millimetre) and 330 mm (three hundred thirty millimetre) long complete as per clause 811.3 of MORT&H (Ministry of Road Transport & Highway) specification including all fitting required for errection at road site inclusing hauling of materials in all leads and lifts and other incidental or as per entire satisfaction and as per direction of Engineer-in-Charge. The rate is including royality, Malkana,Tol tax, sale tax, GST or other taxes imposed by the Government.
Keso Ram
HIMTECH CONSTRUCTION CO
Darshan Singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .