Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.8 LAdmitted-Fee/PreQual/Technical/Finance | -22.10% | ₹14.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹16.1 L+₹1.3 L (8.72%)Admitted-Fee/PreQual/Technical/Finance | -15.31% | ₹16.1 L+₹1.3 L (8.72%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹16.1 L+₹1.3 L (9.11%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹16.1 L+₹1.3 L (9.11%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19 L
EMD Value
₹38,000
Closing Date
10 Sept 2026, 6:00 pmClosed
EXEN REW SRINAGAR
OFFICE OF THE EXECUTIVE ENGINEER REW SRINAGAR
Development of link road from main road Kaniwan to onwards at Theed B
2026_RDPR_323422_1
ENIT24/REW SGR 2026-27
Open Tender
Civil Works
Percentage
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,200
Rural Development and Panchayati Raj
₹38,000
11 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling dry stone protection work including stacking of serviceable material complete | 18.59 | CUM | 250 | ₹4,647.5 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift up to 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres.All kinds of soil. | 135.3 | CUM | 256.85 | ₹34,751.81 |
| 3 | labour charges for dry stone soling (hand packed) material at site | 18.59 | CUM | 300 | ₹5,577 |
| 4 | Providing and laying of dry stone soling (hand packed) incl. carriage of same by MT 15 Kms. | 21.79 | CUM | 1,105.31 | ₹24,084.7 |
| 5 | P/Laying of Cast-in-Situ Cement Concrete of M7.5 Mix (1:4:8) using 40mm nom. size stone aggregate. | 6.29 | CUM | 5,202.7 | ₹32,724.98 |
| 6 | P/Laying of Cast-in-Situ Cement Concrete of M10 Mix (1:3:6) using 20mm nom. size stone aggregate. | 82.13 | CUM | 5,733.6 | ₹4,70,900.57 |
| 7 | P/Fixing of formwork including removal of same. | 279.51 | SQM | 286.35 | ₹80,037.69 |
| 8 | 12 mm thick plaster in 1:4 mix inc curing. | 287.03 | SQM | 283.8 | ₹81,459.11 |
| 9 | P/Laying of Cast-in-Situ Cement Concrete of M15 Mix (1:2:4) using 20mm nom. size stone aggregate. | 5.03 | CUM | 6,591.25 | ₹33,153.99 |
| 10 | P/fixing of steel in built up sections in angles and flats,including one coat of red oxide and two coats of paint of approved brand and shade. (complete job) | 6,960.12 | KGS | 138.2 | ₹9,61,888.58 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_1088314.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .