Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹27.2 L+₹26,916.53 (1.00%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹27.2 L
EMD Value
₹54,380
Closing Date
13 Jul 2026, 2:00 pmClosed
Xen Jal Shakti Hydraulic Division Kishtwar
Xen Jal Shakti Hydraulic Division Kishtwar
Refer to BOQ
2026_PHE_313141_1
e-NIT 29 of 2026-27 Dated 20-06-2026
Open Tender
Civil Works
Percentage
60 days
Xen Jal Shakti Hydraulic Division Kishtwar
Refer to e-NIT
2 documents required · 2 mandatory
₹600
Yes
Xen Jal Shakti Hydraulic Division Kishtwar
₹54,380
Xen Jal Shakti Hydraulic Division Kishtwar
18 Jul 2026
20 Jun 2026
13 Jul 2026
20 Jun 2026
13 Jul 2026
20 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of G.I/ HDPE Pipes from nearest store to road side of work for an average distance of 280 km by Mechanical Transport | - | MT | - | - |
| 2 | Carriage of G.I/ HDPE pipes from road side to site of work for an avg. distance 1.50 km by Head Load | - | MT | 1 | - |
| 3 | Carriage of G.I Pipes from nearest store to road side of work for an average distance of 280 km by Mechanical Transport (100 mm Dia) | - | m | 0.2 | - |
| 4 | Carriage of G.I pipes from road side to site of work for an avg. distance 03 km by Head Load (100 mm Dia) | - | m | 1 | - |
| 5 | Carriage of G.I pipes from road side to site of work for an avg. distance 07 km by Head Load | - | MT | - | - |
| 6 | Carriage of G.I pipes from road side to site of work for an avg. distance 02 km by Head Load | - | MT | 1 | - |
| 7 | Carriage of G.I pipes from road side to site of work for an avg. distance 03 km by Head Load | 1 | MT | 1 | ₹1 |
| 8 | Carriage of G.I pipes from road side to site of work for an avg. distance 01 km by Head Load | 1 | MT | 1 | ₹1 |
| 9 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil | - | Cum | - | - |
| 10 | Providing and fixing HDPE Pipes complete with G.I. fittings excluding trenching and refilling etc. HDEP PIPE 75 mm | - | m | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_1013347.xls
BOQ • 0.26 MB
Extension29a.pdf
PDF • 0.42 MB
Extension29.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .