Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BUILDING NO 69 30 BAJANAI KOIL STREET VADAPALANI CHENNAI 600 026 | CHENNAI | CHENNAI | TAMIL NADU | 600026 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.9 L
EMD Value
₹5,900
Closing Date
16 Sept 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/VGTPS/RMD
Superintending Engineer, Valuthur Gas Turbine Power Station, Valuthur, Valantharavai (B.P.O) Perungulam Post, Ramanathapuram-623 536.
VGTPS-Phase-II-Periodical and Breakdown Maintenance of Steam Turbine and its auxiliaries for a period of Six months from 01.10.2020 to 31.03.2021.
2020_EB_177967_1
SE/VGTPS/RMD/WC.No.71/2020-21
Open Tender
Miscellaneous Works
Works
180 days
Valuthur, Ramnad
Please refer BQR in tender document
2 documents required · 2 mandatory
₹0
₹5,900
Yes
18 Sept 2020
2 Sept 2020
17 Sept 2020
2 Sept 2020
16 Sept 2020
2 Sept 2020
180 days
Amount
Periodical Maintenance
Walk down and carrying out visual inspection on STG Oil Pump such as Emergency Oil Pumps, jack oil pumps, OVEFS, centrifuge, arresting of oil leaks etc., and carrying out regular maintenance works like external cleaning, checking and topping up of oil level in pumps, MOT through centrifuge, cleaning of cooling water line, cleaning of oil centrifuge, collection of oil leakages if any and topping up through centrifuge, arresting of gland leaks, easing the valve operation etc., wherever necessary, as per the direction of Engineer in- charge.
Walk down and visual inspection of LO cooler, LO filters, Governing system, Emergency stop valves, Control valves and carrying out regular maintenance works like arresting of oil leaks in flanges and valve glands by tightening the glands and replacing of gaskets if required, applying grease wherever necessary, external cleaning of governing system and turbine body and its accessories as per the direction of Engineer – in- charge.
Walk down and visual inspection on surgetank,HP/LP flash tank and STG flash tank, STG waste oil sump pumps, cleaning and keeping the area clean and tidy, attending any defects like manhole leaks, flange leaks etc. by tightening the flanges or by changing the gasket, applying grease to all hand operated valves and easing the operation of the valves as per the direction of Engineer in- charge.
Charges for low pressure welding joints upto 50mm per joint in steam & water lines and support structures by welding including removal of the insulation, re-fixing the insulation after testing the weld by using DPT kit as per the direction of Engineerin-charge.
Walk down and visual inspection of the Steam Turbine and its auxiliaries, HP/IP/LP Bypass station and observe for any gland/bonnet leaks in various valves and rectify the defect by removal of the old gland packing/gasket and replacing new one, lubricating of the valves and easing the valve operation as per the direction of Engineer in- charge.
Charges for startup work in Steam Turbine (ST) and its auxiliaries, maintenance assistance for valve operations and to attend water/steam/oil leak during start up as per the direction of Engineer in-charge.
Walk down and visual inspection of Hot well drain pumps, Gland steam condenser and gland steam exhaust fans and carrying out regular maintenance works like external cleaning,cleaning and replacement of strainers, checking and topping up of oil for bearings, coupling check and attending valve gland leaks, flange leaks etc., as per the direction of Engineer-in-charge.
Cleaning and replacement of strainers and filters in STG lube oil system (Governing system filter, control oil filter and JOP filter) etc., as per the direction of Engineerin-charge.
Charges for welding joints upto 50mm diameter steam/water lines using High Pressure Welder including removal of the insulation, re-fixing the insulation after testing the weld by using DPT kit as per the direction of Engineerin-Charge.
Walk down and visual inspection of CEP's and carrying out regular maintenance work like external cleaning, arresting of gland leaks in the system valves, checking of oil level easing valve operation and replacement of gaskets if any etc., as per direction of Engineer-in-charge.
Walk down and visual inspection of Vacuum pump's includes ACW pump cooling towers and connected line etc., and carrying out regular maintenance works like external of cooling water line arresting of gland leaks etc., wherever necessary per the direction of Engineerin-charge.
BREAKDOWN MAINTENANCE
STG Lube oil pumps Charges for decoupling, dismantling of the pump assembly, checking of mechanical seal, bearings and replacement if necessary, replacement of casing/impeller wear ring, shaft protection sleeve, impeller and oil labyrinth, cleaning of suction strainer, assembling of the pump, alignment of the pump with motor and coupling, as per the direction of Engineer in – charge.
Jack Oil Pump Charges for decoupling, dismantling of the pump assembly, inspection of bearings, oil seals and screws etc., servicing of pressure regulating valve, replacement of the worn-out or damaged parts, if necessary and alignment and coupling of the pump with motor after works as per direction of Engineerin-charge.
Hotwell drain pumps. Charges for decoupling, dismantling of the pump assembly, checking of mechanical seal, bearings and replacement if necessary, replacement of casing/impeller wear ring, shaft protection sleeve, impeller and oil labyrinth cleaning of suction strainer, assembling of the pump, alignment of the pump with motor and coupling, as per the direction of Engineer in-charge.
ACW Pumps of Vacuum system Charges for decoupling, dismantling of the pump assembly, checking of mechanical seal, bearings and replacement if necessary, replacement of casing/impeller wear ring,shaft protection sleeve, impeller and oil labyrinth cleaning of suction strainer, assembling of the pump, alignment of the pump with motor and coupling as per the direction of Engineerin-charge.
MOT Vapour Extraction Fans/Gland steam cooler Vapour Extraction Fans Charges for overhauling/motor replacement of MOT Oil Vapour Extraction fans, Gland steam cooler vapour extraction fans, including replacement of impeller, seals, shaft, shaft sleeve, bearings etc., if necessary as per the direction of Engineerin-charge.
LPT atmospheric relief diaphragm renewal Charges for removal of LPT atmospheric relief diaphragm assembly from LP casing of the steam turbine, dismantling the diaphragm, replacement of lead sheet and gaskets, reassembly and installation, as per the direction of Engineerin-charge.
STG Turning Gear Manual Operation During Failure Engaging gear teeth manually, rotating the hand wheel for STG manual rotor rotation during STG Turning gear failure period, Resuming auto operation of STG Turning gear as per the direction of Engineer-in-charge.
Overhauling of MOV/Hand operated valves and NRVs upto 40 - 50 mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge.
Overhauling of MOV/Hand operated valves and NRVs upto 80 - 100 mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge.
Overhauling of MOV/Hand operated valves and NRVs upto 125 - 150 mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge.
Overhauling of MOV/Hand operated valves and NRVs upto 200 - 250 mm size : Charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat, valve globe/gate and blue matching, assembling of valve, renewal of gland packing, assembling actuator if any, providing insulation, checking of valve operation and completing the work etc., as per the direction of Engineer-in-charge.
Overhauling of Pneumatic Operated Flow Control/Temperature Control/HP Spray Control/Drain Valves: charges for disassembling actuator if any, removal of insulation, disassembling valve completely, overhauling of valves including inspection, cleaning of all parts, rectification of minor defects, lapping of valve seat,valve globe/gate and blue matching,assembling of valve,renewal of gland packing,assembling actuator if any,providing insulation,checking of valve operation and completing the work, as per the direction of Engineer-in-charge.
CEP's: Charges for decoupling dismantling of pump coupling assembly, checking of mechanical seal, bearings and replacement if any, assembling, alignment of the pump with motorand coupling, as per the direction of Engineer-in charge.
STG waste oil sump pump: Charges for removing the motor, dismantling of the pump assembly, checking of gland packings, bearings and replacement if necessary, replacement of casing/impeller wear ring, shaft protection sleeve impeller and oil labyrinth cleaning of suction strainer, assemblingof the pump, alignment of the pump with motor and coupling, as per the direction of Engineer-in-charge.
STG Lube Oil Duplex Filter Cleaning Charges for cleaning and replacement of filter elements in STG lube oil duplex filters, which includes changing over the running filter, drain the lube oil through centrifuge, removal of flange connection in vent line, removal of bolt and opening the top cover, removal of filter elements, cleaning with diesel and air fixing the same or replace the filter elements, closing the top cover, tightening the bolt, slowly charging the filter via charging valve and normalizing the filter etc., as per the direction of Engineer-in-charge.
PLATE HEAT EXCHANGER for Lube Oil System Charges for dismantling the plate heat exchanger assembly in lube oil system, for attending any water leakage, removal of plateheat exchanger plates & cleaning the plates, inspection of rubber gaskets, replacing the new gasket if required, again re assembling the plate heat exchanger as per the direction of Engineer in - charge .
BHARATHI ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .