Loading…
Loading…
Tender Value
₹6.4 Cr
EMD Value
₹4.7 L
Closing Date
25 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
S AND T
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or " V" whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any of the following during last 07(seven) years, ending last day of month previous to the one in which tender is invited: Three similar works costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works costing not less than the amount equal to 40% of advertised value of the tender, or One similar work costing not less than the amount equal to 60% of advertised value of the tender. Similar Nature of Work for this tender is " Any work of supply and installation of train indication board / coach guidance system/PA system / Clock/IPIS/Touch Screen enquiry system/Display board."
4 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Two years warranty will be started after successful completion of the work and physical cabling work must be completed before hanging of TIB/CIB units.
SCH A-Replacement of IPIS system at Bansberia, Tribeni, Jirat, Guptipara, (4 STN) in suburban sections over Howrah division. SCH B-Replacement of IPIS system at Adisaptagram, Pandooah, Memari, Shaktigarh (4 STN) in suburban sections over Howrah division.
SDSTE-ETN-IPIS-BSAE-SKG
SDSTE-ETN-IPIS-BSAE-SKG
Open
Works - General
9 Months
Howrah, West Bengal
₹0
₹4.7 L
25 Mar 2026
2 Mar 2026
11 Mar 2026
396 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,83,38,359.31 | ||
| — | 4.00 | — | — | ||
| "Supply of Central Data Controller connected through a Central Data Switch with all relevant software & Driving Software for IPIS system as per RDSO Spec. No: RDSO / SPN / TC / 108 / 2019, Ver 1.0 or latest. with RMS server Inspection: By RDSO." | — | — | — | 12,73,823.12 | |
| — | 4.00 | — | — | ||
| Installation and Commissioning of Central Data Controller. | — | — | — | 39,499.28 | |
| — | 8.00 | — | — | ||
| "Supply of SFP Small form-factor pluggable transceiver Module FOR SWITCH OF CENTRAL DATA COMMUNICATION HUB, Specification as per Annexure. INSPECTION : CONSIGNEE." | — | — | — | 33,342.32 | |
| — | 16.00 | — | — | ||
| "a) Supply of Platform Data Controller as per RDSO Spec. No: RDSO / SPN / TC / 108 / 2019, Ver 1.0 or latest. Inspection: By RDSO." | — | — | — | 6,63,106.72 | |
| — | 16.00 | — | — | ||
| Installation, testing and Commissioning of Platform Data Controller along with all accessories, Mechanical fittings etc. | — | — | — | 44,576.96 | |
| — | 24.00 | — | — | ||
| "Supply of Singile line Double face train Arrival/Departure Platform Display Board as per RDSO SPEC. No. RDSO/SPN/TC/108/2019, Ver 1.0 or Latest Inspection: By RDSO." | — | — | — | 46,81,362.72 | |
| — | 24.00 | — | — | ||
| "Installation of Singile line Double face train Arrival/Departure Platform Display Board as per RDSO SPEC. No. RDSO/SPN/TC/108/2019, Ver 0.0with Amd 1 or Latest " | — | — | — | 2,67,314.64 | |
| — | 4.00 | — | — | ||
| Supply of THREE Line Single Face Train Arrival / Departaure Display Board, as per RDSO Spec. No: RDSO / SPN / TC / 108 / 2019, Ver 1.0 or latest Inspection: By RDSO. | — | — | — | 8,23,403.8 | |
| — | 4.00 | — | — | ||
| Installation, testing and commissioningof THREE Line Single Face Train Arrival / Departaure Display Board, as per RDSO Spec. No: RDSO / SPN / TC / 108 / 2019, Ver 1.0 or latest | — | — | — | 50,370 | |
| — | 16.00 | — | — | ||
| "Supply, Installation, testing and Commissioning of Platform dual face, 4 digit, GPS synchronised digital clock as per RDSO spec. RDSO/SPN/TC@47>47@2008 Rev. 3, Amndt- 1 and Amndt.-2 or latest, with LED of Blue/Red/White colour and size approximately 762 x 381 x 228 mm It also includes all fitting arrangements. (Colour to be decided by Railways).Inspection: (i) RDSO/RITES if value of item in work more than 5 lakhs or as per extant policy. " | — | — | — | 7,41,440 | |
| — | 8.00 | — | — | ||
| "Supply of basic material to construct unit maintenance free earth as per RDSO Specs. No RDSO/SPN/197 Ver.1.0 or latest and conforming to RDSO Drg. No. SDO / RDSO/ E&B/001 or Latest. Necessary testing certificate of UL ,IEC to be produced. It consist of following: (a) Copper bonded steel electrode of 3.0 m long, 17.2 mm dia with copper bonding thickness of minimum macrons and UL listed and marked = 1 no. (b) Earth enhancement material supplied in sealed bags of minimum 10 kg = 3 nos. © Copper strip of 150x25x6 mm, to terminate earth rod = 1 no. (d) Copper strip of 300x25x6 mm (MEEB) = 1 no. (e) Copper strip of 150x25x6mm (SEEB) = 1 no. (ii) Supply of 35 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting main earth electrode to MEEB in the equipment room in duplicate.(minimum 10 meter) (iii) Supply of 16 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting MEEB to SEEB and SPD to MEEB (minimum 10 meter ) (iv) Supply of 10 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting various equipments to SEEB (v) Supply of copper lug sleeve for 3/16 cable Inspection: (i) RDSO/RITES if value of item in work more than 5 lakhs (ii) Consignee if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board.. " | — | — | — | 1,21,176 | |
| — | 8.00 | — | — | ||
| "Installation of Unit Maintenance Free Earth as supplied in above item.It includes ( i ) Digging the earth to the required depth. (ii) Insertion of electrode. (iii) Filling of earth enhancing compound (Approx.30 Kg) (iv) Provision of exothermic weld connections to copper tape of 25 mm x 6 mm x 150 mm to the earth electrodes. All material tools and features required for weld will be arranged by contractor. (v) This also includes CC cover 1.5 ft x 1.5 ft. 1 ft wall thickness 2 inch with cover 3 inch thickness. Cables 35 Sq mm/ 16 Sq mm/10 sq mm for connecting earth to busbar, busbar to busbar and busbars to various equipments. Earth electrode of 17.20 mm dia and 3.00 meter long high tensile low carbon steel circular rods molecularly bonded with copper and outer surface (minimum copper bonding thickness of 250 micrones to made requirement of under writer's laboratories (UL) 467-2007 or latest. Copper strips of 150 mm x 25 mm x 6 mm to be welded with each earth electrode, copper strips of 300 mm x 25 mm x 6 mm for main equip- potential busbar, copper strips of 150 mm x 25 mm x 6 mm sub equip-potential busbar in relay room, power room and panel room. GI strip 25 mm x 2 mm for ring formation of earth pits Earth enhancement material in bags for each Earth Electrode. Inspection chamber of site 300 mm x 300 mm x 300 mm (Inside dimension) of approximate 50 mm thick with pulling hooks to cover the earth pits. Note: The installation of this item shall be carried out by the contractor as per RDSO Specs. No RDSO/SPN/197 Ver.1.0 or latest and conforming to RDSO Drg. No. SDO / RDSO/ E&B/001 or Latest. Inspection: Consignee " | — | — | — | 52,632 | |
| — | 240.00 | — | — | ||
| "Supply of 1 x 10 Sq.mm. (Red/Black/Green) multi strand copper power wire as per IS: 694:2010 or latest, 140 conductor each dia 0.30mm +/- 0.01 with insulation thickness of 1.0 mm and nominal conductor resistance of 1.91 ohms/km and test parameters as per RDSO Specn.No.IRS:S- 76/89(Amnd.3) or latest. Color of the wire which is required will be specified by the Engineer in-charge. Inspection: Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board." | — | — | — | 28,560 | |
| — | 240.00 | — | — | ||
| "Supply of 1 x 16 Sq.mm. (Red/Black/Green) multi strand copper power wire as per IS: 694:2010 or latest, 126 conductor each dia 0.40mm +/- 0.01 with insulation thickness of 1.0 mm and nominal conductor resistance of 1.21 ohms/km and test parameters as per RDSO Specn.No.IRS:S- 76/89(Amnd.3) or latest. Color of the wire which is required will be specified by the Engineer incharge. Inspection: Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board." | — | — | — | 31,440 | |
| — | 240.00 | — | — | ||
| "Supply of 1 x 35 Sq.mm. (Red/Black/Green) multi strand copper power wire as per IS: 694:2010 or latest, 276 conductor each dia 0.40mm +/- 0.01 with insulation thickness of 1.2 mm and nominal conductor resistance of 0.554 ohms/km and test parameters as per RDSO Specn.No.IRS: S- 76/89(Amnd.3) or latest. Color of the wire which is required will be specified by the Engineer in charge. Inspection: Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board." | — | — | — | 42,480 | |
| — | 400.00 | — | — | ||
| "Supply & laying of 25x3 mm pure electrolytic copper tape through suitable CLASS-'B' GI pipe for loop Earthing and bonding as per site requirement. Supply material inspection by consignee." | — | — | — | 5,50,800 | |
| — | 14000.00 | — | — | ||
| "Supply of Power Cable 3 X 4 SQ. MM unarmoured as per IS-694 . PVC insulated flexible 3 core x 4 sq. mm multistrand power cable provided for display boards shall conform to specification no IS694: 1990 reaffirmed 1995 or latest of reputed brand. Inspection: (i) RDSO/RITES if value of item in work more than 5 lakhs (ii) Consignee if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board. | — | — | — | 34,86,000 | |
| — | 400.00 | — | — | ||
| "Supply of Medium class GI pipes 50 mm dia(3.6 mm thickness) as per IS 1239 ( Part 1 ) : 2004 for use in ASM room and at any other location as decided by Site Engineer. It includes supply of all material required for fixing arrangement. At the ends of GI pipe, flexible/corrugated HDPE pipe will be provided by contractor to protect cables from sharp edges and sudden bends. Inspection: Consignee " | — | — | — | 1,61,600 | |
| — | 400.00 | — | — | ||
| "Laying & Fixing of Medium class GI pipes 50/100 mm dia(4.5 mm thickness) as per IS 1239 ( Part 1 ) : 2004 with socket & coupling on culverts bridges or at any other locations as decided by Site Engineer. It includes installation of all material required for fixing arrangement. Contractor will install flexible/corrugated HDPE pipe at the end of GI pipe along with any masonry work(if required) to protect the cables from sharp edges and sudden bends. Inspection: Consignee " | — | — | — | 39,200 | |
| — | 10000.00 | — | — | ||
| "Supply of 40 mm dia permanently lubricated HDPE telecom: ducts (with chord) as per RDSO SPEC.NO. RDSO/SPN/TC/45/2013 REVISION 2.0 with latest amendments or Latest in length of 1000 mtrs/roll For each km. Of HDPE duct following items are to be supplied (a) end plugs-2 nos. (b) cable sealing plugs - 2 nos. (c) plastic couplers slip fit/push fit type-2 nos. (d) end plugs to be provided along with drum 2 nos. Inspection: (i) RDSO/RITES if value of item in work more than 5 lakhs or as per extant policy " | — | — | — | 6,28,700 | |
| — | 10000.00 | — | — | ||
| "Laying of HDPE pipe duct, 40/33 mm in trenches and protective works including pulling of mono-mode armoured OFC cable (24 fibres) through duct in trenches and as advised by site engineer.Note:- (1) the contractor will take over the OFC cable from railway store to site of work duly checked the continuity of each fibre from end to end . (2) before & after laying of optical fibre cable through duct, continuity test from end to end of each fibre to be made by the contractor to ensure availability of all 24 fibre duly certified by the site engineer. " | — | — | — | 2,47,300 | |
| — | 36.00 | — | — | ||
| "Digging of trench 1.2 Mtrs. deep from rail flange/ road level and 0.3 Mtrs to 0.6 Mtrs wide and back filling after placing of DWC/ RCC/GI pipe. (Placing of DWC/RCC/GI pipe covered separately). The ballast disturbed be screened and dressed as required by Engineer-in-charge or his representatives and road tarred immediately. For track crossing, RDSO sketch No. SDO/CABLE LAYING/009 or latest and for Road Crossing, RDSO sketch No. SDO/CABLE LAYING/010 or latest are to be followed." | — | — | — | 10,008 | |
| — | 4800.00 | — | — | ||
| Cuting of the Platform surface (Tile/Slab/Mastic Pad/Concrete) as per requirement of the site and refilling/ reconditioning/ concreating/ repairing the platform after laying of GI Pipe/ HDPE Pipe/ Cable depth of cutting should not be less than 6" where possible. | — | — | — | 7,69,248 | |
| — | 8.00 | — | — | ||
| "Supply of 1KVA Online UPS with half an hour backup. Specification as per Annexure INSPECTION : CONSIGNEE. " | — | — | — | 97,984.08 | |
| — | 12.00 | — | — | ||
| "Supply, Installation and commissining of 230V AC/3 KVA UPS (hot stand by) system isolation transformer at input, SMF battery, battery rack as per Annexure, INSPECTION : RITES Note: Manufacturing date of UPS & battery set should be of current year at the time of supply to railway stores, UPS to be covered under 3 years warrenty of manufacturer." | — | — | — | 15,70,848 | |
| — | 8.00 | — | — | ||
| "Supply and installation of lightning and surge protection device both Class 'B' & Class 'C' between line and neutral and neutral & earth of approved type. Inspection (i) RDSO/RITES if value of item in work more than 5 lakhs (ii) Consignee if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board. | — | — | — | 1,95,592 | |
| — | 48.00 | — | — | ||
| Supply and Installation of Media converter of as per Annexure. Inspection: (i) RDSO/RITES if value of item in work more than 5 lakhs (ii) Consignee if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board.. | — | — | — | 5,55,331.2 | |
| — | 10000.00 | — | — | ||
| Supply of 12 Fiber core armoured single mode Optic Fiber Cable , Specification as per annexure. Inspection RITES. | — | — | — | 6,43,400 | |
| — | 20.00 | — | — | ||
| Supply and Installation of 19"rack mouted 24 port Fiber management system and termination of OFC and Splicing of all the Fibers inside the Terminal Box with provision of taking out OFC as required. This includes supply of all Installation accessories including the pigtail swith connector as per order of practice for installation and commissioning of Optical Fiber System. INSPECTION :CONSIGNEE | — | — | — | 1,63,522.6 | |
| — | 4.00 | — | — | ||
| Laying of all types of cable through HDPE pipe | — | — | — | 212.16 | |
| — | 120.00 | — | — | ||
| Supply of Armoured SC-PC/ SC-LC/ FC-LC ( or as per requirement) Fibre Patch Cord as per Annexure. INSPECTION CONSIGNEE. | — | — | — | 2,05,320 | |
| — | 6100.00 | — | — | ||
| Supply of STP CAT-6 Cable (305 meter Box).As per Annexure. INSPECTION : CONSIGNEE. | — | — | — | 3,47,090 | |
| — | 30600.00 | — | — | ||
| Laying of UTP CAT 6 / OFC / Power Cable/SB/LS Cable through PVC Conduit/ polythene pipe. All fixing accessories shall be supplied by the contracrot and this also includes transportation of cable conduit to the site. | — | — | — | 5,81,400 | |
| — | 900.00 | — | — | ||
| Supply of RJ45 Connector (1 box of 100 nos) Specification as per Annexure INSPECTION : CONSIGNEE. | — | — | — | 8,631 | |
| — | 1200.00 | — | — | ||
| Supply of 25 mm PVC conduit pipe as per ISI grade. INSPECTION CONSIGNEE. | — | — | — | 37,524 | |
| — | 56.00 | — | — | ||
| "Supply of 30 watts Horn speaker with 30 watt tapping, matching transformer and driver unit, As per Annexure. Inspection Consignee" | — | — | — | 1,69,212.96 | |
| — | 56.00 | — | — | ||
| Installation of Horn type Loud speaker. | — | — | — | 48,181.28 | |
| — | 24.00 | — | — | ||
| "Supply and Installation of column Speaker 15 W with LMT all metal weather resistant, including fixtures and other material required. Inspection Consignee" | — | — | — | 36,672 | |
| — | 16.00 | — | — | ||
| Supply of Microphone with stand, Specification as per Annexure. Make : Ahuja Inspection Consignee | — | — | — | 1,02,470.56 | |
| — | 8.00 | — | — | ||
| Supply, Installation Commissioning of 350 Watt Amplifier, As per Annexure. Inspection Consignee | — | — | — | 1,61,908.08 | |
| — | 10500.00 | — | — | ||
| "Supply of LS cable. 2 Core 1.5 Sq.mm Steel Wire Armoured screened Anneled Tinned Copper (ATC) cable . Speaker External Cable, ISO Standard. Inspection: (i) RDSO/RITES if value of item in work more than 5 lakhs (ii) Consignee if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board. | — | — | — | 4,49,820 | |
| — | 40.00 | — | — | ||
| Supply and installation of independent Iron Structure post including water proof protection arrangement with canopy for Horn unit at platform are including painting and erection. Inspection- CONSIGNEE | — | — | — | 1,08,872 | |
| — | 12.00 | — | — | ||
| Supply and installation of Wall mounted 19",6U closed Steel Rack in 600X500mm Section with fan and 6 no sockets and accessories. Make: HCL, VALRACK & APW or Similar. INSPECTION : CONSIGNEE. | — | — | — | 53,862.24 | |
| — | 32.00 | — | — | ||
| "Supply of Power Extension box, as per annexure INSPECTION : CONSIGNEE. " | — | — | — | 41,966.08 | |
| — | 16.00 | — | — | ||
| Supply and installation of Wall mounted 19",9U closed Steel Rack in 600X500mm Section with fan and 6 no sockets and accessories. Make: HCL, VALRACK & APW or Similar. INSPECTION : CONSIGNEE. | — | — | — | 1,37,755.2 | |
| — | 8.00 | — | — | ||
| "Supply, installation and complete indoor wiring of 19 inch (42U) covered Rack of size 2035 mm x 600 mm x 600 mm (Approx.). The rack shall be complete with all fittings for housing SDH equipment, Primary MUXES, DDF, MDF using crone modules and other equipment like runway ladders etc. completely wired and equipped with integrated protection modules for all channels as per technical specifications and other stipulations of tender document. It should be possible to lock all the equipment with only order wire telephone remaining outside the rack. Inspection: Consignee" | — | — | — | 3,00,560 | |
| — | 8.00 | — | — | ||
| "Supply and Installation of Wi-Fi Router, WAN Non PoE Ethernet LAN PORT Router (For NTES Connection of IPIS) Inspection: Consignee" | — | — | — | 1,76,000 | |
| — | 16.00 | — | — | ||
| Supply and installation of 4 port Lan extender (For NTES Connection of IPIS) as per Tech Spec.: Inspection: (i) RDSO/RITES if value of item in work more than 5 lakhs (ii) Consignee if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board. | — | — | — | 5,02,520.16 | |
| — | 24.00 | — | — | ||
| "Supply & installation of E1 to Ethernet converter specification as per Annexure. INSPECTION : RITES" | — | — | — | 7,81,940.16 | |
| — | 8.00 | — | — | ||
| "Supply of 24 Ports Un Managed Non PoE Layer 2 Access Switch, .Inspection: Consignee" | — | — | — | 1,18,800 | |
| — | 40.00 | — | — | ||
| Supply and Installation of Double pole MCB 32 A, .Inspection: Consignee | — | — | — | 26,800 | |
| — | 8.00 | — | — | ||
| "Supply and Installation of Double pole Residual Current Operated Circuit -Breakers , (RCCB, 40A, 415V, 30mA, REINS), .Inspection: Consignee" | — | — | — | 12,600 | |
| — | 20.00 | — | — | ||
| Supply and Installation of of single pole MCB 10A, .Inspection: Consignee | — | — | — | 4,640 | |
| — | 20.00 | — | — | ||
| Supply and Installation of of single pole MCB 16A, .Inspection: Consignee | — | — | — | 6,200 | |
| — | 8.00 | — | — | ||
| Supply and Installation of 16 channel MCB BOX, .Inspection: Consignee | — | — | — | 27,704 | |
| — | 8.00 | — | — | ||
| "Supply of Power Supply for Wireless Application, DC Output Current 15 Amps, Inspection: Consignee " | — | — | — | 37,936 | |
| — | 4.00 | — | — | ||
| Supply & transportation of Aluminium Self supporting Platform step ladder (7 Foot) for site maintenance, Capacity 120 kilogram, Inspection: Consignee | — | — | — | 33,600 | |
| — | 3.00 | — | — | ||
| Supply & transportation of Aluminium Sellf supporting Platform step ladder (12 Foot) for site maintenance, Capacity 120 kilogram, Inspection: Consignee | — | — | — | 71,877 | |
| — | 4.00 | — | — | ||
| "Supply of Office table with laminated top with three drawers on left hand side and one locker on the right-hand side. Olive brown with duplicate keys. Make: Godrej Model T-9 (136.5 cmX68cmX 75cm) or Similar of reputed brand. Inspection: Consignee" | — | — | — | 51,544 | |
| — | 12.00 | — | — | ||
| "Supply of Office Chair make Godrej CH-7B or similar of reputed brand. Inspection: Consignee" | — | — | — | 34,824 | |
| — | 100.00 | — | — | ||
| "Supply of SITEL PRIMARY Cell (Dry, Leclanche) - 1.5 V shall not be less than 45 AH as per Specification IRS:S- 95/96 Amd. - 1, Inspection: Consignee" | — | — | — | 65,372 | |
| — | 33.00 | — | — | ||
| "Supply of CLI ABS push button Telephone instrument as per annexure Inspection: Consignee" | — | — | — | 44,378.07 | |
| — | 32.00 | — | — | ||
| Supply and Installation of SingleFace RJ45 Input/Output Box. (Asper Annexure) Make- MOLEX/DAX/D-LINK or similar.INSPECTION : CONSIGNEE." | — | — | — | 10,945.92 | |
| — | 4.00 | — | — | ||
| Supply and site Installationof of " DUAL HANDHELD WIRELESS MICROPHONE As per Annexure.Inspection- Consignee | — | — | — | 1,22,447.72 | |
| — | 4.00 | — | — | ||
| "Supply and Installation of Portable 2 way PA system Speaker with Two Wireless Microphones System, Portable Party Speakers with Mic Bass/Treble, Sound Box with Remote Control, Make ahuja or similar, Inspection: Consignee" | — | — | — | 78,000 | |
| — | 4.00 | — | — | ||
| Supply and installation of customised amplifier rack for holding 350/500 watt amplifier, Inspection: Consignee | — | — | — | 83,368.64 | |
| — | 4.00 | — | — | ||
| Supply of Visual Fault Locator, Inspection: Consignee | — | — | — | 27,563.88 | |
| — | 4.00 | — | — | ||
| Supply of Network Lan Tester, Inspection: Consignee | — | — | — | 6,000 | |
| — | 40.00 | — | — | ||
| Supply and installation of 12 V 80 AH Battery, Inspection: Consignee | — | — | — | 2,32,000 | |
| — | 40.00 | — | — | ||
| supply of SMPS Based Charger for 12 Volt Battery, Inspection: Consignee | — | — | — | 3,04,000 | |
| — | 4.00 | — | — | ||
| Supply and installation of 2 Mbps SHDSL Modem as per Annexure. INSPECTION : CONSIGNEE. | — | — | — | 76,817.6 | |
| — | 4.00 | — | — | ||
| "Comprehensive AnnualMaintenance Contract (CAMC) Will be start after expiry of warranty period. Comprehensive Annual Maintenance Contract (CAMC) of CDC for 1st Year." | — | — | — | 1,37,737.64 | |
| — | 16.00 | — | — | ||
| "Comprehensive AnnualMaintenance Contract (CAMC) Will be start after expiry of warranty period. Comprehensive Annual Maintenance Contract (CAMC) of PDC for 1st Year." | — | — | — | 58,336 | |
| — | 24.00 | — | — | ||
| "Comprehensive AnnualMaintenance Contract (CAMC) Will be start after expiry of warranty period. Comprehensive Annual Maintenance Contract (CAMC) of SLDB for 1st Year." | — | — | — | 4,37,519.52 | |
| — | 4.00 | — | — | ||
| "Comprehensive AnnualMaintenance Contract (CAMC) Will be start after expiry of warranty period. Comprehensive Annual Maintenance Contract (CAMC) of Two/Three Line Single Face DB for 1st Year." | — | — | — | 89,124.36 | |
| — | 4.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of CDC for 2nd Year. | — | — | — | 1,40,637.4 | |
| — | 16.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of PDC for 2nd Year. | — | — | — | 59,564 | |
| — | 24.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of SLDB for 2nd Year. | — | — | — | 4,46,730.48 | |
| — | 4.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of Two/Three Line Single Face DB for 2nd Year. | — | — | — | 91,000.64 | |
| — | 4.00 | — | — | ||
| Comprehensive Annualn Maintenance Contract (CAMC) of CDC for 3rd Year. | — | — | — | 1,43,537.12 | |
| — | 16.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of PDC for 3rd Year. | — | — | — | 60,792.16 | |
| — | 24.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of SLDB for 3rd Year. | — | — | — | 4,55,941.44 | |
| — | 4.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of Two/Three Line Single Face DB for 3rd Year. | — | — | — | 92,876.96 | |
| — | 4.00 | — | — | ||
| Comprehensive Annualn Maintenance Contract (CAMC) of CDC for 4th Year. | — | — | — | 1,47,886.72 | |
| — | 16.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of PDC for 4th Year. | — | — | — | 62,634.4 | |
| — | 24.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of SLDB for 4th Year. | — | — | — | 4,69,757.76 | |
| — | 4.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of Two/Three Line Single Face DB for 4th Year. | — | — | — | 95,691.4 | |
| — | 4.00 | — | — | ||
| Comprehensive Annualn Maintenance Contract (CAMC) of CDC for 5th Year. | — | — | — | 1,50,786.48 | |
| — | 16.00 | — | — | ||
| — | 24.00 | — | — | ||
| — | 4.00 | — | — | ||
| — | — | — | 97,567.72 | ||
| — | 4.00 | — | — | ||
| — | — | — | 1,55,136.08 | ||
| — | 16.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of PDC for 6th Year. | — | — | — | 65,704.16 | |
| — | 24.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of SLDB for 6th Year. | — | — | — | 4,92,785.28 | |
| — | 4.00 | — | — | ||
| Comprehensive Annual Maintenance Contract (CAMC) of Two/Three Line Single Face DB for 6th Year. | — | — | — | 1,00,382.16 | |
| — | — | — | 3,51,95,851.6 | ||
| — | 4.00 | — | — | ||
| "Supply of Central Data Controller connected through a Central Data Switch with all relevant software & Driving Software for IPIS system as per RDSO Spec. No: RDSO / SPN / TC / 108 / 2019, Ver 1.0 or latest. with RMS server Inspection: By RDSO." | — | — | — | 12,73,823.12 | |
| — | 4.00 | — | — | ||
| "Installation and Commissioning of Central Data Controller. [The work also includes integration and upgradation of old version TIBs having RDSO specification RDSO/SPN/TC 61/2015 Version 4.0, Make EEC to new version RDSO Spec. No: RDSO / SPN / TC / 108 / 2019, Ver 1.0 or latest. for Adisaptagram Station only]" | — | — | — | 39,499.28 | |
| — | 4.00 | — | — | ||
| "Supply of SFP Small form-factor pluggable transceiver Module FOR SWITCH OF CENTRAL DATA COMMUNICATION HUB, Specification as per Annexure. INSPECTION : CONSIGNEE." | — | — | — | 16,671.16 | |
| — | 20.00 | — | — | ||
| "a) Supply of Platform Data Controller as per RDSO Spec. No: RDSO / SPN / TC / 108 / 2019, Ver 1.0 or latest. Inspection: By RDSO." | — | — | — | 8,28,883.4 | |
| — | 20.00 | — | — | ||
| Installation, testing and Commissioning of Platform Data Controller along with all accessories, Mechanical fittings etc. | — | — | — | 55,721.2 | |
| — | 40.00 | — | — | ||
| "Supply of Singile line Double face train Arrival/Departure Platform Display Board as per RDSO SPEC. No. RDSO/SPN/TC/108/2019, Ver 1.0 or Latest Inspection: By RDSO." | — | — | — | 78,02,271.2 | |
| — | 40.00 | — | — | ||
| "Installation of Singile line Double face train Arrival/Departure Platform Display Board as per RDSO SPEC. No. RDSO/SPN/TC/108/2019, Ver 1.0 or Latest Inspection: By RDSO." | — | — | — | 4,45,524.4 | |
| — | 4.00 | — | — | ||
| Supply of TWO Line Single Face Train Arrival / Departaure Display Board, as per RDSO Spec. No: RDSO / SPN / TC / 108 / 2019, Ver 1.0 or latest Inspection: By RDSO. | — | — | — | 6,78,655.32 | |
| — | 4.00 | — | — | ||
| Installation, testing and commissioningof TWO Line Single Face Train Arrival / Departaure Display Board, as per RDSO Spec. No: RDSO / SPN / TC / 108 / 2019, Ver 1.0 or latest Inspection: By RDSO. | — | — | — | 63,374.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CheckListAnnexItoVIIIUPDATED_1.pdf
ATTACHMENT
AnnexureIX.pdf
ATTACHMENT
Annexure-X.pdf
ATTACHMENT
Annexure-XI_1.pdf
ATTACHMENT
AnnexureV.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
Annexure-VIA.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
GCC-2022-Updated-25.09.24.pdf
ATTACHMENT
VICINITYOFUNDERGROUNDCABLE-
ATTACHMENT
TermsofPayment.pdf
ATTACHMENT
LabourCessAddendumCorrigendumslipno.4.pdf Labour Cess
ATTACHMENT
GCCwithCorrectionSlips1to10.pdf
ATTACHMENT
Updatedtenderdocument_15ABC.pdf
ATTACHMENT
MaintenanceSchedule1.pdf
ATTACHMENT
AnnxADST_BSAETIB.pdf
ATTACHMENT
JPO-CABLEDIGGINGWORK-VICINITYOFUNDERGROUNDCABLE-SRDSTESRDEN-C-240124.pdf
ATTACHMENT
LabourCessAddendumCorrigendumslipno.4.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .