Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹3.9 Laccepted-aoc | ₹3.9 L | accepted-aoc |
Tender Value
₹5.1 L
EMD Value
₹12,650
Closing Date
17 Feb 2026, 10:40 pmClosed
Public Works Department
REPAIRS TO BRIDGE AT Ch.72.30KM,74.90KM AND 75.30KM ON SH305 HARADANAHALLI CHANNAMALLIPURA ROAD CONNECTING NH766 TO NH948 in GUNDLUPETE TALUK 2025-26
265343
PWD/2025-26/BR/WORK_INDENT29797/CALL-2
Open
Bridges/Culverts
PWD Division Office Chamarajanagara
6 documents required · 6 mandatory
Reports on the financial standing of the tenderer,such as profit and loss statements and auditor reports for the last five years i.e.2020-2021 to 2024-25
KPWD Registration Certificate (Class IV and above)
List of existing commitments and ongoing work
List of works for which tenders already submitted
3.2 To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e..2020-21 to 2024-25 (a) achieved in at least two financial years a Minimum financial turn over (in all classes of civil engineering construction works only) of Rs.5.05 lakhs
₹500
₹12,650
17 Feb 2026
10 Feb 2026
18 Feb 2026
11 Feb 2026
11 Feb 2026
REPAIRS TO BRIDGE AT Ch.72.30KM,74.90KM AND 75.30KM ON SH305 HARADANAHALLI CHANNAMALLIPURA ROAD CONNECTING NH766 TO NH948 in GUNDLUPETE TALUK 2025-26
2.6 Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. ---- Including cost of all materials cost of labour cost of equipment and ma... 12.00 100 m2
1.14.1 Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru... 1450.00 m³
2.1.2 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ... 3.60 m³
2.4.3 Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro... 10.05 m³
2.11.h Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,... 0.60 t
14.4.A Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ... 24.00 m³
10.2 Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app... 600.00 m²
8.18 Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding... 52.00 each
14.9 Flexible Apron - Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Ref to MoRT&H : IRC - 2507.2 ---- Including cost... 42.30 m³
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
29797 CALL2 SH.docx
Tender Document • 0.97 MB
Download all tender documents and submit your bid