Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹47.3 LAdmitted-Finance | -7.01% | ₹47.3 L | L1 | Admitted-Finance |
| 2 | L2₹51.6 L+₹4.3 L (9.17%)Admitted-Finance | +1.52% | ₹51.6 L+₹4.3 L (9.17%) | L2 | Admitted-Finance |
Tender Value
₹60 L
EMD Value
₹1.2 L
Closing Date
24 Jun 2026, 11:00 amClosed
EE PWD DN Jaitaran
Jaitaran
Roads Repair work under Jurisdiction of PWD Sub Dn Bar Block Jaitaran (Annual Rate contract 2026-27).
2026_CEPWD_568871_2
Jtn Nit No 04 2026-27
Open Tender
Civil Works
Percentage
270 days
JAITARAN
work
2 documents required · 2 mandatory
₹1,000
EE PWD DN Jaitaran
₹1.2 L
Yes
3 Jul 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
17 Jun 2026 - 24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. by mechanical means. In area of thorny jungle | - | Hect | 12,746 | - |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | - | cum | 25 | - |
| 3 | Restoration of rain cuts with soil, morrum, gravel or a mixtrue of these including all leads and lifts and cost of arrangement of land, cleaning the loose soil, benching for 300mm width, laying fresh material in layers not exceeding 250mm and compacting with plate compactor or power rammer to restore the original alignment levels and slopes complete as per MoRTH specification clause 3002.Mechanical Means | - | cum | 93 | - |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material | - | Cum | 407 | - |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate By Mechanical Means | - | cum | 1,002 | - |
| 6 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 | - | Sqm | 193 | - |
| 7 | Providing and laying rounded hump type speed breakers for crossing speed 25 km/h as per IRC design including providing and applying bitumen emulsion tack coat, making speed breaker in designed profile with bituminous macadam, providing seal coat type B for sealing the voids and marking chequered pattern with thermoplastic paint complete as per IRC : 99-1988 3.70 meter wide and 10 cm high for general traffic | - | Rmt | 3,102 | - |
| 8 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. | - | P. Bag | 7.9 | - |
| 9 | Labour charges for making cofferdam by loading, transporting earth-filled cement bags, dropping at required location in water including transportation by boat (if required) complete, excluding cost of empty cement bags. with lead 150 mtr to 200 Mtr. | - | P. Bag | 5.82 | - |
| 10 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.5 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately) | 1 | Cum | 4,811 | ₹4,806.19 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
Jtnnit.pdf
Tender Documents • 1.79 MB
TENDERDOCUMENTS.pdf
Other Document • 16.29 MB
BOQ_1012242.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .