Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.3 LAdmitted-Finance AJANDE KHURD TAL SHIRPUR DIST DHULE MAHARASHTRA | SHIRPUR | DHULE | MAHARASHTRA | +0.00% | ₹18.3 L | L1 | Admitted-Finance |
| 2 | L2₹18.3 L+₹1,825.11 (0.10%)Admitted-Finance | +0.10% | ₹18.3 L+₹1,825.11 (0.10%) | L2 | Admitted-Finance |
| 3 | L3₹19.6 L+₹1.3 L (7.33%)Admitted-Finance 62 R C PATEL NAGAR NEAR NIMZARI NAKA SHIRPUR TA SHIRPUR DIST DHULE | +7.33% | ₹19.6 L+₹1.3 L (7.33%) | L3 | Admitted-Finance |
Tender Value
₹18.3 L
EMD Value
₹18,251
Closing Date
25 Jun 2026, 3:30 pmClosed
Executive Eng. MIN ZP Dhule
Executive Eng. MIN ZP Dhule
Constructing S.B. No. 1 at Lauki Tal. Shirpur
2026_DHULE_1307478_3
ZPD/MIN/01/2026-2027
Open Tender
Civil Works
Percentage
180 days
Constructing S.B. No. 1 at Lauki Tal. Shirpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹18,251
Yes
4 Aug 2026
11 Jun 2026
29 Jun 2026
11 Jun 2026
25 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No. 1: Excavation in all kinds of soils & Soft murum including boulders upto 0.60 m diameter (0.113 Cum) for canal, seating of embankment, filter drains / catch water drains etc. Lauki no. 1 | 188.48 | cum | 41.96 | ₹7,908.62 |
| 2 | Hard murum Lauki no. 1 | 36.92 | cum | 54.28 | ₹2,004.02 |
| 3 | Soft Rock Lauki no. 1 | 29.47 | cum | 70.6 | ₹2,080.58 |
| 4 | Hard RockLauki no. 1 | 37.95 | cum | 449.61 | ₹17,062.7 |
| 5 | Ittem No.2: Providing and fixing steel anchor (25 mm dia) with resin bond cement capsule anchorage including drilling holes, inserting grout capsule driving anchor, cost of all material Lauki no. 1 | 66 | RMT | 843.27 | ₹55,655.82 |
| 6 | Item No. 3: Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite / graded metal for PCC etc. Lauki no. 1 | 189.87 | cum | 6,075.74 | ₹11,53,600.75 |
| 7 | Item No. 4:Providing reinforcement for R.C.C.work including, cutting, .bending and placing at proper places atc. Complete with initiea lead of 50 M:& 1.5 M.lift A) 8 mm Diameter bar Lauki no. 1 | 0.27 | cum | 66,169.27 | ₹17,865.7 |
| 8 | Item No. : Providing reinforcement for R.C.C.work including, cutting, .bending and placing at proper places atc. Complete with initiea lead of 50 M:& 1.5 M.lift B) 12 mm Diameter bar Lauki no. 1 | 0.62 | cum | 62,011.27 | ₹38,446.99 |
| 9 | Item No. 6: Excavation for Nalla Straightning Lauki no. 1 | 6,298.4 | cum | 31 | ₹1,95,250.4 |
| 10 | Item No. 7: Letter painting for Name board on Bandhara Lauki no. 1 | 1 | No. | 2,000 | ₹2,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
3.pdf
Tender Documents • 2.79 MB
BOQ_2243956.xls
BOQ • 0.25 MB
Corr-1.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .