Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 14 147 VASUNDHRA GHAZIABAD SECTOR 14 VASUNDHRA VASUNDHRA GHAZIABAD UTTAR PRADESH 201012 | GHAZIABAD | UTTAR PRADESH | 201012 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-PreQual/Technical | Not Admitted-PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-PreQual/Technical | Not Admitted-PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-PreQual/Technical | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹39 L
EMD Value
₹39,000
Closing Date
12 May 2023, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
33/11KV S/s RDC, Rajnagar, Gzb
Construction of 33KV link line Sec-135, Noida
2023_PVVNL_800424_1
06/ECWD/Gzb/2023-24
Open Tender
Electrical Works
Item Rate
120 days
Noida
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
EE, EUCD (D), PVVNL, Gzb
₹39,000
25 May 2023
4 May 2023
12 May 2023
4 May 2023
12 May 2023
4 May 2023
1. Safe carriage of SP-55, 11 meter S.T.Pole from any stores centres under PVVNL, depending upon the availability of material at Stores Centres, with loading & unloading at both ends respectively.
2. a). Loading, Safe carriage & unloading of heavy stock material (other than pole) from any stores centres under PVVNL, depending upon the availability of material at Stores Centres, with loading & unloading at both ends respectively.
b). Loading, Safe carriage & unloading of 33KV, 3x300Sq.mm. XLPE Alumn.Cable, from any stores centres under PVVNL, depending upon the availability of material at Stores Centres, with loading & unloading at both ends respectively.
3. Riser Double Pole The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all clamps and other accessories as per drawing. The work includes carriage and handling of supports & hardware material from sectional store to pit site as well as an fabrication work if required. Fixing of 04 Nos. M.S.Channel 100x50x2.4Mtr (With arrangement of 06 Nos. 33KV Pin insulator with Pin). The work also includes cutting of channel/angles, making holes on M.S.Channel / M.S. Angle, spring washer of proper size for channel/angle. Contractor also provide M.S.Channel clamps size of (75x10mm) and E- clamps size of (75x10mm) at his own cost as per Respo Norms. a) 11M Long STP, SP-55 Round Pole
4. Grouting of supports in CC 1:3:6 (Cement, sand & 20mm stone grift). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, upto ground level, 300mm plinth (Dia 51Cm) above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grift) with muffing as per drawing. Work includes back filling and proper ramming. i). Riser Double Pole a). 11M Long STP, SP-55 Round Pole
5. Earthing of supports with M.S. earth Rod of (20x2500)mm long including excavation of pit and driving M.S.Rod 3.0M apart from suppor and 0.5M below the ground level and connecting belowl the earth electrodes with the help of G.I.wire No.8SWG and earthing lugs.
6. Making Jumpers on Sectional Pole, by providing & fixing of P.G.Clamps of proper sizes, suitable for Dog Conductor/ 33KV, 3x300Sq.mm XLPE cable. a) Riser Double Pole
7. Providing & fixing of SMC Danger board at each location as per specification of the drawing. Size 200mmx250mm & 3mm thickness with G.I.Clamp & nut & bolt.
8. Providing & fixing of SMC Number Plate at each location as per specification of the drawing. Size 200mmx250mm & 3mm thickness with G.I.Clamp & nut & bolt.
9. Making H.T.Connection of the proposed line from 33KV Line. The work consists of fixing & fabrication of Dropper Channels, & fixing of Disc Insulators, Pin Insulators, G.I.Pipe 150mm dia, jumpering with P.G.Clamps, clamping and binding etc,as per site conditions.
10. Providing & Wrapping of barbed wire on 33KV ST Poles SP-55/SP-72 as anti-climbing device for a length of 0.9Mtr. Wire pitch/gap 13mm and fixing upper and lower end keeping lower end at a height of 2.75Mtr. from the ground, complete with providing and fixing of lower end & upper end clamps made of M.S.Flat 40x5mm complete with nuts & bolts.
11. Painting of following supports/structures of 33KVLine, with two coats of synthetic enamel aluminium paint after one coat of ready mix primer, including cost of all material, as well as rubbing/cleaning of surface as required for proper completion of work:- a). 11Mtr SP-55 Poles including all channels/x-arms/clamps etc. (i) Cable Riser double Pole.
b). 33KV line isolator structure
c). 33KV Cable support structure
12. Line Isolator structure i). Fabrication of Structure, including cutting, straightening & drilling of holes in Channel/Angle.
ii). Excavation of earth-1x(1.10Mx0.60Mx1.0M)x2M
iii). Erection of Line Isolator structure in proper alignment
iv). Grouting of structure of size 1x(1.10Mx0.60Mx1.00M)x2M with C.C. ratio 1:3:6 (cement, sand, 20mm Stone grift).
v). Making plinth by C.C. ratio 1:3:6 (cement, sand, 20mm Stone grift) in size 1x(1.10Mx0.60Mx0.30M)x2M
vi). 12mm thick plastering on plinth in ratio 1:4 (cement : fine sand) of size-1x1x(1.10Mx0.30M)x1+1x(0.60M x0.30M) 1x1+1 x(1.10M x 0.60M)x2M
vii). Supply & fixing of stone pad of Size 300x300x75mm.
viii). Supply & Laying of G.I.Earth strip of size 50x6mm for connecting the Earth Mat with steel structure (Isolator & Cable support structure). The work also includes cutting, bending, straigthning, over-lapping and welding the earth strip with Earth Mat and various steel structures by using high quality Arc welding in already digged trenches.
ix). Painting of Earth Strip of size (50x6)mm with one coat of ready mixed primer with two coats of ISI mark synthetic oil enamal green paint.
13. Erection of 33KV line isolator on isolator structure with proper alignment & fitting.
14. 33KV Cable support structure (03 Nos.). i). Fabrication of structure, including cutting, straightening, drilling of holes and electric welding.
ii). Excavation of earth (1.0Mx0.30Mx1.0M)x3
iii). Erection of 33KV cable support structure in proper alignment with stone Pad.
iv). Grouting of size (1.0Mx0.30Mx1.0M) with C.C. in ratio 1:3:6 (cement, sand, 20mm Stone grift)x3
v). Supply & fixing of stone pad.
vi). Making plinth by C.C. ratio 1:3:6 (cement, sand, 20mm Stone grift) in size of (1.0Mx0.30Mx0.30M)x3
15. Digging of Cable Trench of size 1050mmx750mm, for laying of 33KV, 3x300Sq.mm. Cable, along the Road.
16. Safe laying of 33KV, 3x300Sq.mm. XLPE Cable in Cable Trench to respective Double Pole.
17. Providing & Laying of Ist Class Bricks, along the length on both side of 33KV XLPE Cable in Cable Trench (minium 27No. Bricks/Mtr per Cable) and Stone Slab (Smooth surface both side) of size 450x600x40mm on top of the each Cable, including providing & filling River Sand inside the Bricks as per specification.
18. Back filling of excavated earth in the cable trench upto the ground level and ramming properly.
19. 33KV 3x300Sq.mm XLPE cable laying charges in Existing Pucca trench including open the cover trench & after laying of 33KV cable in trench properly covered the trench by trench cover in all respect.
20. Providing and laying of HDPE Pipe PE-80, PN-6, DN-160mm dia Pipe for laying of 33KV, 3x300Sq.mm, XLPE Cable with HDD (trenchless) method.
21. Laying of 33KV, 3x300Sq.mm XLPE cable in HDPE Pipe PE-80, PN-6, DN-160mm dia by HDD trenchless method, as per site requirement.
22. Laying of 33KV, 3x300Sq.mm XLPE Cable in the air/G.I.Pipe and mounting and clamping 2No. 33KV XLPE Boxes on double pole structure and making connection with 33KV over head line at both ends.
23. Providing and fixing 150mm dia 2mm thick 3M long G.I.Pipe over 33KV, 3x300Sq.mm XLPE Cable before mounting the 2No. Cable on double pole. Work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm.
24. a). Providing, Fixing & Laying of G.I.Pipe 150mm Dia thickness at Nala X-ing Work includes G.I.Clamps, Nut bolt & washer, bricks, cement, sand & stone grift etc.
b). Laying of 33KV, 3x300Sq.mm XLPE cable in G.I.Pipe 150mm Dia, as per site requirement.
25. Making of 33KV Outdoor type cable end termination by heat shrinkable XLPE Cable Jointing Kits and crimping with proper size aluminium lugs. Work includes providing Aluminum lugs, insulating tapes etc as per specifications.
26. Making of 33KV Straight through Cable Jointing Kits 3x300mm² and crimping of proper size aluminium lugs. Work includes providing insulating tapes etc as per specifications.
27. Supply & fixing of cable route marker along the route of 33KV cable with proper grouted with proper painting & marking PVVNL, 33KV HT Cable.
28. Road restoration charges for 1Mtr wide Kuccha Road (Inter locking Tiles, Bricks Road & Developed green belt only).
29. Road restoration charges for 1Mtr wide Pucca Road (Cemented, Concrete & Black road only).
30. Cartage of empty cable drum from site to PVVNL store including loading & unloading at both ends respectively.
Maverick Power Solutions Pvt. Ltd
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .