Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.7 LAccepted-AOC 5A 76 CALDWELL COLONY 1ST STREET TUTICORIN 628 008 | TUTICORIN | TAMIL NADU | 628008 | ₹9.7 L Quoted ₹10.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹11.1 LRejected-AOC | ₹11.1 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | PRADIP ENGINEERING ASSOCIATES L1 | BIRUNTHA ENGINEERING CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for overhauling of PA fans A & B for one unit including cost of consumables & hire charges for T&P’s (scope of work in Sl.No.i to x) | 2 | No. | 4,47,126 ₹5.3 L | 4,55,256 ₹5.4 L |
| 2.00 | Charges for dismantling the adjustable vane assembly, cleaning of parts, replacing all the wornout spares like bushes etc, assembling including cost of consumables and T&Ps. | 2 | No. | 88,872 ₹1.0 L | 90,488 ₹1.1 L |
| 3.00 | Charges for cleaning ash and other foreign materials from the inner side of the take off point of the suction duct to fan spiral casing and delivery duct from fan spiral casing to APH bottom and inter connection ducts. | 2 | No. | 16,332 ₹19,271.76 | 16,630 ₹19,623.40 |
| 4.00 | Charges for transportation of required scaffolding materials clamps, wooden blanks etc. from pocket stores to site, leading, lifting and erection of temporary platform near fan spiral casing, suction, interconnection & discharge ducts for welding the eroded weld joints & dismantling the platform and returning to stores after completion of work. | 9 | No. | 57,150 ₹67,437 | 58,194 ₹68,668.92 |
| 5.00 | Charges for welding the eroded weld joints in suction & delivery ducts of PA fans including consumables like welding electrodes, hand gloves, welding machine and T&P’s (for a minimum thickness of 6 mm weld metals) | 150 | Mtr. | 25,050 ₹29,559 | 25,500 ₹30,090 |
| 6.00 | Charges for dismantling the adjustable vane for the overhauling of IGV assembly, assembling the adjustable vanes on the shaft after overhaul, tag welding of bolts, checking the operation of adjustable vanes including consumables and T&Ps. | 34 | No. | 41,888 ₹49,427.84 | 42,636 ₹50,310.48 |
| 7.00 | Charges for reconditioning the fan spiral casing (bottom portion) diffuser core and outlet elbow by removing the guide vanes, marking the wornout portion, cutting & bending the plate to the require profile, fixing the plate with the spiral casing / diffuser core / outlet elbow, welding and fixing the guide vanes in its original position including all consumables and T&P's | 2 | No. | 55,390 ₹65,360.20 | 56,396 ₹66,547.28 |
| 8.00 | Charges for painting the bearing cooling water inlet and outlet lines to MLOP’s and FLOP’s from the point of main intake and return headers up to PA fan A & B and PA fan A&B suction and discharge and interconnection air duct with stiffener with one coat of enamel paint and sundries. | 765 | M² | 68,850 ₹81,243 | 70,380 ₹83,048.40 |
| 9.00 | Charges for cutting and removal of heavily wornout primary & secondary air duct and its supports transporting & devoluting scrap to Central Stores/T.T.P.S. | 15 | M² | 18,585 ₹21,930.30 | 18,915 ₹22,319.70 |
| 10.00 | Charges for transporting of 6mm M.S.Plate/ Supports to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct above 1.5 meter level and welding the same | 21 | M² | 45,675 ₹53,896.50 | 46,494 ₹54,862.92 |
Tender Value
Refer Docs
EMD Value
₹9,900
Closing Date
5 Jan 2026, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit II Overhauling of PA fans A B in Unit II for the year 2025 2026
2025_EB_632763_1
CE/TTPS/SE/M-II/No.335/2025-26
Open Tender
Miscellaneous Works
30 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹9,900
Yes
25 Mar 2026
16 Dec 2025
6 Jan 2026
16 Dec 2025
5 Jan 2026
16 Dec 2025
Charges for overhauling of PA fans A & B for one unit including cost of consumables & hire charges for T&P’s (scope of work in Sl.No.i to x)
Charges for dismantling the adjustable vane assembly, cleaning of parts, replacing all the wornout spares like bushes etc, assembling including cost of consumables and T&Ps.
Charges for cleaning ash and other foreign materials from the inner side of the take off point of the suction duct to fan spiral casing and delivery duct from fan spiral casing to APH bottom and inter connection ducts.
Charges for transportation of required scaffolding materials clamps, wooden blanks etc. from pocket stores to site, leading, lifting and erection of temporary platform near fan spiral casing, suction, interconnection & discharge ducts for welding the eroded weld joints & dismantling the platform and returning to stores after completion of work.
Charges for welding the eroded weld joints in suction & delivery ducts of PA fans including consumables like welding electrodes, hand gloves, welding machine and T&P’s (for a minimum thickness of 6 mm weld metals)
Charges for dismantling the adjustable vane for the overhauling of IGV assembly, assembling the adjustable vanes on the shaft after overhaul, tag welding of bolts, checking the operation of adjustable vanes including consumables and T&Ps.
Charges for reconditioning the fan spiral casing (bottom portion) diffuser core and outlet elbow by removing the guide vanes, marking the wornout portion, cutting & bending the plate to the require profile, fixing the plate with the spiral casing / diffuser core / outlet elbow, welding and fixing the guide vanes in its original position including all consumables and T&P's
Charges for painting the bearing cooling water inlet and outlet lines to MLOP’s and FLOP’s from the point of main intake and return headers up to PA fan A & B and PA fan A&B suction and discharge and interconnection air duct with stiffener with one coat of enamel paint and sundries.
Charges for cutting and removal of heavily wornout primary & secondary air duct and its supports transporting & devoluting scrap to Central Stores/T.T.P.S.
Charges for transporting of 6mm M.S.Plate/ Supports to Boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct above 1.5 meter level and welding the same
SKF Make Imported Angular Contact Ball Bearing 7234 BCBM
Cylindrical roller bearing N234 C3
BIRUNTHA ENGINEERING CONSTRUCTION (BID ID -1545215)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_757310.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid