Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-Finance | 1 | Accepted-Finance Price Bid is evaluated | |
| 2 | 2₹1.3 L+₹14,100 (12.3%)Accepted-Finance | 2 | Accepted-Finance Price Bid is evaluated |
| Sl No | Description | Qty | Unit | R.K.V. ENTERPRISES L1 | sri mugunthan contractors L2 |
|---|---|---|---|---|---|
| 1.00 | Removing of pump half coupling, checking pump float, removal of Bearing chamber and bearings, Disconnecting air vents and cooling water lines, suction and discharge flanges and lifting the pump. | 1 | No | 40,500 ₹47,790 Lowest | 45,000 ₹53,100 |
| 2.00 | Placing the spare Condensate extraction Pump on the canister and restoring the suction and discharge pipe connection | 1 | No | 11,400 ₹13,452 Lowest | 15,000 ₹17,700 |
| 3.00 | Assembling the bearings chamber restoring the pump Half coupling air vent and cooling water line, Checking and correcting pump float successful commissioning of the pump | 1 | No | 55,400 ₹65,372 Lowest | 60,000 ₹70,800 |
| 4.00 | Decoupling, Alignment & Coupling of Condensate Extraction Pump with motor | 1 | No | 7,600 ₹8,968 Lowest | 9,000 ₹10,620 |
Tender Value
Refer Docs
EMD Value
₹1,300
Closing Date
24 Sept 2026, 2:00 pmClosed
CE/TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin 628004.
TTPS Mech II TM II Unit V Replacement of defective Condensate Extraction pump 5A by Spare pump
2026_EB_702761_1
CE/TTPS/SE/M-II/No.88/2026-27
Open Tender
Miscellaneous Works
Item Rate
5 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹1,300
Yes
29 Sept 2026
9 Sept 2026
25 Sept 2026
9 Sept 2026
24 Sept 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing of pump half coupling, checking pump float, removal of Bearing chamber and bearings, Disconnecting air vents and cooling water lines, suction and discharge flanges and lifting the pump. | 1 | No | 55 | ₹55 |
| 2 | Placing the spare Condensate extraction Pump on the canister and restoring the suction and discharge pipe connection | 1 | No | 55 | ₹55 |
| 3 | Assembling the bearings chamber restoring the pump Half coupling air vent and cooling water line, Checking and correcting pump float successful commissioning of the pump | 1 | No | 55 | ₹55 |
| 4 | Decoupling, Alignment & Coupling of Condensate Extraction Pump with motor | 1 | No | 55 | ₹55 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_844816.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .