Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAccepted-Finance | ₹33.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹34.1 LRejected-Finance | ₹34.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹40.1 LRejected-Finance | ₹40.1 L | L3 | Rejected-Finance L3 |
| 4 | L4₹40.4 LRejected-Finance | ₹40.4 L | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
Updated dates
Tender Value
₹40.8 L
EMD Value
₹81,700
Closing Date
6 Feb 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Temporary Laying of Brick Kharanja work in Village-Khwajpur, YEA WC-06
2026_YEIDA_1107376_10
YEA/GM(PROJECT)/2026/455 DT-14/01/2026
Open Tender
Civil Works
120 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹999
₹81,700
4 Jun 2026
20 Jan 2026
10 Feb 2026
20 Jan 2026
6 Feb 2026
20 Jan 2026
Earth work in excavation in ordinary in all of foundation tranches including dressing of side and ramming of bottom lifts upto a 1.5m including getting out the excavation soil and disposal of surplus excavated soil as directed with in a lead of 50m . AR
Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17
M-150 brick work in 1:4 cement and Coarse sand of ( 2.20 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/203+(205)
12 mm cement plaster of mix : 1:6 (1cement :6 coarse sand) DAR-18/13.4.2
concrete with 2cm Guage Stone grit , Coarse Sand& Cement in the proportion of 4:2:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/279a/P-17
Dry brick on edge flooring in required pattern with bricks of class designation 150 on a bed of earth including filling compressed, with M-150 bricks. (DAR/11.2/AR/YEIDA/Based on UPPWD/SOR-2020)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works DAR- 18 /10.25.2
Earth work in rough excavation , banking excavaated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil. Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to site spreading ,grading to required slope and compacting to meet requirement of table 300-2 up to 5 km Morth 2019/3.16/305
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
BOQ_2044581.xls
BOQ • 0.27 MB
10.pdf
Tender Documents • 1.41 MB
Download all tender documents and submit your bid